2001-08-28 00:00:00 | *************** UNSAT ************** |
| |
| 1)NOTE: PLEASE NOTE THAT PANEL SCHEDULE |
| IS SHOWING ALL 2-POLE BRKRS ON LEFT AND |
| RIGHT OF PANEL ON THE SAME PHASE. PLEASE |
| CORRECT. ALL 2POLE BRKRS SHOULD LINE UP |
| ON SAME SIZE FOR 220V |
| |
| 2)NOTE: PLEASE NOTE LOAD FOR WATER HEAT- |
| -ER NEEDS TO CORRELATE W/ LOAD SHOWN ON |
| PANEL SCHEDULE. |
| |
| 3)NOTE: PLEASE NOTE THAT RISER DIAGRAM |
| IS MISSING RISER SIZE, WIRE SIZE FROM |
| RISER TO METER TO MAIN DISCONNECT. |
| |
| 4)NOTE: PLEASE ALSO NOTE THAT PLANS SHOW |
| MAIN DISCONNECT AND A MCB PANEL. PLEASE |
| NOTE PANEL MAY HAVE MAIN ALSO BUT IS NOT |
| REQUIRED W/ MAIN DISCONNECT OUTSIDE. |
| |
| 5)NOTE: PLEASE NOTE ALL CONTINOUS LOADS |
| TO BE SHOWN AT 125%. (LIGHTING) ETC. |
| PER 230-42/215-3 |
| |
| 6)NOTE: PLEASE NOTE LOAD SHOWN FOR WATER |
| HEATER AT 1500 WATTS AND 20KW ?? WHICH |
| ONE? PLEASE ALSO NOTE THAT IF 1500WATTS |
| THEM THE MAX OCP IS AT 150%. YOU SHOW |
| A 2-P-30. PLEASE CORRECT |
| |
| 7) NOTE: PLEASE SHOW GROUNDING ELECTRODE |
| GOING TO BUILDING STEEL AND COLD WATER |
| PER 250-50. SHOWS CWP, NOT BLDG STEEL. |
| |
| 8)NOTE: PLEASE NOTE THAT PLANS NEED TO |
| SHOW ALL BRANCH CIRCUIT #`S ON PLANS |
| AND CORRELATE WITH SUBMITTED PANEL |
| SCHEDULES.215-5 |
| |
| 9)NOTE: PLEASE SUBMIT AIC RATINGS FOR |
| ALL NEW EQUIPMENT BEING INSTALLED. |
| MAINS/PANELS/BREAKERS MUST BE RATED FOR |
| THE AVAILABLE FAULT CURRENT PER 110-9. |
| PLEASE NOTE THAT AIC RATING IS SHOWN FOR |
| PANEL, BUT NOT FOR MAIN. PLEASE SUBMIT |
| |
| |
| PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| REVIEW. IF THERE ARE ANY QUESTIONS, |
| PLEASE CALL. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-659-8096 EXT 8372 |