Plan Review Details - Permit 99121599
Plan Review Stops For Permit 99121599
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2000-05-30 Cont ID  
Sent By hpiskura Date 2000-03-09 Time 09:59 Rev Time 99.00
Received By sgraham Date   Time   Sent To ENG
Notes
2001-01-08 00:00:00LETTER ATTACHED TO PLAN

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-01-15 Cont ID  
Sent By dpalmer Date 2000-01-15 Time 11:32 Rev Time 0.00
Received By dpalmer Date 2000-01-15 Time 11:32 Sent To  
Notes
2001-01-08 00:00:00************** PROVISO *****************
  
 1)NOTE:PLEASE REVISE SHEET E1.1 TO
 REFLECT WIRE SIZE FOR SITE LIGHTING AS
 REQ`D ON SHEET E5.1.
  
 2)NOTE:AS REQ`D BY ARTS;250-81/250-94
 OF THE NEC. THE BONDING JUMPER/GROUNDING
 ELECTRODE CONDUCTOR GOING TO COLD WATER
 PIPEIS REQ`D BY 250-81 TO BE SIZED
 FROM 250-94. PLEASE CORRECT.
  
 3)NOTE: THERE IS TO BE NO EQUIUPMENT
 GROUNDING CONDUCTOR INSTALLLED UNTIL
 AFTER FIRST MEANS OF DISCONNECT.
  
  
 PLEASE HAVE THE ABOVE SUBMITTED FOR RE-
 -VIEW AND APPROVAL BEFORE FIRST ROUGH
 ELECTRICAL INSPECTION IS CALLED IN.
 IF THERE ARE ANY QUESTIONS PLEASE CALL
 659-8096 EXT 8372

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2000-05-05 Cont ID  
Sent By mgonzale Date 2000-05-05 Time 11:11 Rev Time 1.00
Received By mgonzale Date   Time   Sent To  
Notes
2001-01-08 00:00:00PASSED - 5-5-2000
 MINOR UTILITY COMMENTS BEING HANDLED
 THROUGH MANNY GONZALEZ AT PUBLIC UTILITY
 THE SANITARY SEWER ALONG ALLEY ROAD
 EAST AND RUNNING PARALLEL OF BRISTOL MAY
 REPLACED- ENGINEER AND CUSTOMER ARE IN
 NEGOTIATIONS.IF REPLACEMENT TO SEWER
 TAKES PLACE THE ENGINEER WOULD HAVE TO
 SUBMIT REVISED PLANS.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2000-03-29 Cont ID  
Sent By hpiskura Date 2000-03-09 Time 10:00 Rev Time 2.00
Received By dlauderm Date 2000-03-29 Time 10:16 Sent To  
Notes
2001-01-08 00:00:00PASSED WITH THE FOLLOWING PROVISOS:
 1.PARKING LOT CAN NOT BE BUILT UNTIL
 THE UNDERGROUND UTILITY PLAN IS APPROVED
 FOR WATER, SANITARY AND STORM WATER.
  
 2.NO STORMWATER PLAN HAS BEEN APPROVED
 AND ALL OF THE FOLLOWING ITEMS NEED TO
 BE ADDRESSED;
  
 A. CONSTRUCTION PLANS
  
 B. DETAILS AND SPECIFICATIONS
  
 C. HYDRAULIC COMPUTATIONS AND SUPPORTING
 DOCUMENTATION
  
 D. IMPERVIOUS AREA COMPUTATIONS
  
 E. POLLUTION PREVENTION PLAN.THE
 POLLUTION PREVENTION PLAN SHALL BE KEPT
 ON SITE AT ALL TIMES DURING
 CONSTRUCTION. THE PLAN SHALL BE
 INSTALLED IN THE FIELD PRIOR TO ANY
 EARTHWORK. THE ENGINEER OF RECORD SHALL
 CERTIFY TO THE CITY, ON A MONTHLY BASIS,
 THAT THE PLAN IS WORKING PROPERLY AND AS
 DESIGNED. THE ENGINEER OF RECORD IS
 RESPONSIBLE TO CERTIFY IMPLEMENTATION OF
 THE PROVISIONS OF CITY ORDINANCE NO.
 3132-98 OF THE CITY CODE AT SUCH TIME
 THE PERMITTEE APPLIES FOR A CERTIFICATE
 OF OCCUPANCY FROM THE CITY BUILDING
 OFFICIAL
  
 F. EVERY SIX MONTHS AFTER CONSTRUCTION A
 PE SHALL CERTIFY THAT THE PERMANENT
 POLLUTION PREVENTION STRUCTURES, DRY-WET
 WATER DETENTION FACILITIES, AND
 EXFILTRATION SYSTEMS ARE WORKING AS
 DESIGNED AND ARE IN GOOD OPERATING
 CONDITION. ALL CERTIFICATIONS MUST BE
 SUBMITTED TO:
 STORM WATER UTILITY ENGINEER
 CITY OF WEST PALM BEACH PUBLIC UTILITIES
 DEPARTMENT
 P.O. BOX 3366, WEST PALM BEACH, FL
 33402.
  
 THE CERTIFICATION MUST INCLUDE THE
 BUILDING PERMIT NUMBER, THE ADDRESS OF
 THE PROPERTY AND THE NAME OF THE
 ESTABLISHMENT/PROJECT CONSTRUCTED.
  
 3. SHEETS A-1, A-1.1, P2.1 AND SHEET 1
 OF 2 OF THE FIRE SPRINKLER PLAN SHOW THE
 BACKFLOW LOCATION FOR THE FIRE SPRINKLER
 SYSTEM AT THE BUILDING (SOUTHWEST
 CORNER).THIS IS INCORRECT, IT WILL BE
 PLACED AT THE WEST PROPERTY LINE AS
 SHOWN ON THE UNDERGROUND UTILITY PLAN
 SUPPLIED BY SIMMONS AND WHITE (SEE
 ATTACHED).
  
 4.DETAIL FOR THE DCDA ON THE FIRE
 SPRINKLER DRAWING (1 OF 2) DOES NOT SHOW
 AN ELEVATION ABOVE THE FLOOD PLAIN OR
 GROUND ELEVATION.IT MUST BE PER THE
 CITY DETAIL SHOWN ON THE UNDERGROUND
 PLAN BY SIMMONS AND WHITE.
  
 5.ON SHEET P2.2 THE SANITARY SEWER
 PIPING EXITS THE NORTH SIDE OF THE
 BUILDING NEAR "K4".WHILE THE
 UNDERGROUND PLAN BY SIMMONS AND WHITE
 SHOWS THE LATERAL ENTERING THE BUILDING
 ON THE EAST SIDE NEAR "H5".YOU NEED TO
 COORDINATE THIS DESIGN AND WORK SINCE IT
 WILL BE INSTALLED PER THE SIMMONS AND
 WHITE PLAN.
  
 6.ON SHEET P2.2 AN 1-1/2" METER IS
 SHOWN TO BE PLACED AT THE NORTHEAST
 CORNER OF THE BUILDING WITH THE 2" PIPE
 ENTERING THE BUILDING AT "K5".ON THE
 UNDERGROUND PLAN BY SIMMONS AND WHITE
 (SEE ATTACHED) SHOW THE WATER METER AT
 THE SOUTHWEST CORNER OF THE PROPERTY
 WITH THE WATER LINE ENTERING THE
 BUILDING AT "A3.1" ON SHEET P2.1.YOU
 NEED TO COORDINATE THIS DESIGN AND WORK
 SINCE IT WILL BE INSTALLED PER THE
 SIMMONS AND WHITE PLAN.

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2000-01-07 Cont ID  
Sent By rturnque Date 2000-01-07 Time 14:48 Rev Time 0.30
Received By rturnque Date   Time   Sent To  
Notes
2001-01-08 00:00:00PROVIDE EXIT LIGHT AND EMERGENCY LIGHT
 ILLUMINATION

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-01-25 Cont ID  
Sent By ndenmark Date 2000-01-25 Time 07:56 Rev Time 0.50
Received By ndenmark Date 2000-01-25 Time 07:56 Sent To  
Notes
2001-01-08 00:00:00PROVISO:
 LOCAL AMENDMENTS REQUIRE MIN. 18" CLEAR-
 ANCE BETWEEN ROOF SURFACE AND BOTTOM OF
 SUPPORT STRUCTURE SEE MODEL COUNTYWIDE
 AMENDMENTS SMC304.2.5

Review Stop P PLUMBING
Rev No 2 Status P Date 2000-05-06 Cont ID  
Sent By tlarge Date 2000-05-06 Time 10:02 Rev Time 0.75
Received By tlarge Date 2000-05-06 Time 10:02 Sent To  
Notes
2001-01-08 00:00:00*******************PROVISO**************
  
 SUBMIT DETAILS FOR OVERFLOW DRAINAGE.
 COMPLY W/SBC SEC.1517.6.4.1-1517.6.4.3.
 SPC SEC.1109.1-1109.3.AND APPENDIX "A".

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-01-25 Cont ID  
Sent By tlarge Date 2000-01-25 Time 18:25 Rev Time 1.00
Received By tlarge Date 2000-01-25 Time 18:24 Sent To  
Notes
2001-01-08 00:00:00*****************PROVISO****************
 DETAILS FOR ROOF DRAINAGE SHALL BE
 SUBMITTED.SCUPPERS SHALL COMPLY W/SPC
 SEC.1109.1 & 1/2 THE AREA OF THE PARAPET
 WALL SHALL BE INCLUDED IN THE CALCS.
 (SEE SPC TABLE A101.2)
  
 CIVIL DRAWINGS SHALL BE SUBMITTED PRIOR
 TO BEGINNING OF ANY WORK.COUNTYWIDE
 AMENDMENTS TO SPC SEC.104.2.1.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-05-02 Cont ID  
Sent By gjoyce Date 2000-01-06 Time 10:33 Rev Time 0.50
Received By gjoyce Date   Time   Sent To  
Notes
2001-01-08 00:00:00NEEDS LIGHTING PLAN/STREETSCAPE


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved