Plan Review Details - Permit 99121045
Plan Review Stops For Permit 99121045
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2000-04-19 Cont ID  
Sent By dpalmer Date 2000-04-19 Time 14:34 Rev Time 0.00
Received By dpalmer Date 2000-04-19 Time 14:34 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-01-08 Cont ID  
Sent By dpalmer Date 2000-01-08 Time 10:40 Rev Time 0.00
Received By dpalmer Date 2000-01-08 Time 10:40 Sent To  
Notes
2001-01-08 00:00:00*************PROVISO********************
  
 1)NOTE:AS REQ`D BY ART;250-81/215-5
 NEED TO SHOW COLD WATER PIPE AS PART OF
 THE GROUNDING ELECTRODE SYSTEM.
  
 2)NOTE:MISSING OUTLET AS PER 210-52
  
 3)NOTE: MAIN DISCONNECT IS DRAWN ON
 PLANS?? IF THERE IS GOING TO BE A MAIN
 DISC. THEN PLEASE HAVE DRAWN ON RISER
 DIAGRAM AS REQ`D BY 215-5
  
 PLEASE SUBMIT THE ABOVE INFORMATION
 FOR REVIEW AND APPROVAL BEFORE FIRST
 ROUGH ELECTRICAL INSPECTION IS CALLED IN
 IF THERE ARE ANY QUESTIONS;659-8096
 EXT 8372

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-01-04 Cont ID  
Sent By jleech Date 2000-01-04 Time 15:48 Rev Time 0.50
Received By jleech Date 2000-01-04 Time 15:48 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-01-20 Cont ID  
Sent By tlarge Date 2000-01-20 Time 09:04 Rev Time 0.33
Received By tlarge Date 2000-01-20 Time 09:04 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2000-04-21 Cont ID  
Sent By jgomez Date 2000-04-21 Time 19:11 Rev Time 0.50
Received By jgomez Date 2000-04-21 Time 19:11 Sent To  
Notes
2001-01-08 00:00:00SUBMITTAL FOR ITEMS REQUESTED ON
 PROVISO DATED 1/19/00

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2000-01-28 Cont ID  
Sent By jgomez Date 2000-01-19 Time 16:06 Rev Time 0.00
Received By jgomez Date 2000-01-28 Time 12:24 Sent To  
Notes
2001-01-08 00:00:00APPROVED WITH PROVISO:
 1-FLOOD ZONE "A0", PROVIDE ELEVATION
 CERTIFICATE.
 2-PROVIDE PRODUCT APPROVAL FOR ENTRY
 DOOR WITH SIDELITE ASSEMBLY.
 3-STORM PANELS:
 -REVISE KEY PLAN AND INSTALLATION
 SCHEDULE TO MATCH ARCHITECT'S PLANS.
 -HIGHLIGHT SPECIFIC MOUNTING METHOD AND
 SPECIFIC ANCHOR SPACING TO BE USED
 CONSIDERING THE EDGE DISTANCE, DESIGN
 PRESSURES, PANEL SPAN AND CONSTRUCTION
 TYPE OF BUILDING. THIS BUILDING IS
 MASONRY CONSTRUCTION, NOT CONCRETE.
 4-SEE COMMENTS ON PLANS AND UPDATE
 DRAWINGS AS REQUIRED.
 5-RE SUBMIT PRODUCT APPROVALS FOR DOOR
 AND WINDOWS.
 6-REVISE SURVEY TO MATCH ARCHITECT'S
 PLANS.

Review Stop Z ZONING
Rev No 1 Status P Date 1999-12-23 Cont ID  
Sent By gjoyce Date 1999-12-23 Time 08:52 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***