Plan Review Notes
Plan Review Notes For Permit 02030743
Permit Number 02030743
Review Stop M
Sequence Number 2
Notes
Date Text
2002-05-16 00:00:00***********DENIED***********************
  
 THE FOLLOWING ITEMS HAVE NOT BEEN
 CORRECTED FROM THE FIRST REVIEW.
  
 1. M-2.01 NO F/D AT 12X8 AND 10X10 DUCTS
 INTO VEST SB-004
 2. M-2.03 NO F/D AT 18X18 DUCT
 PENETRATION ABOVE RATED DOORS SERVICE
 CORRIDOR G-22 NEAR COLUMN LINES A AND
 2A.
 3. M-2.04 NO F/D (X2) AT 24X24 DUCT INTO
 FEC SURFACE ROOM.
 4. M-2.04 NO F/D (X2) AT DUCTS LEAVING
 SHAFT BY OFFICE M-18.
 5. M-2.04 NO F/D AT SHAFT BY ELEVATOR
 NO. 3.
 6. M-2.04 NO F/D AT (DUCT SIZE COVERED
 BY F/D SYMBOL) PENTRATION INTO STORAGE
 ROOM M-02.
 7. M-2.04 NO F/D (X2) AT 36X20 AND 60X18
 DUCTS INTO STORAGE RM M-02.
 8. M-2.05 NO F/D AT 12X6 DUCT INTO
 VISITORS OFFICE 2-46.
 9. M-2.06 NO F/D AT 12X10 DUCT BY ELEC
 RM 3-017.
 10. M-2.06 NO F/D AT 70X24 DUCT INTO
 MECH SPACE 3-016.
 11. M-2.06 NO F/D AT 30X20 DUCT
 PENETRATION OF SHAFT WALL IN MECH SPACE
 3-020.
 12. M-2.06 NO F/D AT 12X6 DUCT INTO
 RESTROOM 3-020
 13. M-2.06 NO F/D AT 60X18 DUCT INTO
 CONFERENCE ROOM 3 F05.
 14. M-2.06 NO F/D AT 50X20 DUCT INTO
 FINANCE CUBICLES RM 3 F06.
 15. M-2.06 NO F/D AT 24X8 DUCT (X2
 PLACES) EAST SIDE OF CORRIDOR 3-010.
 16. M-2.06 NO F/D AT 20X14 DUCT INTO
 WOMEN'S VESTIBULE 3-006.
 17. M-2.06 NO F/D AT 18X8 DUCT INTO
 MEN'S VESTIBULE 3-005.
 18. M-3.01 SHOW LOCATIONS OF REQUIRED
 HORN AND STROBE FOR REFRIGERANT LEAK
 DETECTION INSIDE AND OUTSIDE OF
 MACHINERY ROOM.
 19. M-3.01 WHAT AREA DOES EXISTING AHU
 SERVICE?
 20. M-2.06 2 VCV MARKED #14
 21. M-2.06 NO VCV MARKED #25.
 22. M-2.06 NO VCV MARKED #27M-2.06 VCV
 #5 DISTRIBUTION EXCEEDS SCHEDULE.
 23. M-2.06 FCU#8 STIIL SHOWS TWO SUPPLY
 DROPS AND NO RETURN.
 24. FLORIDA ENERGY CODE REQUIRES
 CHILLERS TO COMPLY WITH TABLE 4-5 (IPLV
 MIN. 5.3 DOES NOT SHOW NPLV)
 25. FLORIDA ENERGY CODE REQUIRES FCU TO
 COMPLY WITH APPROPRIATE TABLE 4-3 OR
 4-4.
 26. FBC(M) 306.1 REQUIRES CLEARANCE
 AROUND EQUIPMENT TO PERMENT
 CONTRUCTION SHALL BE SUFFICIENT TO
 ALLOW INSPECTION, SERVICE, REPAIR OR
 REPLACEMENT WITHOUT REMOVING ELEMENTS
 OF PERMANENT CONSTRUCTION. PROVIDE SUCH
 CLEARANCES BY ALL EQUIPMENT.
 27. M-2.05 NO VCV#3 , NO VCV #1 TWO
 VCV'S LABELED #14.
 28. PLAN SHOWS COIL PULL, NOT ELECTRICAL
 SERVICE ACCESS OR ACCESS TO FAN
 SECTION
 29. M-2.06 FCU-8 HAS NO
 CLEARANCE SHOWN SHOW COMPLIANCE WITH
 306.1
 30. LAYOUT AND COIL PULL FOR AHU 1 AND 2
 UNCLEAR, IT APPEARS COIL PULL FOR AHU 2
 IS ON TOP OF DUCT FOR AHU 1. PLEASE
 CLARIFY SERVICE ACCESS AND COMPLIANCE
 WITH 306.1
 31. CHILLER RELIEF PIPING SHALL COMPLY
 WITH FBC(M) 1105.9.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved