2002-05-16 00:00:00 | ***********DENIED*********************** |
| |
| THE FOLLOWING ITEMS HAVE NOT BEEN |
| CORRECTED FROM THE FIRST REVIEW. |
| |
| 1. M-2.01 NO F/D AT 12X8 AND 10X10 DUCTS |
| INTO VEST SB-004 |
| 2. M-2.03 NO F/D AT 18X18 DUCT |
| PENETRATION ABOVE RATED DOORS SERVICE |
| CORRIDOR G-22 NEAR COLUMN LINES A AND |
| 2A. |
| 3. M-2.04 NO F/D (X2) AT 24X24 DUCT INTO |
| FEC SURFACE ROOM. |
| 4. M-2.04 NO F/D (X2) AT DUCTS LEAVING |
| SHAFT BY OFFICE M-18. |
| 5. M-2.04 NO F/D AT SHAFT BY ELEVATOR |
| NO. 3. |
| 6. M-2.04 NO F/D AT (DUCT SIZE COVERED |
| BY F/D SYMBOL) PENTRATION INTO STORAGE |
| ROOM M-02. |
| 7. M-2.04 NO F/D (X2) AT 36X20 AND 60X18 |
| DUCTS INTO STORAGE RM M-02. |
| 8. M-2.05 NO F/D AT 12X6 DUCT INTO |
| VISITORS OFFICE 2-46. |
| 9. M-2.06 NO F/D AT 12X10 DUCT BY ELEC |
| RM 3-017. |
| 10. M-2.06 NO F/D AT 70X24 DUCT INTO |
| MECH SPACE 3-016. |
| 11. M-2.06 NO F/D AT 30X20 DUCT |
| PENETRATION OF SHAFT WALL IN MECH SPACE |
| 3-020. |
| 12. M-2.06 NO F/D AT 12X6 DUCT INTO |
| RESTROOM 3-020 |
| 13. M-2.06 NO F/D AT 60X18 DUCT INTO |
| CONFERENCE ROOM 3 F05. |
| 14. M-2.06 NO F/D AT 50X20 DUCT INTO |
| FINANCE CUBICLES RM 3 F06. |
| 15. M-2.06 NO F/D AT 24X8 DUCT (X2 |
| PLACES) EAST SIDE OF CORRIDOR 3-010. |
| 16. M-2.06 NO F/D AT 20X14 DUCT INTO |
| WOMEN'S VESTIBULE 3-006. |
| 17. M-2.06 NO F/D AT 18X8 DUCT INTO |
| MEN'S VESTIBULE 3-005. |
| 18. M-3.01 SHOW LOCATIONS OF REQUIRED |
| HORN AND STROBE FOR REFRIGERANT LEAK |
| DETECTION INSIDE AND OUTSIDE OF |
| MACHINERY ROOM. |
| 19. M-3.01 WHAT AREA DOES EXISTING AHU |
| SERVICE? |
| 20. M-2.06 2 VCV MARKED #14 |
| 21. M-2.06 NO VCV MARKED #25. |
| 22. M-2.06 NO VCV MARKED #27M-2.06 VCV |
| #5 DISTRIBUTION EXCEEDS SCHEDULE. |
| 23. M-2.06 FCU#8 STIIL SHOWS TWO SUPPLY |
| DROPS AND NO RETURN. |
| 24. FLORIDA ENERGY CODE REQUIRES |
| CHILLERS TO COMPLY WITH TABLE 4-5 (IPLV |
| MIN. 5.3 DOES NOT SHOW NPLV) |
| 25. FLORIDA ENERGY CODE REQUIRES FCU TO |
| COMPLY WITH APPROPRIATE TABLE 4-3 OR |
| 4-4. |
| 26. FBC(M) 306.1 REQUIRES CLEARANCE |
| AROUND EQUIPMENT TO PERMENT |
| CONTRUCTION SHALL BE SUFFICIENT TO |
| ALLOW INSPECTION, SERVICE, REPAIR OR |
| REPLACEMENT WITHOUT REMOVING ELEMENTS |
| OF PERMANENT CONSTRUCTION. PROVIDE SUCH |
| CLEARANCES BY ALL EQUIPMENT. |
| 27. M-2.05 NO VCV#3 , NO VCV #1 TWO |
| VCV'S LABELED #14. |
| 28. PLAN SHOWS COIL PULL, NOT ELECTRICAL |
| SERVICE ACCESS OR ACCESS TO FAN |
| SECTION |
| 29. M-2.06 FCU-8 HAS NO |
| CLEARANCE SHOWN SHOW COMPLIANCE WITH |
| 306.1 |
| 30. LAYOUT AND COIL PULL FOR AHU 1 AND 2 |
| UNCLEAR, IT APPEARS COIL PULL FOR AHU 2 |
| IS ON TOP OF DUCT FOR AHU 1. PLEASE |
| CLARIFY SERVICE ACCESS AND COMPLIANCE |
| WITH 306.1 |
| 31. CHILLER RELIEF PIPING SHALL COMPLY |
| WITH FBC(M) 1105.9. |