Plan Review Notes
Plan Review Notes For Permit 01070198
Permit Number 01070198
Review Stop B
Sequence Number 2
Notes
Date Text
2001-10-04 00:00:00PLEASE PROVIDE A RECENT PROPERTY SURVEY.
  
 THE CRAVEN THOMPSON CIVIL PLANS TITLE
 SHEET CALLS OUT AN ADDRESS OF 915 S
 DIXIE HWY.WHY?
  
 THE PLANS ARE MOSTLY INCOMPLETE AND A
 CLOSE AND CRITICAL PLAN REVIEW FOR CODE
 COMPLIANCE IS NOT POSSIBLE. IS THE
 DESIGN OF THIS BUILDING COMPLETED YET?
  
  
 PROVIDE ADDITIONAL INFORMATION ON THE
 WATERPROOFING METHODS. SEE SBC 1814.2
 WHAT IS A "MUD BED" ?
  
 THE LOBBY LEVEL IS SHOWN AT 11.0' NGVD
 AND THE 1ST PARKING LEVEL AT 13'-10".
 PLEASE CLARIFY THE DESIGN INTENT.
 ALSO REVIEW THE HC CODE FOR PARKING
 GARAGE CLEAR HEIGHT.
  
 DIMENSIONS TO LOCATE THE COLUMNS ON
 SHEET S-01, OR OTHERS, ARE NOT READILY
 DISCERNIBLE.
  
 IS THERE MORE DESCRIPTIVE DETAIL
 AVAILABLE FOR THE STRUCTURAL COMPONENTS
 SHOWN ASW-1, W-1A AND W-2?
  
 SHEET S-01 GRID LINE 4 SHOWS THE 15 DEG
 ANGLE COMMENCING AT AN INDETERMINATE
 POINT.
  
 THE RWDI TEST REPORT REFERENCES ASCE
 7-93.SBC 97 INVOKES ASCE 7-95.
  
 WHAT RECOGNIZED ACCREDITATIONS DOES THE
 WIND TUNNEL TESTING FACILITY HAVE?
  
 THE THRESHOLD INSPECTION PLAN REFERENCES
 THE SOUTH FLORIDA BUILDING CODE ON PAGE
 3.PLEASE CHANGE OR REVISE TO INCLUDE
 THE 1997 STANDARD BUILDING CODE, SBCCI.
  
 PLEASE DEMONSTRATE COMPLIANCE WITH SBC
 1803.2 FOR THE ADJOINING PROPERTY
  
 SKETCHES IN THE RWDI REPORT INDICATE
 THERE MAY BE TABLE 600 CONFLICTS WITH
 THE WALL OPENINGS, AND THE STAIR
 LOCATIONS MAY NOT MEET THE 1/2 DIAGONAL
 DISTANCE REQUIREMENT OF SBC 1004.1.4.
  
 ON THRESHOLD BUILDINGS, 3 SETS OF PLANS
 AND INFORMATION ARE REQUIRED.
  
 GIVEN THE 100% LOT COVERAGE, HAS THE
 MOBILIZATION AND LOCATION OF MATERIALS
 AND EQUIPMENT BEEN ADDRESSED?CONTACT
 THE CITY ENGINEER AT 659-8040 FOR USE
 OF PUBLIC RIGHT OF WAY INCLUDING THE
 PLACEMENT OF THE OIL INTERCEPTOR SHOWN
 ON SHEET P-1.
  
 HOW WILL ELECTRICAL POWER BE DELIVERED
 TO THE SUMP PUMPS SHOWN ON SHEET P-1
  
 WHERE IS THE PERMIT APPLICATION, AND ITS
 ATTENDANT PLANS, FOR THE BUILDING
 PROPER?SEE SBC 104.4.3.
  
 BEFORE ANY PERMITS TO CONSTRUCT MAY BE
 ISSUED IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, THE PERMIT PLANS STAMPED
 BYTHAT OFFICE AND A COPY OF THE PAID
 RECEIPT ATTACHED TO THE PERMIT
 APPLICTION.