2001-01-22 00:00:00 | BUILDING PLAN REVIEW: |
| 1)-FL. S.S. 481 TO HAVE ARCHITEECT TO |
| SIGN/ SEAL & DATE DRAWINGS. |
| 2)- 1997 FL ENERGY EFFICIENCY CODE 400.0 |
| REQUIRES ENERGY CODE COMPLIANCE DOCUMENT |
| 3)- SBC 1804.2 SOILS REPORT MINIMUM |
| SOIL BEARING. |
| 4)- SHEET A-3 DETAIL A REQUIRES A VAPOR |
| BARRIER AT SLAB.SBC 103.7..3.7 TREATED |
| SOIL SHALL BE COMPLETELY COVERED WITH A |
| VAPOR BARRIER FROM THE SUN & RAIN WITHIN |
| 2 HRS. OF CHEMICAL APPLICATION. |
| 5)- SHEET A-3 DETAIL B WILL ALSO REQUIRE |
| ADDITIONAL TERMITE CHEMICAL SOIL TREAT- |
| MENTS SHALL BE APPLIED UNDER ALL EXTER- |
| IOR CONCRETE ON GRADE THAT ARE WITHIN ON |
| ONE FOOT OF THE PRIMARY STRUCTURE SIDE- |
| WALLS.SBC 103.7.3.5 |
| 6)- SBC 1606.2.6.2- COMPONENTS & CLAD- |
| DING, ALL GLAZED OPENINGS WILL REQUIRE |
| TESTING 16606.4.1/1707.4.1 FOR LARGE |
| MISSLE RESISTANCE, IF THE PRODUCT WASN'T |
| TESTED STORM SHUTTERS WILL BE REQUIRED |
| MEETING THIS REQUIREMENT. A SHUTTER |
| SCHEDULE FOR ATTACHMENT AND A DIAGRAM OF |
| OPENINGS TYING THE 2 TOGETHER.ALL EXTER- |
| IOR DOOR OPENINGS WUOLD ALSO HAVE TO |
| HAVE PROOF OF TESTING. |
| 7)- ROOFING SBC 1606.2.6.2- WILL ALSO |
| REQUIRE TESTING REPORTS, DADE COUNTY OR |
| SBCCI REPORT WILL BE REQUIRED,2 COPIES. |
| 8)- SBC 104.2.2- ADDITIONAL INFORMATION |
| WILL BE REQUIRED FOR THE CUPOLA, IS THIS |
| MEETING THE REQUIREMENTS OF 1606.2D FOR |
| WIND? TEST RESULTS SHOWING POSITIVE & |
| NEGATIVE PRESSURES TESTED FOR? |
| 9)- AWNINGS REQUIRE A SEPERATE PERMIT, |
| THEY WILL HAVE TO HAVE PROOF OF FIRE |
| RETARDANT FABRIC, FRAMES TO HAVE ENGIN- |
| EERING. |
| 10)- FIRESTOPPING- SBC 2305.1.4.1- |
| FIRE STOPPING WILL BE REQUIRED AT FLOOR |
| AND CEILING LINE. |
| 11)-SBC 2309.6 ATTIC ACCESS REQUIRED. |
| 12)- SBC 803.3 REQUIRES A MINIMUM FINISH |
| ROOM SCHEDULE IN ACCORDANCE WITH ASTM - |
| E-84, WITH FLAMESPREAD & SMOKE DEVELOP- |
| MENT. |
| 13)- SBC 104.2.2- ADD. INFORMATION RE- |
| QUIRED, DROPPED CEILING, WHAT MATERIAL |
| IS THE DROPPED CEILING MADE OF? HOW |
| OFTEN IS THE CEILING SUPPORTED AND BY |
| WHAT MEANS IS THE CEILING SUPPORTED? |
| |
| BUILDING PLAN REVIEW |
| JIM WITMER |
| (561) 659- 8096 EX 8412 |