Date |
Text |
2001-10-04 00:00:00 | PLEASE PROVIDE A RECENT PROPERTY SURVEY. |
| |
| THE CRAVEN THOMPSON CIVIL PLANS TITLE |
| SHEET CALLS OUT AN ADDRESS OF 915 S |
| DIXIE HWY.WHY? |
| |
| THE PLANS ARE MOSTLY INCOMPLETE AND A |
| CLOSE AND CRITICAL PLAN REVIEW FOR CODE |
| COMPLIANCE IS NOT POSSIBLE. IS THE |
| DESIGN OF THIS BUILDING COMPLETED YET? |
| |
| |
| PROVIDE ADDITIONAL INFORMATION ON THE |
| WATERPROOFING METHODS. SEE SBC 1814.2 |
| WHAT IS A "MUD BED" ? |
| |
| THE LOBBY LEVEL IS SHOWN AT 11.0' NGVD |
| AND THE 1ST PARKING LEVEL AT 13'-10". |
| PLEASE CLARIFY THE DESIGN INTENT. |
| ALSO REVIEW THE HC CODE FOR PARKING |
| GARAGE CLEAR HEIGHT. |
| |
| DIMENSIONS TO LOCATE THE COLUMNS ON |
| SHEET S-01, OR OTHERS, ARE NOT READILY |
| DISCERNIBLE. |
| |
| IS THERE MORE DESCRIPTIVE DETAIL |
| AVAILABLE FOR THE STRUCTURAL COMPONENTS |
| SHOWN ASW-1, W-1A AND W-2? |
| |
| SHEET S-01 GRID LINE 4 SHOWS THE 15 DEG |
| ANGLE COMMENCING AT AN INDETERMINATE |
| POINT. |
| |
| THE RWDI TEST REPORT REFERENCES ASCE |
| 7-93.SBC 97 INVOKES ASCE 7-95. |
| |
| WHAT RECOGNIZED ACCREDITATIONS DOES THE |
| WIND TUNNEL TESTING FACILITY HAVE? |
| |
| THE THRESHOLD INSPECTION PLAN REFERENCES |
| THE SOUTH FLORIDA BUILDING CODE ON PAGE |
| 3.PLEASE CHANGE OR REVISE TO INCLUDE |
| THE 1997 STANDARD BUILDING CODE, SBCCI. |
| |
| PLEASE DEMONSTRATE COMPLIANCE WITH SBC |
| 1803.2 FOR THE ADJOINING PROPERTY |
| |
| SKETCHES IN THE RWDI REPORT INDICATE |
| THERE MAY BE TABLE 600 CONFLICTS WITH |
| THE WALL OPENINGS, AND THE STAIR |
| LOCATIONS MAY NOT MEET THE 1/2 DIAGONAL |
| DISTANCE REQUIREMENT OF SBC 1004.1.4. |
| |
| ON THRESHOLD BUILDINGS, 3 SETS OF PLANS |
| AND INFORMATION ARE REQUIRED. |
| |
| GIVEN THE 100% LOT COVERAGE, HAS THE |
| MOBILIZATION AND LOCATION OF MATERIALS |
| AND EQUIPMENT BEEN ADDRESSED?CONTACT |
| THE CITY ENGINEER AT 659-8040 FOR USE |
| OF PUBLIC RIGHT OF WAY INCLUDING THE |
| PLACEMENT OF THE OIL INTERCEPTOR SHOWN |
| ON SHEET P-1. |
| |
| HOW WILL ELECTRICAL POWER BE DELIVERED |
| TO THE SUMP PUMPS SHOWN ON SHEET P-1 |
| |
| WHERE IS THE PERMIT APPLICATION, AND ITS |
| ATTENDANT PLANS, FOR THE BUILDING |
| PROPER?SEE SBC 104.4.3. |
| |
| BEFORE ANY PERMITS TO CONSTRUCT MAY BE |
| ISSUED IMPACT FEES MUST BE PAID TO PALM |
| BEACH COUNTY, THE PERMIT PLANS STAMPED |
| BYTHAT OFFICE AND A COPY OF THE PAID |
| RECEIPT ATTACHED TO THE PERMIT |
| APPLICTION. |