2001-09-29 00:00:00 | TRUSS DRAWINGS CHECKLIST: | | 1-PROVIDE UPDATED AND LEGIBLE GENERAL | | TRUSS DRAWINGS. | | 2-TRUSS ENGINEER IS SIGNING COPIES OF | | GENERAL TRUSS DRAWINGS THAT WERE | | SEALED BY ANOTHER ENGINEER. REVISE AS | | REQUIRED. | | 3-SOME TRUSSES ARE DESIGNED USING ASCE | | 7-93 RATHER THAN SBC 1997. REVISE ALL | | OF THEM AS REQUIRED. | | 4-TRUSSES S12 AND S14 CALCULATIONS WERE | | CHANGED BY HAND. CALCULATIONS SHALL BE | | DONE BY THE COMPUTER PROGRAM ONLY OR | | ENGINEER TO PROVIDE HIS COMPLETE CALCS | | 5-ARCHITECT TO SPECIFY CONNECTOR ATMID | | TRUSS BEARING POINT FOR TRUSS S15. |
|