2001-07-31 00:00:00 | A SITE PLAN IS NECESSARY TO LOCATE THE |
| BUILDING ON THE PROPERTY. |
| |
| THE 14" DIA. AUGERCAST PILE DEPTHS WILL |
| EXCEED 30 TIMES THEIR DIAMETER AND MUST |
| BE INSTALLED UNDER THE DIRECT |
| SUPERVISION OF AN ENGINEER.PLEASE |
| PROVIDE AFFIRMATION OF THIS.SEE SBC |
| 1809.2.2. |
| |
| SHEET S16 "SPECIALTY ENGINEERING NOTES" |
| CITES THE SFBC AS DOES S17 UNDER |
| STRUCTURAL LOADING.PROVIDE |
| AFFIRMATION THAT THE DESIGN WILL COMPLY |
| WITH SBCCI, 1997 AND ASCE 7-95.PLEASE |
| PROVIDE A COPY OF THE WIND TUNNEL |
| TESTING AND THE SOIL INVESTIGATION |
| RECOMMENDATIONS. |
| |
| PROVIDE A THRESHOLD INSPECTION PLAN AND |
| CONTACT DON NEELY ASSISTANT BUILDING |
| OFFICIAL TO COORDINATE THE THRESHOLD |
| INSPECTOR.561-659-8096 X 8333. |
| |
| PLEASE PROVIDE A DETAIL OR WRITTEN |
| NARRATIVE ON THE METHOD OF INSTALLING |
| THE AUGER CAST THROUGH THE 5' THICK |
| FOUNDATION MAT AS SHOWN IN SECTION 5/S2. |
| |
| SHEET S17 THE LIVE LOADS ARE NOT CLEAR, |
| (TYPO)THE PLYWOOD ROOF SHEATHING SHOWN |
| IS NOT ALLOWED IN TYPE I OR II |
| CONSTRUCTION.SEE SBC 603 & 604. |
| |
| SHOW THE DESIGN FOUNDATION CAPACITY AND |
| HOW IT WAS DETERMINED. |
| |
| BEFORE A PERMIT TO CONSTRUCT MAY BE |
| ISSUED IMPACT FEES MUST BE PAID TO PALM |
| BEACH COUNTY, THE PERMIT PLANS STAMPED |
| BY THEM AND A COPY OF THE RECEIPT |
| ATTACHED TO THE PERMIT APPLICATION. |
| CALL 561-233-5025 FOR MORE INFORMATION. |