2001-08-29 00:00:00*************BUILDING UNSAT*************
  
 1) IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
  
 2)A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 3) THE ADDITION DOES NOT COMPLY WITH
 TABLE 600 OF THE 97 SBC. THE PERCENT OF
 WALL OPENINGS ALLOWED IS EXCEEDED ON THE
 WEST SIDE OF THE ADDITION. (33.2 SQFT OF
 OPENINGS IS ALLOWED.)
  
 4) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - STRUCTURAL WINDOW MULLIONS
  
 5) PROVIDE INSTALLATION SCHEDULE AND
 INDICATE THE SPECIFIC TYPE ANCHOR TO BE
 USED FOR STORM PANELS.
  
 TRUSSES
 UNSAT
  
 1) THE TRUSS LAYOUT MUST BE REVIEWED
 AND APPROVED BY THE DESIGNER OF RECORD.
 (CONSULTING ENGINEER)
  
 2) EACH OF THE TRUSS DRAWINGS MUST HAVE
 THE WET SIGNATURE OF THE TRUSS ENGINEER
 IN ADDITION TO HIS SEAL AND THE DATE
 THAT THE SIGNATURE AND SEAL IS AFFIXED
 IMMEDIATELY UNDER THE SIGNATURE PER FAC
 61G15-23.002.