2002-04-08 00:00:00CHECKLIST:
 1-SPECIFY SIZE AND TYPE OF WINDOW TYPE E
 TO VERIFY FOR EGRESS REQUIREMENTS OF
 SECTION 1005.4 SBC 1997.
 2-CLEARLY SPECIFY ON PLANS AREAS TO HAVE
 SAFETY GLASS AS REQUIRED BY SECTION
 2405.2 SBC 1997. SEE PLANS.
 3-PROVIDE ALL INFORMATION REQUIRED ON
 PROVISO DATED 9-10-01 TO AVOID DELAYS.
 4-NEED PANEL ENCLOSURE DETAILS AT LOGGIA
 NOTE: ABOVE ITEMS WHERE REQUESTED ON
 PREVIOUS REVISION CHECKLIST & WERE NOT
 ADDRESSED. MULTIPLE RE-SUBMITTAL FEES
 WILL BE CHARGED WHEN RE-SUBMITTING.
  
 5-TRUSS DRAWINGS CHECKLIST:
 A)FLOOR TRUSSES ARE DESIGNED USING THE
 WRONG LOADING. SEE STRUCTURAL DWGS.
 CLARIFY WHY ARE THERE UPLIFT LOADS ON
 FLOOR TRUSSES?
 ALSO, FLOOR TRUSSES ARE DESIGNED WITH
 ROOF TRUSSES DESIGN CRITERIA. REVISE.
 B)UPDATE/REVISE CODE USED. SPECIFY SBC
 1997 FOR 110MPH OR ASCE 7-95 FOR 140
 MPH (NOT ASCE 7-93 FOR 110MPH).
 C)TRUSS LAYOUT TO BE SIGNED, SEALED AND
 DATED BY TRUSS ENGINEER AND PROVIDE
 ALL ENGINEER'S INFORMATION AS REQUIRED
 BY CHAPTER 471 FLORIDA STATUTES WHEN
 SUBMITTING DRAWINGS FOR PUBLIC RECORDS
 D)ENGINEERED TRUSSES TO HAVE ORIGINAL
 SIGNATURE. CHAPTER 471 FLORIDA STATUTE
 E)THERE ARE SOME ENGINEERED TRUSSES THAT
 ARE MISSING ON THE TRUSS LAYOUT.
 CLEARLY IDENTIFY ALL TRUSSES ON LAYOUT
 F)ENGINEER OF RECORD TO SPECIFY ANCHOR
 THAT WILL RESIST THE UPLIFT LOADS
 CALCULATED ON THE ENGINEERED TRUSSES
 T11 AND T12. SEE ENGINEERED TRUSSES.
 G)TRUSS T6 IS DESIGNED TO BEAR AT THREE
 POINTS, WHILE STRUCTURAL DWGS SHOW
 BEARING AT BOTH ENDS OF TRUSS. REVISE
 EITHER THE ENGINEERED TRUSS OR THE
 STRUCTURAL DWGS TO MATCH.
  
 NOTE: SEE COPIES OF PREVIEWS COMMENTS