Date |
Text |
2001-04-03 00:00:00 | BUILDING PLAN REVIEW |
| PERMMIT# 01030589 |
| 1041 OLD OKEECHOBEE ROAD |
| ROY D. DUNWORTH CONT |
| (561) 485-5210 |
| |
| 1)- PLOT PLAN DEPECTS THE PROPOSED BUILD |
| ING SITUATED ON THE NORTH & WEST PROPER- |
| TY LINES.THE FOOTING NOR THE DOOR SHOWN |
| ON THE WEST ELEVATION CAN ENCROACH OVER |
| THE PROPERTY LINE. |
| |
| 2)_ENERGY CALCULATIONS REQUIRED, FL. |
| ENERGY CODE 400.1. |
| |
| 3)- STRUCTURAL NOTES S-1 ASSUMED SOIL |
| BEARING VALUE OF 2000PSF SOILS REPORT |
| REQUIRES 2500 PSF. |
| |
| 4)- SHEET A-2 SEC. 4: |
| A)- SHUTTER DETAIL NOTE "SEE ROLL- |
| ADEN PRODUCT APPROVAL DWGS" FOR |
| DIMENSIONS & INSTALLATION DETAIL |
| THE UPPER BUCK ATTACHES TO WHAT? |
| WAS THE WINDOW AND SHUTTER TEST- |
| ED THIS WAY? |
| B)- STEEL STAIRS: RISE & RUN, SHOP |
| DRAWINGS REQUIRED, SHOW ATTACH- |
| MENT TO LANDING, COLUMNS AND |
| FLOOR. |
| C)- SBC 104.2.2: ADD INFO, SHOW DE- |
| TAIL FOR DROPPED BEAM UNDER |
| STAIR STRINGER? |
| D)- LINTEL SCHEDULE LIST OPENINGS |
| FOR THE FIRST FLOOR BUT NOT THE |
| WINDOWS OVER THE MEZANINE NOR |
| THE CIRCULAR WINDOW. |
| |
| 5)- SBC 1606.2.6.2 COMPONENTS & CLADDING |
| A)- SBC 1707.4 ALL GLAZED OPENINGS |
| REQUIRE TESTING FORWIND PRESSURE |
| A 10 SEC. LOAD EQUAL TO 1.5 |
| TIMES THE DESIGN LOADS. |
| B)- SBC GLAZED OPENINGS REQUIRE |
| LARGE MISSLE IMPACT TESTING OR |
| SHUTTERS THAT HAVE PRODUCT AP- |
| PROVAL, DADE COUNTY OR SBCCI RE- |
| PORTS ARE ACCEPTABLE.CITY POLICY |
| FOR STORM SHUTTERS REQUIRES A |
| INSTALLATION PLAN & SCHEDULE. |
| C)- ALL DOORS ALSO REQUIRE PRODUCT |
| TESTING SBC 1606.2.6.2 (SWING & |
| OVERHEAD DOORS). |
| D)- 1503.3.2/1503.4.1.2: ALL ROOF |
| ASSEMBLIES REQUIRE PRODUCT TEST- |
| ING FOR 110 MPH. |
| |
| 6)- A-2/ A-3 MEZANINE DECK NEEDS A |
| ATTACHMENT DETAIL FOR THE FLOOR TRUSSES |
| ON THE EXTERIOR WALL, TRUSS FLOOR LOAD- |
| ING AS PER TABLE 1604.1 LIVE LOADS FOR |
| STORAGE, LIGHT 125 PSF |
| HEAVY 150 PSF |
| SBC 413.4.5.2 POSTING STORAGE LOAD SIGNS |
| TRUSS PLAN LAYOUT FOR MEZANINE AND ROOF. |
| THE PLANS DON'T INDICATE IF THERE IS TO |
| BE FLOOR TRUSSES OVER THE KITCHEN AREA, |
| IF THERE IS , ISTHE NORTH KITCHEN WALL |
| BEARING? IS A GIRDER REQUIREDALSO? |
| |
| 7)- THE METAL FRAME CANOPY WILL REQUIRE |
| A SEPERATE PERMIT. |
| |
| 8)- ROOF TRUSSES: THE GABLE END MISSING |
| DETAILS, DROPPED GABLE, RAKED BEAM, DE- |
| TAILS ON THE ATTACHMENT OF THE GABLE |
| TRUSS TO THE BEAM. |
| |
| 9)_ MISSING ACCESS PANEL FOR THE FIRST |
| FLOOR A/C UNIT. |
| |
| 10)- MEZANINE USAGE REQUIRED, IF NOT |
| USED FOR STORAGE FL. VERTICAL ACCESSI- |
| BILITY BECOMES A ISSUE. |
| |
| 11)- PLANS ARE REQUIRED TO RECEIVE |
| COUNTY IMPACT FEE STAMPS BEFORE ISSUANCE |
| |
| BUILDING PLAN REVIEW |
| JIM WITMER |
| (561) 659-8096 EX 8412 |