Plan Review Notes For Permit 02030811 |
Permit Number |
02030811 |
|
Review Stop |
B |
Sequence Number |
3 |
|
Notes |
Date |
Text |
2003-01-17 00:00:00 | BUILDING REVIEW CHECKLIST: | | 1-PRODUCT APPROVAL SUBMITTED IS OTHER | | THAN THE ONE SUBMITTED ORIGINALLY. | | ENGINEER OF THIS PRODUCT APPROVAL | | DEMANDS THAT DRAWINGS TO BE SIGNED AND | | SEALED BY HIM IN ORDER TO BE USED FOR | | BUILDING PERMIT. SEE NOTE #10 ON SHEET | | 1 OF 5.ALSO, SINGLE SHEET SUBMITTED | | DRAWING 02-279 NEEDS TO BE SIGNED AND | | SEALED BY ENGINEER TO BE USED FOR | | BUILDING PERMIT. SEE NOTE#9. | | 2-THIS PERMIT DIDN'T PASS INSPECTIONS | | BECAUSE APPARENTLY INSTALLATION DIDN'T | | MATCH PRODUCT APPROVAL SUBMITTED. | | NEED COORDINATION WITH THE BUILDING | | INSPECTOR TO VERIFY THAT FIELD CONDI- | | TIONS MEET THE REQUIREMENTS OF PRODUCT | | APPROVAL. | | 3-CLEARLY MARK ON DRAWINGS THE SPECIFIC | | MOUNTING CONDITIONS AND ANCHOR TYPE | | & SPACING TO BE USED ACCORDING TO THE | | MEAN ROOF HEIGHT, DESIGN PRESSURES, | | EDGE DISTANCE, PANEL SPAN, CONNECTION | | TYPE AND STRUCTURE TO BE ATTACHED TO. |
|