Date |
Text |
2001-03-22 00:00:00 | ******************DENIED**************** |
| |
| 1.PROVIDE OUTSIDE AIR SCHEDULE PER |
| ASHRAE 62-89. |
| 2.PROVIDE AIR BALANCE SHOWING COMPLIANCE |
| WITH 1997 SMC 501.2. |
| |
| 3.SPECIFIC LOCATION AND INSTALLATION |
| DETAILS ARE REQUIRED FOR FIRE AND OR |
| SMOKE DAMPERS AS PER 1997 SMC 610.6. |
| ALSO ACCESS TO MAINTAIN AND RESETTING |
| OF FIRE DAMPER,1997 SMC 610.5. |
| |
| 4.PROVIDE ELEVATION AND SHAFT DETAIL FOR |
| DUCTS PENETRATING FLOORS, 1997 SMC |
| 610.4. |
| |
| 5.CLARIFY THE FOLLOWING EXHAUST FANS & |
| DUCTWORK FOR: |
| |
| ROOM 304 - 3RD FLOOR MENS RESTROOM |
| ROOM 205 - 2ND FLOOR CUST. |
| ROOM 204 - 2ND FLOOR MENS RESTROOM |
| ROOM 208 - 2ND FLOOR WOMENS RESTROOM |
| |
| 6.CLARIFY FUNCTION OF AHU 5, PLANS |
| INDICATE SERVICING KITCHEN AND WOMENS |
| RESTROOM (RM. 119), WHEREAS THE AHU |
| SCHEDULE INDICATES AHU 5 SERVES |
| CLASSROOMS. |
| |
| 7.PROVIDE CFM INFORMATION FOR 3RD FLOOR. |
| |
| 8.PROVIDE DETAIL OF 2ND FLOOR MECHANICAL |
| ROOM - PLAN ELEVATION, CLEARANCE FOR |
| SERVICEABILITY AS PER 1997 SMC 304.2.3 |
| ALSO, PROVIDE LOCATION OF AHU 7. |
| SCHEDULE INDICATES IT IS LOCATED IN |
| MECHANICAL ROOM, 2ND FLOOR. |
| |
| 9.AHU 6 SERVES CAFE, IS THIS AN EXISTING |
| SPACE? PLEASE PROVIDE MORE INFORMATION |
| |
| 10.PROVIDE MORE INFORMATION OF KITCHEN |
| HOOD - MAKE UP AIR AND EXHAUST TO |
| SHOW COMPLIANCE WITH 1997 SMC 504. |
| |
| |
| |
| |
| 11.DRAWING H-7 SHOWS GREASE DUCT |
| PENETRATING THE WALL BETWEEN THE |
| KITCHEN TO THE BOILER ROOM, IS THIS |
| WALL RATED? |
| |
| 12.PLEASE PROVIDE A CLEAR DETAIL OF ROOF |
| TERMINATION OF BOTH FLUE AND EXHAUST |
| OUTLET. |
| |
| 13.PROVIDE INFORMATION SHOWING C |
| COMPLIANCE WITH SMC CHAPTER 11, |
| LEVEL 1 MACHINE ROOM, I.E. SIGNAGE, |
| VENTILATION CALCULATIONS (EMERGENCY |
| & NORMAL), LOCATION OF HORN & STROBES |
| (OUTSIDE & INSIDE ROOM), LOCATION OF |
| REFRIGERANT SENSORS AND BREATHING |
| APPARATUS. |