2002-03-07 00:00:00 | ****************** UNSAT ************* |
| |
| PLEASE NOTE THERE WERE ONLY TWO NOTES, |
| THAT STILL NEED TO BE ADDRESSED. |
| PLEASE SEE FIRE REVIEW COMMENTS, THERE |
| MAY BE SOME CHANGES THEY MAY AFFECT |
| ELECTRICAL DRAWINGS. |
| PLEASE NOTE THAT THE FIRE DEPT AND |
| ELECTRICAL NEED TO HAVE LAYOUT CHANGED |
| FOR "FIRE DEPT RM`S". PLEASE NOTE THAT |
| ROOMS SEEM TO BE TOO SMALL FOR OPERATION |
| OF EQUIPMENT/PANELS DURING A FIREOR |
| TESTING OF EQUIPMENT. PLEASE NOTE HOW |
| DOOR(S) OPEN DIRECTLY INFRONT OF ONE OF |
| THE PANELS. THIS WOULD MAKE IT DIFFICULT |
| FOR CLEARENCES. PLEASE NOTE CLEARENCES |
| PER 110-26. |
| |
| 1)NOTE: PLEASE NOTE FROM NOTE#16 FROM |
| FIRST REVIEW. PLEASE NOTE THAT THE |
| CONDUCTORS SIZES ARE NOW SHOWN FOR |
| PANEL "DH". IT IS NOTED THAT OCP AT |
| PANEL IS AT 500A`S. PLEASE CLARIFY LOAD |
| BEING SHOWN AT 514AMPS? PLEASE NOTE |
| 310-16 75 DEGREE COLUMN FOR SIZING. |
| LOAD EXCEEDS RATING FOR TWO SETS OF |
| 250MCM. (510A`S). |
| |
| 2)NOTE: PLEASE NOTE THAT LOAD SHOWN FOR |
| FIRE PUMP IS SHOWN AT 73.0 KVA.? THIS |
| PUTS LOAD AT 202A. 430-150 PUTS MOTOR |
| AT 211AMPS. |
| |
| PLEASE ALSO CLARIFY HOW LOAD SHOWN FOR |
| PANEL"DE" IS SHOWN AT 124.6 KVA AND THEN |
| ON LOAD STUDY FOR GEN., IT IS SHOWN AT |
| 106.2? IT IS NOTED THAT NOTE MENTIONS |
| ONLY "ONE ELEVATOR". PLEASE CLARIFY |
| HOW LOAD DECREASES WHEN "ATS" IS FEEDING |
| ENTIRE PANEL? |
| |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE CALL. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-659-8096 EXT 8372 |