Date |
Text |
2001-03-21 00:00:00 | ************DENIED********************** |
| 1. ALL MED GASSHALL COMPLY WITH 1999 |
| NFPA 99C |
| 2. SPECIFY PIPE MATERIALS ON PLAN. |
| VACUUM PIPING TO COMPLY WITH 4-3.2.2.2 |
| OXYGEN PIPING BE PER 4-3.1.2.7 |
| 3. SPECIFY PIPE SIZES ON PLAN FOR O2 AND |
| VACUUM SYSTEMS FOR REVIEW. |
| 4. NOTE ON P-4 REFERS TO P-1 FOR VACUUM |
| PUMP PIPING AND VALVE CONFIGURATION. |
| P-1IS NOT INCLUDED FOR REVIEW. |
| 5. THE MAIN VALVE (O2) IS SHOWN LOCATED |
| AFTER THE FIRST BRANCH WHICH IS SHOWN |
| CONNECTED BACK TO THE REST OF THE |
| SYSTEM IN THE CORRIDOR. MAIN VALVE |
| NEEDS TO BE PRIOR TO ANY BRANCH. |
| 6. PIPING IS TO BE PROMINENTLY LABELED |
| AS TO USE PRIOR TO INSTALLATION PER |
| 4-3.2.2.2 |
| 7. PRESSURE TEST PER 4-3.4.1.1 SHALL BE |
| BEFORE WALLS ARE CLOSED. |
| 8. THE EMERGENCY OXYGEN SUPPLY |
| CONNECTION SHALL BE LOCATED ON THE |
| EXTERIOR OF THE BUILDING WHERE IT IS |
| ACCESSIBLE BY EMERGENCY SUPPLY VEHICHLE |
| AT ALL TIMES. |
| 9. NO AREA ALARMS ARE SHOWN FOR THE |
| PROCEDURE ROOMS. PROVIDE INFORMATION ON |
| AREA ALARMS PER 4-3.1.2.2 (C) |
| 10. ALARM PANELS SHALL BE POWERED BY THE |
| LIFE SAFETY BRANCH OF THE EMERGENCY |
| SYSTEM PER 4-3.1.2.2 |
| |
| PROVIDE PLANS INCLUDING INFORMATION |
| ABOVE FOR REVIEW. |
| CONTACT PAUL SCHMITZ CHIEF PLUMBING |
| INSPECTOR @ (561) 659-8096 EXT. 8233 |
| FOR REQUIRED INSPECTIONS AND TESTS |
| REQUIRED BY |
| THIS OFFICE FOR THIS PERMIT TYPE. |