Plan Review Notes
Plan Review Notes For Permit 02030743
Permit Number 02030743
Review Stop P
Sequence Number 2
Notes
Date Text
2002-05-21 00:00:00DENIED
 REFERENCE: FBC-2001 CHAPTER 11
 FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
  
 1) SHT P-101 ICE MACHINE DETAIL - FILTER
 SHALL BE NSF COMPLIANT. SUBMIT MANUF. IN
 FORMATION.
 2) SHT P-101 SUBMERSIBLE SUMP PUMP, MAN-
 UFACTURE INFO SHOWING LISTING REQD.
 3) SHTS P-202, 203, ALL
 CONDENSATE SHALL BE PIPED SEPARATELY TO
 THE OUTSIDE OF BLDG AND TIED INTO STORM
 OR DRYWELL. SEE COLS. 14-A/B, 11-B/C
 SHT P-202. SEE RM #G-05 SHT P-203.
 4) SHT P-201, ELEVATOR #1 DRAINS TO RAIN
 WATER CATCH BASIN AND HAS NO BACKWATER
 VALVE. ELEVATOR #3 HAS AN AREA DRAIN
 WITH A BACKWATER VALVE IN LINE AND DIS-
 CHARGES TO AN OIL AND SAND INTERCEPTOR.
 PLEASE CHECK WITH ELEVATOR COMPANY TO
 SEE IF THIS IS ACCEPTABLE TO HOOK UP
 DIRECTLY IN ELEVATOR PIT.
 5) PLEASE ROUTE PLANS THROUGH DEPT OF
 BUSINESS HOTEL AND RESTURANT DIVISION
 FOR PLAN REVIEW BEFORE RESUBMITTING FOR
 PLAN REVIEW.
 6) SHT P-302 ITEMS #82/115 FILTERS, NSF
 APPROVAL REQUIRED. SUBMIT MANUF. INFO
 7) PLEASE SHOW FIXTURE UNITS AS THEY
 ACCUMULATE ON THE SANITARY RISER DIAGRAM
 8) SHT P-401 MECH ROOM M-13 FLOOR DRAIN
 NOT SHOWN ON SANT RISER DIAGRAM.
 9) SHT P-401 SANT RISER FOR MECH ROOMS
 M-13, 2-28, 3-016 NOT SHOWN ON SANT RIS-
 ER DIAGRAM. PLEASE SHOW RISER AS SHOWN
 ON FLAT DRAWING IN WOMENS ROOM G-39 &
 MENS ROOM G-40, PICKING UP ALL MECH RMS
 AND VENT THROUGH ROOF.
 10) SHT P-401 FLOOR DRAIN ON SANT RISER
 DIAGRAM SHOULD BE CHANGED TO FLOOR SINK
 AT WATER HEATER. (CHANGED ON FLOOR PLAN)
 11) SHT P-402 KITCHEN EQUIP PLMG SCHED.,
 SHOWS 1 FRYER, GAS RISER SHOWS 2. PLEASE
 CLAIRFY.
 12) SHT P-402 WATER RISER DIAGRAM, ALL
 WATER HAMMER ARRESTORS SHALL BE LOCATED
 NEAR FIXTURES IN AN "EFFECTIVE RANGE"
 NOT AT TOP OF DROP. LOCATE PER MANUFACT-
 URE INSTALLATION INSTRUCTIONS AND PDI-
 WH 201. (SOME CHANGED NOT ALL)
 13) ALL GAS PERMIT APPLICATION REQUIRE-
 MENTS FROM PREVIOUS REVIEW HAVE NOT BEEN
 ADDRESSED. PLEASE SUBMIT INFORMATION.
 14) SHT A-106 & A-210 CEO TOILET ROOM
 CAN NOT CHANGE FLOOR PLANS TO COMPLY
 WITH ADAPTABILITY. STRUCTURAL CHANGES
 FOR ADAPTABILITY IS NOT APPROVED.
 PLEASE SHOW DETAILS FOR ADAPTABILITY.
 SHOWER CURB TO BE NO MORE THAN 1/2",
 BACKING FOR ALL GRAB BARS, SPACING FOR
 W/C ECT.
 15) TO WHERE DOES THE RAIN WATER FROM
 THE CANOPY DRAIN?
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved