Date |
Text |
2001-10-29 00:00:00 | THE LETTER DATED 8/20/01 FROM JUAN |
| FERNANDEZ-BARQUIN, P.E. CALLS OUT WIND |
| DESIGN TO ASCE 7-88/93.THE 1997 |
| STANDARD BUILDING CODE INVOKES ASCE |
| 7-95.PLEASE REVISE AS NECESSARY AND |
| DEMONSTRATE COMPLIANCE WITH SAME.WEST |
| PALM BEACH IS IN A 140 MPH ZONE FOR ASCE |
| AND 110 MPH IF SBC 1606.2 IS USED.SEE |
| SBC 1606.2.2 RE: MIXING OF WIND |
| PRESSURES FROM DIFFERENT SOURCES. SHEET |
| S11 WRONGLY CITES 100 MPH AND ASCE 7-93. |
| MARTINEZ TRUSSES USED ASCE 7-93 AS WELL. |
| |
| |
| THE NOA FOR THE METAL TECH SHUTTERS |
| EXPIRED 10/01/01.FURTHER, THE |
| COMPONENTS ARE NOT MARKED AS PROVIDED |
| FOR IN SECTION 6.1.2 OF THAT REPORT OR |
| AN INSTALLATION SCHEDULE INCLUDED. |
| |
| SEE THE BUILDING OFFICIAL'S |
| INTERPRETATION OF HURRICANE MISSILE |
| IMPACT REGARDING THE USE OF SHUTTERS ON |
| MULTI FAMILY BUILDINGS.A COPY IS |
| ATTACHED. |
| |
| THE ENTRANCE DOORS TO THE UNITS ARE |
| REQUIRED TO BE PROTECTED OPENINGS AS |
| PROVIDED FOR IN SBC 1006.2.4. THIS IS |
| NOT READILY DISCERNIBLE FROM THE DOOR |
| SCHEDULE ON SHEET A5.01.ALSO, THE |
| WINDOW TYPE [C] IS SHOWN AS AN OPERABLE |
| WINDOW.THIS MUST BE A TESTED FIRE |
| RATED ASSEMBLY.SEESBC 705.1.3.THE |
| WINDOWS SHOWN AS [H] AND THE GLASS BLOCK |
| IN THE END "C" UNITS ARE SUBJECT TO |
| SBC1006.2.4. |
| |
| SHOW THE FIRE DESIGN NUMBER FOR THE 1 HR |
| SHAFT IN SECTION 6/A7.03.SEE SBC |
| 701.2. |
| |
| PLEASE PROVIDE A DIMENSIONED SITE PLAN |
| AND A RECENT PROPERTY SURVEY. |
| |
| SHOW THE FINISH FLOOR ELEVATIONS |
| RELATIVE TO NGVD. |
| |
| SHOW THE HANDRAIL AND GUARDRAIL LOADS AS |
| REQUESTED ON THE PREVIOUS CHECKLIST, |
| SEE SBC 1608.2. |
| |
| EACH BUILDING REQUIRES A SEPARTE PERMIT, |
| ALSO SEE THE PREVIOUS LIST REGARDING IM |
| PACT FEES AND A RESIDENT INSPECTOR. |