2001-03-19 00:00:00 | A COMPLETE PLAN PREVIEW FOR CODE |
| COMPLIANCE WAS NOT POSSIBLE SINCE THE |
| PLANS AND SPECIFICATIONS AND PROVIDED |
| ARE INCOMPLETE. |
| |
| THE CODE PLAN SHEET CD1.1 APPEARS TO USE |
| THE NOMINAL WIDTHS OF THE EGRESS DOORS |
| AND OPENINGS.SBC 1003.2 REQUIRES THE |
| CLEAR WIDTH TO BE USED. |
| |
| SHEET A1.2.WHERE WILL THE NEW STAIR # |
| 4 DISCHARGE? |
| |
| THE OVAL STAIR REQUIRES AN ENCLOSURE |
| SINCE IT PENETRATES MORE THAN 2 |
| STORIES.SEE SBC 705.2.2.H3 IMPLIES |
| AN ATRIUM.IF SO PROVIDE ALL |
| INFORMATION AND CALCULATIONS AT TIME OF |
| PERMIT.SEE SBC 414.1. |
| |
| SHEET A1.4.THE ROOF AND OVERFLOW |
| DRAINS MUSTBE SIZED TO THE 1994 |
| STANDARD PLUMBING CODE. |
| |
| SHEET A2.1A.DETAILS FOR THE ATTACHMENT |
| OF THE WOOD CEILING WILL BE NECESSARY. |
| |
| A3.1.SPECIFIC CONNECTION DETAILS WILL |
| BE REQUIRED FOR THE CAST STONE AND THE |
| "COMPONENT" PANELS. |
| |
| THIS IS A THRESHOLD BUILDING AND WILL |
| REQUIRE A THRESHOLD INSPECTOR AND |
| INSPECTION PLAN.SEE FS 553.71. |
| |
| IMPACT FEES MUST BE PAID TO PALM BEACH |
| COUNTY.CALL 561-233-5025 FOR MORE |
| INFORMATION. |
| |
| PRODUCT APPROVALS AND TEST REPORTS ARE |
| REQUIRED FOR THE WINDOWS, ROOF |
| COVERINGS AND THE HURRICANE MISSILE |
| IMPACT PROTECTION SYSTEM. |