Plan Review Notes
Plan Review Notes For Permit 01101510
Permit Number 01101510
Review Stop R
Sequence Number 2
Notes
Date Text
2002-02-11 00:00:00CHECKLIST:
 1-REAR ELEVATION EXCEEDS THE 40%
 PERCENTAGE OF EXTERIOR OPENINGS
 ALLOWED BY TABLE 600 SBC 1997. WALL
 AREA TO BE CONSIDERED IS MEASURED FROM
 FLOOR TO CEILING AREA PER FLOOR.
 2-PROVIDE NOTICE OF COMMENCEMENT WITH
 REVISED PARCEL AND PLAT #.
 3-ENGINEERED TRUSSES:
 A)ARE DESIGNED USING SFBC, NOT SBC AND
 SPECIFY 1997 EDITION.
 B)ENGINEERED TRUSSES ARE NOT LEGIBLE.
 C)MAKE SURE PROVISIONS FROM ASCE 7
 AND CHAPTER 16 OF SBC 1997 ARE NOT
 MIXED. NEED TO USE ONE OR THE OTHER.
 SEE SEC. 1606.1.2.1 SBC 1997.
 4-VERIFY THAT CONNECTORS SPECIFIED ON
 DWG 3B WILL RESIST LOADS CALCULATED ON
 ENGINEERED TRUSSES. EG: SEE TRUSS T11
 AND HORIZONTAL FORCES CALCULATED.
 5-SPECIFY CEILING INSTALLATION AT FRONT
 AND BACK PORCHES. SEE ASTM C-926 AND
 ASTM C-1063.
 SECTION 2504.2 SBC 1997.
 6-CLEARLY SPECIFY ANCHOR SIZE ON SHEET
 3B. EG: HETA 16, 20 OR 24 ETC.
 TO VERIFY UPLIFT AND HORIZONTAL LOADS
 ON RESPECTIVE CATALOGUES.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved