2003-06-03 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 11
 FHA-98 DESIGN MANUAL
  
 A) FROM PREVIOUS REVIEW: - NOT ADDRESSED
 1) SHT P2.01 VENT REQUIRED IN TRASH ROOM
 2) ALL UNITS - WET VENTS IN BATHROOMS,
 ONLY THE FIXTURES WITHIN THE BATHROOM
 GROUPS SHALL CONNECT TO THE WET-VENTED
 HORIZONTAL BRANCH DRAIN. ANY ADDITIONAL
 FIXTURES SHALL DISCHARGE DOWNSTREAM OF
 THE WET VENT. (KITCHEN SINKS AND WASH-
 MACHINES SHALL NOT DRAIN THROUGH BATH-
 ROOMS.) SEC 909.1 - THESE CONDITIONS
 SHALL BE CORRECTED ON THE SANITARY RISER
 DIAGRAMS AND ALL FLAT LAYOUTS.
 3) SHT P2.31 HORIZONTAL RWL NOT SIZED
 PROPERLY. SHOWS 4" @ 2900 SQ FT & 2800
 SQ FT. (ORIGINAL #16) RESPONSE NOTED,
 BUT NO CHANGE NOTED.
 4) SHT P2.39 PLEASE SUBMIT CALCULATIONS
 FOR PRIMARY AND SECONDARY ROOF DRAINS.
 SHOW ALL AREAS OF ROOFS THAT DRAIN TO
 ROOF FROM ABOVE. (NOT SHOWN IN CALCULAT-
 IONS AS REQUESTED IN COMMENT #19 IN 1ST
 REVIEW.)
 5) SHTS P2.40 & P2.41 PIPE SIZING FOR
 VENT HEADER SHALL BE SIZED PER TABLE
 916.1. SECTION FROM VENT #10 BACK TO
 WHERE VENT #44 TIES IN PAST #12 SHALL
 BE 5". 4" PIPE SHOWN. (COMMENT TO RES-
 PONSE FROM COMMENT #21 1ST REVIEW).
 6) SHT P2.44 SHOW PIPE SIZE FOR RWL.
 SHOWS 6" @ 4000 SQ FT, BUT ITS ACTUALLY
 IT'S 5000 SQ FT AND SHOULD BE 8" PIPE.
 RESPONSE NOTED BUT NO CHANGE NOTED.
 (COMMENT #22 FROM 1ST REVIEW.)
 7) SHT P2.05 VENT REQUIRED FOR FLOOR
 DRAIN IN BREEZEWAY DRIVE. (RESPONSE
 NOTED, BUT VENT REQUIRED) #24 1ST REV.
 8) SHT P2.05 VENTS REQUIRED FOR FLOOR
 DRAINS IN TRASH ROOM AND TRASH TERMIN-
 ATION ROOM. (RESPONSE NOTED, BUT VENTS
 REQUIRED.) #25 1ST REV.
 9) SHTS P2.01 THRU P2.05 CLEANOUTS REQ-
 UIRED BY SECTIONS708.3, 708.3.1, 708.3.3
 & 708.3.4 SHALL BE SHOWN ON SHTS P2.01
 THRU P2.05, HORIZONTAL PLUMBING LAYOUT,
 AND NO SHT P3.13 HORIZONTAL SANT. RISER
 DIAGRAM. (NEW COMMENT)
 10) SHT P3.13 SHOW PIPING THAT IS NOT
 SHOWN ON GROUND LEVEL LOBBY AREAS.
 PLEASE SUBMIT A SHEET THAT SHOWS THE
 AREA BETWEEN THE NORTH SIDE AND THE
 SOUTH SIDE TO SHOW HOW PIPING TIES IN
 FOR AREA NOT SHOWN. SEC 104.2.1
 11) SHT P2.49 UNABLE TO VERIFY RESPONSE,
 SHEET IS COMPLETLY CHANGED AND ONE COPY
 OF ALL SHEETS THAT HAVE BEEN REMOVED AND
 OR REVISED FOR COMPARISON. #26 1ST REV.
 12) SHT P2.49 INFORMATION FOR FOUNTAIN
 SHALL BE SUBMITTED AT TIME FOR PERMIT
 APPLICATION. SEPARATE PERMIT REQUIRED.
 #27 1ST REV.
 13) SHTS P3.02,P3.03,P3.04,P3.05,P3.06,
 P3.07, & P3.08 WATER HAMMER ARRESTORS
 SHALL BE INSTALLED AT EVERY WASH MACHINE
 ICE MAKER & DISHWASHER. SOME W/M'S SHOW
 THEM AND SOME KITCHEN SINKS SHOW THEM,
 BUT NOT ALL HAVE THEM SHOWN WERE REQUIR-
 ED BY SECTION 604.9. #28 1ST REV.
 14) SHT P3.09 RWL SHOWS 4" @ 1900 SQ FT
 ON VERTICAL. BUT RISER ALSO RUNS HORIZ-
 ONTAL, (OFFSET). 5" RISER REQUIRED. RE-
 SPONSE NOTED BUT NOT ADDRESSED. #30 1ST
 REVIEW. TABLE 1106.3
 15) SHT P3.10 RWL BY DECK, NO PIPE SIZE
 SHOWN. RESPONSE NOTED BUT SIZE NOT SHOWN
 #31 1ST REV.
 16) SHT P3.10 RWL RISER ALSO RUNS HORIZ-
 ONTAL, 8" RISER REQUIRED. RESPONSE NOTED
 BUT SIZE NOT CORRECTED. #32 1ST REV.
 17)SHT P3.10 RWL RISER SHOWS 5" @3000 SQ
 FT PICKING UP 2 ROOF DRAINS. HORIZONTAL
 RUNS, 6" REQUIRED. RESPONSE NOTED BUT
 CORRECT SIZE NOT SHOWN. #33 1ST REV.
 18) SHT P3.10 PIPE SIZE NOT SHOWN FOR
 RWL IN SOME AREAS. RESPONSE NOTED BUT
 SOME PIPE SIZES STILL NOT SHOWN. PLEASE
 RECHECK ALL PIPING FOR RWL RISER DIAGRAM
 AND SIZE ALL PIPE AND RECHECK FOR CORR-
 ECT SIZE PER TABLE 1106.3#34 1ST REV.
 19) SHT P3.10 RWL RISER SHOWS 6" @ 6900
 SQ FT, REQUIRES 8" AT HORIZONTAL RUN.
 RESPONSE NOTED, BUT SIZE NOT CHANGED.
 #36 1ST REVIEW.
 20) SHT P3.10 RWL RISER SHOWS 5" @ 5700
 SQ FT HORIZONTAL RUNS REQUIRE 8" PIPE.
 RESPONSE NOTED BUT PIPE SIZE NOT CHANGED
 #37 1ST REV.
 21) SHT P3.13 FLOOR DRAIN NOT VENTED.
 RESPONSE NOTED, VENTS STILL REQUIRED.
 TABLE 906.1
 22) SHT A5.11 FOUNTAIN EQUIPMENT AREA
 MORE INFO REQD. RESPONSE REFERS TO SHT
 A5.11 WHICH REFERS TO L.S. PLANS. NO
 LS PLANS FOUND. PLEASE CLAIRFY. #44 1ST
 REVIEW.
 23) SHTS A8.01 THRU A8.14 RESPONSE NOTED
 FOR WATER COOLERS AT LIVE/WORK LOFTS.
 MANUF. INFO. REQUIRED FOR WATER COOLERS
 AT TIME OF FINAL. 410.1
 24) SHTS A8.12/A8.13 TERRACE DRAINS. RE-
 SPONSE NOTED, BUT SHTS P2.32 & P2.33 DO
 NOT REFLECT SHTS A8.12 & A8.13. 11TH FL
 AND 4TH FLOOR. PLEASE CLAIRFY. #49 1ST
 REVIEW.
 25) PLEASE SUBMIT TYPE OF MATERIAL USED
 FOR PAN DRAIN, RELIEF VALVE PIPING. RE-
 SPONSE NOTED BUT MATERIAL NOT SHOWN. #55
 1ST REVIEW.
 26) BACKFLOW REQUIRED FOR SWIMMING POOL,
 IRRIGATION, AND MAKE UP WATER FOR THE
 COOLING TOWERS. RESPONSE NOTED, BUT EACH
 SYSTEM SHALL BE PROVIDED WITH BACKFLOW
 PROTECTION. PLEAS INDICATE HOW EACH SYS-
 TEM HAS BACKFLOW PROTECTION. #58 1ST REV
 28) RESPONSE NOTED FOR POOL PUMP AND
 EQUIPMENT ROOM, SEPARATE PERMIT REQUIRED
 FOR POOL. WASTE SHALL DRAIN TO SANITARY
 AND OVERFLOW SHALL DRAIN TO STORM. PRO-
 VIDE DETAIL FOR EACH. #59 1ST REVIEW.
 29) SHTS P2.02 & P2.05 FIRE SPRINKLER
 SYSTEM DRAIN SHALL DRAIN TO SANITARY NOT
 STORM AS INDICATED. PLEASE REVISE
 30) SHT P3.14 WASTE STACK #30 SECTION
 910.2 THE STACK SHALL BE VERTICAL AND
 BOTH HORIZONTAL & VERTICAL OFFSETS SHALL
 BE PROHIBITED.
 31) SHT P2.44 TABLE 906.1 MAXIMUM DIS-
 TANCE OF FIXTURE TRAP FROM VENT FOR A
 3" TRAP IS 10'. FLOOR DRAINS FOR THE
 SAUNA AND THE STEAM ROOM SEEM TO EXCEED
 THIS AMOUNT.
 ********WHEN RESUBMITTING PLANS********
 PLEASE CLEARLY INDICATE THE REVISION AND
 REMOVE AND REPLACE ANY PAGES AS NECESS-
 ARY. SUBMIT (1) SET OF OLD DRAWINGS WITH
 THE PLANS WHEN RESUBMITTING PLANS. A
 TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR
 SPECIFICATION PAGE WHERE THE CHANGES CAN
 BE FOUND, WILL HELP TO EXPEDITE YOUR
 PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377
 (561) 805-6721
 FAX (561) 653-2692


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved