2001-01-08 00:00:00 | TRUSS DRAWINGS CHECKLIST: |
| 1-ENGINEER NEEDS TO PROVIDE ORIGINAL |
| SIGNATURE ON ALL DOCUMENTS SUBMITTED |
| FOR PUBLIC RECORDS. SEE ATTACHED COPY |
| OF FLORIDA STATUTES. |
| 2-UPDATE ENGINEERED TRUSS DRAWINGS. |
| THERE ARE SEVERAL WIND LOAD ANALYSIS. |
| SOME TRUSSES ARE DESIGNED USING SBC |
| 1997, OTHERS ARE DESIGNED USING ASCE |
| 7-93 AND OTHERS USING ASCE 7-95. |
| THE CORRECT DESIGN CRITERIA SHOULD BE |
| ASCE 7-95 FOR A WIND LOAD OF 145MPH |
| AND A MEAN ROOF HEIGHT OF 17'-0". |
| OR, SBC 1997 WITH 110 MPH WIND LOAD |
| AND 17'-0" MEAN ROOF HEIGHT. |
| 3-UPDATE ALL GENERAL DETAILS AND SIGN, |
| SEAL AND DATE THEM. NOTE: THERE SHOULD |
| BE ONLY ONE ENGINEER RESPONSIBLE FOR |
| SUCH DETAILS. CHAPTER 471 FL. STATUTES |
| 4-ARCHITECT TO REVISE ANCHOR SCHEDULE. |
| -CONNECTORSSPECIFIED AT COVERED |
| PORCHES ARE CONCRETE TO WD CONNECTORS. |
| NEED A WOOD TO WOOD CONNECTOR AS |
| REQUIRED. |
| -CLEARLY SPECIFY CONNECTORS FOR ALL |
| BEARING POINTS OF ENGINEERED TRUSSES. |
| EG: SEE TRUSSES S1N, T22, S13, HH1. |
| SEE ENGINEERED TRUSSES TO PROPERLY |
| SPECIFY CONNECTOR THAT WILL RESIST THE |
| CALCULATED LOADS. |
| -ROOF FRAMING PLAN BY ARCHITECT NEEDS |
| TO SPECIFY CONNECTORS AT ALL BEARING |
| POINTS. SEE ROOF FRAMING PLAN AND |
| CLEARLY SPECIFY MISSING CONNECTORS. |