2001-08-30 00:00:00BUILDING PLAN REVIEW
 PERMIT # 01020102
 1801 OKEECHOBEE ROAD / 1701 BLDG# 1
 TYPE IV / PROTECTED
 FULLY SPRINKLERED
 OCCUPANCY: STORAGE
 OWNER: PREMIER AIRPORT CENTER, LLP
  
 1)- FL. STATE STATUTE 553 / CHAPTER 468
 PART XII CHAPTER 7 OF THE CITY CODE &
 THE SBC REQUIRE A RESIDENT INSPECTOR ON
 THE SITE. TO DATE NO COMPANY AND INDIVID
 UAL HAS MET WITH THE ASSISTANT BUILDING
 OFFICIAL DON NEELY TO REGISTER IN THE
 PROGRAM. THE INSPECTOR IS REQUIRED TO
 SHOW STATE LICENSURE.
  
 2)_ ROOF DECK : THE JOB SITE IS LOCATED
 IN A FIRE DISTRICT, SHOW MANUFACTURES
 SPECIFICATION FOR A CLASS A OR B ROOFING
 SYSTEM.
  
 3)- ROOF DECK (SYSTEM) SBC 1503.3.2 ROOF
 ING SYSTEMS ARE TO BE TESTED FOR THE WIN
 D ZONE THAT THE BUILDING IS LOCATED IN.
 110MPH WIND ZONE, SHOW COMPLIANCE EITHER
 SBCCI REPORT OR DADE COUNTY, IF NOT
 PROVIDED AT TIME OF PERMIT THE ROOFING
 PERMIT WILL BE STRUCK & THE CONTRACTOR
 WILL HAVE TO COME IN UNDER SEPERATE PER-
 MIT WITH REPORT & PAY ADDITIONAL PERMIT
 FEES.
  
 4)- SBC 104.2.2 ADDITIONAL INFORMATION
 REQUIRED. A CURRENT SURVEY WILL BE RE-
 QUIRED.
 THE SITE IS LOCATED IN A (A-9)
 FLOOD ZONE. THE MINIMUM ELEVATION HEIGTH
 IS 13'-6" FOR THE FINISH SLAB. A ELEVATI
 ON CERTIFICATE WILL BE REQUIRED BEFORE
 THE C. O. WILL BE ISSUED.
  
 5)- SBC COMPONENTS & CLADDING THE PLANS
 DEPICT THAT THERE WILL BE NO SUB-BUCK
 FOR WINDOWS & DOORS. THERE SEEMS TO BE
 NO DETAIL FOR THE OVERHEAD DOOR.
  
 6)- SBC 1606.4.1/ 1707.4.1 AMENDMENTS
 ALL GLAZED OPENINGS REQUIRE PRODUCT TEST
 ING REPORTS!!!!!!!!!!! TESTING REPORTS
 REGAURDLESS OF SHUTTERS IS REQUIRED FOR
 WIND SBC 1707.4.1 10 SECOND TEST EQUAL
 TO 1.5 TIMES THE DESIGN LOAD. THIS IS
 FOR GLASS DOORS, WINDOWS & SKYLIGHTS!!!!
  
 7)- SBC 1606.4.1 /1707.4.1 ALL GLAZED OP
 ENINGS WILL REQUIRE PRODUCT TESTING FOR
 LARGE MISSLE IMPACT TESTING. GLAZED OPEN
 INGS THAT HAVEN'T BEEN TESTE FOR THIS
 WILL REQUIRE STORM SHUTTER PROTECTION.
 THE CITYS' OFFICIAL INTERPRETATION
 FOR MISSLE IMPACT PROTECTION HAS A SEC-
 TION (#14) REGAURDING STORM SHUTTERS FOR
 LARGE PROJECTS. THE BUILDING OFFICIAL
 HAS REVIEWED YOUR PROPOSAL & FOUND THAT
 IT DOES NOT MEET THE CRITERIA OUTLINED I
 N SECTION #14 FOR LARGE PROJECTS.
 THERE ARE MULTIPLE SKYLIGHTS THAT
 WILL ALSO REQUIRE PRODUCT TESTINGREPORTS
 FOR LARGE MISSLE RESISTANCE.
  
 8)- THE REFRENCE TO TYPE 1 PLYWOOD USED
 FOR THE EXTERIOR CEILING ASSEMBLY WAS CO
 RRECTED ON PAGE A-12, THE SAME ASSEMBLY
 SHOWS UP ON A-14 DETAILS 12 & 13.
  
 9)- THE PAGES THAT ARE VOID NEED TO BE D
 ELETED FROM THE PLANS AND THE NEW PAGES
 INSERTED BACK INTO THE DOCUMENT. THE
 VOIDED PAGES ARE TO BE FOLDED PLACED ON
 TOP OF THE PLANS (1 COPY).
  
 10)-COUNTY IMPACT FEES ARE TO BE PAID BE
 FORE THE ISSUANCE OF THE PERMIT.
  
 11)_ ONE OF THE THREE SETS OF PLANS IS
 MISSING THE STRUCTURAL DRAWINGS. THIS
 SET OF PLANS IS WRAPPED AND NOTED.
  
 BUILDING PLAN REVIEW
 JIM WITMER
 (561) 659-8096 X 8412