2004-07-22 00:00:00 | SUBMITTALS - REBAR SHOPS, |
| |
| |
| REBAR SHOPS DRAWINGS - |
| PARKING 8TH TOP |
| PARK 6TH/LOFT 4TH BEAMS/WALLS #63 |
| PARK 6TH/LOFT 4TH BEAMS/WALLS #63A |
| PARK 6TH/LOFT 4TH BOTTOM #61 |
| TOWER 7TH FL. LANAI BEAMS & WALLS #74 |
| PARK 6TH/LOFT 4TH. TOP #62 |
| GROUND SLAB, THICKED & VERTICALS |
| 49-PC-SP. BOTTOM MAT & ADDIT |
| POUR #39 COLUMS TO 2ND LEVEL MEZZANINE |
| AND GUARAGE LEVEL 2 |
| PARK 5TH FL. BOTTOM BEAME & WALLS #59 |
| TOWER 11TH. FL. TOP #78 |
| TOWER 7TH FL. LAMAI BEAMS & WALLS #74A |
| TOWER 8-10TH (TYP) TOP #76 |
| SW #4 6TH FL. PARKING TO ROOF #56 |
| SW #3 6TH FL. PARKING TO ROOF #55 |
| TOWER 7TH FL. LANAI BEAMS & WALLS #74 |
| POUR#5 (AAREA 11) COLS G6 @ ROOF #53 |
| PARK 7TH LOFT 5TH FL. BEAMS & WALLS #66A |
| SW #5 6TH FL. PARKING TO ROOF #57 |
| PARK 8TH FL. BOTTOM, BEAMS & WALLS #67 |
| PARK 9TH/TOWER 6TH FL. TOP #74A |
| SHARWALLS #1&2 TO 12TH FL. #54 |
| TOWER 12/16TH FL. TOP. #80 |
| TOWEWR 12/16TH FL. BOTTOM & BEAMS #79 |
| POUR #3. FDN, DWLS & G.BEAMS #7 |
| TOWER 7TH FL. LANAI BEAMS & WALLS #88A |
| PAARKING SECOND LEVEL & LOFT SECOND |
| LEVEL FRAMING PLAN. |
| POURS #6-8 COLS TO M,GS & L2 #17-17B |
| TOWER MAIN FOOF,BOTTOM & BEAMS. #81(75) |
| POUR #3 COLS (AREA 7) G6 @ ROOF.#51(58) |
| TOWER 11TH FL. BOTTOM & BEAMS #77(89) |
| PARK 9TH/TOWER 6TH FL. BOTTOM #69(65) |
| TOWER MAIN ROOF. BOTM,BEAMS,WALLS |
| TOWER MAIN ROOF TOP, TCOL & WALLS |
| PARKING 8TH TOP |
| POUR #1 PART MEZZANINE SLAB @+12-5 |
| RETAINING WALLS POURS 6-8 #20 |
| POUR #4-9 FOUNDATION #11(21) |
| 49-PC-SP. TOP MAT & ADDIT. #22(26) |
| PARK 7TH/LOFT 5TH. TOP#65 |
| 84-PC-SP. BOTTOM MAT & ADDITIONAL #12 |
| STAIRS 1,2,4,10#32 (38) |
| PARK 9TH/TOWER 6TH. BEAMS & WALLS |
| PARK 9TH/TOWER 6TH. TOP #70 |
| POUR #5 COLS TO 2ND & MEZZ #16 |
| 76PC-SP. TOP MAT, ADD & SW-5 DWLS #4(12) |
| R-1A-7 PILE CAP 76 PCSP BOTTOM BARS |
| R-1A-8 PILE CAP 76PCSP TOP BARS |
| R-1A-9 PILE CAP 76PCSP STANDEES AND |
| CARRY BARS |
| R-1A-10 PILE CAP 76PCSP COL SW #5 DOWELS |
| ALUMINUM RAIL @ RAMP AR-SW-1 |
| POUR #59 15TH FL. SOUTH SIDE |
| POUR #2 COLS (AREA 6) G5 @ ROOF |
| 2ND FL. POUR #5,6,7,9,11. BOTTOM |
| POUR #4: COL & SW-5 TO MEZZ |