2001-01-08 00:00:00 | CHECKLIST: |
| 1-PAY IMPACT FEES. BRING DRAWINGS TO THE |
| PALM BEACH COUNTY. GET DRAWINGS |
| STAMPED AND BRING RECEIPT. |
| 2-SPECIFY SAFETY GLASS AT BEDRM #4 BATH |
| AND NEW MASTER BATH HALLWAY. SEE |
| DRAWINGS AND SECTION 2405.2 SBC 1997. |
| 3-SPECIFY VENTILATION FOR MASTER BATH. |
| SECTION 1203.4.2 SBC 1997. |
| 4-PROVIDE ATTIC ACCESS AT NEW ADDITION. |
| SECTION 2309.6 SBC 1997. |
| 5-PROVIDE PRODUCT APPROVAL FOR: |
| -NEW WINDOWS. |
| -FINISH ROOFING MATERIAL. |
| 6-CLARIFY IF THE BAHAMA SHUTTERS ARE TO |
| BE USED FOR HURRICANE MISSILE IMPACT |
| PROTECTION. |
| -PROVIDE PRODUCT APPROVAL AND COMPLETE |
| SPECIFICATIONS. |
| 7-ENERGY CALCULATIONS: |
| -COMPLETELY FILL THE SECOND PAGE. |
| -OWNER/AGENT TO SIGN AND FRONT OF FORM. |
| 8-SEE COMMENTS ON PLANS AND REVISE THE |
| DRAWINGS AS REQUIRED. |
| 9-ARCHITECT'S PLANS DON'T SHOW ANY INFO. |
| CONCERNING THE EXISTING FOOTINGS. NEED |
| INFORMATION TO VERIFY THAT EXISTING |
| STRUCTURE WAS CONSIDERED AND IS ABLE |
| TO SUPPORT THE ADDITIONAL LOAD. |
| PROVIDE CALCULATIONS. |
| |
| NOTES: |
| A-NEED RECORDED NOTICE OF COMMENCEMENT. |
| B-PLEASE RETURN REVIEWED SET OF DRAWINGS |
| AFTER CORRECTIONS ARE DONE TO ORIGINAL |
| DRAWINGS, IN ORDER TO EXPEDITE THE |
| REVIEW PROCESS. |
| C-SEPARATE PERMITS WILL BE REQUIRED FOR |
| ELECTRICAL, MECHANICAL, PLUMBING AND |
| ROOFING WORK BECAUSE ORIGINAL PERMIT |
| APPLICATION WAS ONLY SIGNED BY THE G.C |
| D-IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| JULIO GOMEZ AT 659-8096 EXT. 8232. |