2001-04-10 00:00:00 | FAILED: |
| 1. PLEASE CHANGE, THE CITY OF SUNRISE TO |
| THE CITY OF WEST PALM BEACH IN GENERAL |
| NOTES. SEE SHEET GN1 OF 1 |
| 2. PLEASE PROVIDE POLLUTION PREVENTION |
| PLAN.THE POLLUTION PREVENTION PLAN |
| SHALL BE INSTALLED IN THE FILED PRIOR |
| TO ANY EARTHWORK.THE POLLUTION |
| PREVENTION PLAN SHALL BE KEPT ON SITE AT |
| ALL TIME DURING CONSTRUCTIONS. |
| 3. PLEASE PROVIDE DRAINAGE CALCULATIONS |
| TO JOSE DEL RIO, STORM WATER ENGINEER |
| 100045TH STREET WEST PALM BEACH, FL |
| 33415(561) 659- 8040 FOR APPROVAL. |
| 4. PLEASE PROVIDE PERVIOUS AND |
| IMPERVIOUS CALCULATIONS FOR ENTIRE SITE |
| SIGNED AND SEALED BY DESIGN ENGINEER. |
| THIS INFORMATION SHOULD SUBMITTED ON A |
| 8 1/2 X 11 SHEET WITH PROPERTY CONTROL |
| NUMBER, NAME AND ADDRESS.SUBMITT TO |
| MANNY GONZALEZ , 100045TH STREET WEST |
| PALM BEACH, FL 33415(561) 659- 8040. |
| 5. ALL DRIVEWAY APPROACHES MUST BE AT |
| MINIMUM PER THE CITY OF WEST PALM BAECH |
| STANDARD. |
| 6. THE "APPLICATION FOR CONSTRUCTION |
| WITHIN PUBLIC R.O.W" MUST BE SUBMITTED |
| TO CITY ENGINEER, RICHARD PITTMAN,AT |
| 100045TH STREET WEST PALM BEACH, FL |
| 33415(651) 659- 8040. |
| 7. PERIMETER BERM SHOULD BE CONSTRUCTED |
| AT 18.27 AS SHOWN IN DETAILS A-A & B-B |
| ON SHEET PD2 OF 2. SHEET PD1 OF 2 SHOWS |
| 8.27. |
| 8. PLEASE SHOW INVERT ELEVATION FOR |
| WATER MAIN AND CROWN ELEVATION FOR SEWER |
| LINE AS MARKED ON SHEET WS1 OF 8. |
| 9. A CLEAN-OUT WILL NEED TO BE INSTALLED |
| IN SANITARY SEWER LATERAL, ON THE |
| PROPERTY, AT THE BACK OF SIDEWALK. |
| 10. A SEPARATE IRRIGATION METER IS |
| SUGGESTED, AN APPROVED BACKFLOW |
| PREVENTER WILL NEED TO BE INSTALLED ON |
| THIS LINE. |
| IF ANY QUESTION PLEASE CONTACT (561)- |
| 659-8096 EXT. 8492 |