Date |
Text |
2001-01-08 00:00:00 | PASSED WITH PROVISOS: |
| THIS REVIEW ONLY COVERS THE DRIVEWAY |
| APPROACH AND NORTH/SOUTH SIDEWALK FROM |
| THE STREET TO THE EXISTING EAST/WEST |
| SIDEWALK. |
| A SEPARATE RIGHT OF WAY PERMIT IS |
| REQUIRED.FILL OUT THE ATTACHED FORM |
| AND SUBMIT IT TO THE ENGINEERING |
| DEPARTMENT AT 1000- 45TH STREET, |
| ATTENTION DAN YEAKEL.THIS PERMIT MUST |
| BE ISSUED PRIOR TO STARTING WORK. |
| NORTH/SOUTH SIDEWALK SECTION MUST BE A |
| MINIMUM OF 4" THICK, NEW CONCRETE. |
| NEW DRIVEWAY MUST BE MOVED A MINIMUM OF |
| THREE FEET TO THE WEST TO KEEP THE |
| APPROACH FROM BEING IN FRONT OF THE |
| PROPERTY TO THE EAST. |
| USE THE ATTACHED DETAIL SHEET FOR THE |
| LAY-OUT OF THE APPROACH. PRIOR TO |
| POURING THE APPROACH CALL ED RYAN AT |
| 659-8040 TO COME OUT AND CHECK TO BE |
| SURE THAT THE DRIVEWAY IS SET AT THE |
| RIGHT ELEVATION.FAILURE TO DO SO WILL |
| CAUSE THE DRIVEWAY TO BE REMOVED AND |
| REPOURED. |
| TIE THE NEW APPROACH IN WITH THE |
| EXISTING CURBS ON EITHER SIDE. |
| REMOVE THE SIDEWALK IN THE AREA OF THE |
| DRIVEWAY APPROACH AND REPLACE IT WITH |
| 6" CONCRETE. |