Plan Review Stops For Permit 99020715 |
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
1999-06-15 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
1999-06-15 |
Time |
10:21 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
1999-09-18 |
Time |
11:36 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | APPROVED BY JAKE. SEE APPLICATION |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
1999-03-08 |
|
|
Cont ID |
|
Sent By |
ndenmark |
Date |
1999-03-08 |
Time |
14:27 |
Rev Time |
0.25 |
Received By |
ndenmark |
Date |
1999-03-08 |
Time |
14:27 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
1999-03-13 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
1999-03-13 |
Time |
09:35 |
Rev Time |
0.75 |
Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
7 |
Status |
P |
Date |
2000-04-04 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2000-04-04 |
Time |
16:33 |
Rev Time |
0.25 |
Received By |
jgomez |
Date |
2000-04-04 |
Time |
16:33 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | NOTES: | | PERMIT TYPE ON SCREEN #1 WAS CHANGED | | FROM BLD-RES TO MASTER TO ALLOW PERMITS | | TO BE PRINTED. ORIGINAL PERMIT | | APPLICATION WAS SUBMITTED FOR A BLD-RES | | AND LATER ON APPLICANT WANTED TO OBTAIN | | A MASTER PERMIT. SUCH CHANGE WAS NEVER | | REVISED ON THIS SCREEN. THEREFORE, I | | CHANGED THE PERMIT TYPE TO AVOID MORE | | CONFUSION AND BE ABLE TO REFER TO THIS | | NUMBER AS THE MASTER NUMBER FOR TYPE I | | MODEL, INCLUDING STORM PANELS. | | JG. 4-4-00 |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
6 |
Status |
F |
Date |
1999-10-28 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
1999-10-28 |
Time |
14:32 |
Rev Time |
0.50 |
Received By |
jgomez |
Date |
1999-10-28 |
Time |
14:32 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | | | CHECKLIST FOR PROVISO GIVEN ON 10/15/99: | | 1-PROVIDE COMPLETE SPECIFICATIONS AND | | DETAILS FOR CONSTRUCTION OF CEILING AT | | PORCH. SEC 104.2.2 CITY AMENDMENTS. | | NOTE: ALCOA RIGID VINYL SIDING AND | | SOFFIT PRODUCT APPROVAL DOESN'T | | INCLUDE INSTALLATION AT PORCHE'S | | CEILING. | | 2-SPECIFY ATTIC VENTILATION FOR NEW | | SOFFIT SYSTEM AS PER SEC 2309.7 SBC/94 |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
5 |
Status |
P |
Date |
1999-10-15 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
1999-10-15 |
Time |
14:02 |
Rev Time |
0.25 |
Received By |
jgomez |
Date |
1999-10-15 |
Time |
14:02 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | VINYL SIDING APPROVED WITH PROVISO: | | 1-PROVIDE MANUFACTURER'S INSTALLATION | | SPECIFICATIONS. | | 2-PROVIDE COMPLETE DETAILS AND | | SPECIFICATIONS FOR INSTALLATION AT | | PORCH'S CEILING. |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
4 |
Status |
P |
Date |
1999-10-07 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
1999-10-07 |
Time |
17:27 |
Rev Time |
0.30 |
Received By |
jgomez |
Date |
1999-10-07 |
Time |
17:27 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | APPROVED TRUSSES. JG |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
3 |
Status |
P |
Date |
1999-10-07 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
1999-10-07 |
Time |
09:16 |
Rev Time |
0.25 |
Received By |
jgomez |
Date |
1999-10-07 |
Time |
09:16 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | SHINGLES PRODUCT APPROVAL. JG. |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
2 |
Status |
F |
Date |
1999-09-25 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
1999-09-18 |
Time |
11:37 |
Rev Time |
1.00 |
Received By |
jgomez |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | CHECKLIST - MODEL I: | | 1-ENGINEER OF RECORD TO REVIEW ALL TRUSS | | DRAWINGS PRIOR TO SUBMITTAL. | | 2-ENGINEERED TRUSSES: | | *REVISE DIMENSION OF BUILDING SHOWNN ON | | ENGINEERED TRUSSES. | | *CHECK MEAN ROOF HEIGHT. | | *CLARIFY NOTE SAYING THAT IF PORCHES | | EXIST, THEY ARE NOT EXPOSED TO WIND. | | WHY? | | WHAT DOES DOL STANDS FOR? DEFLECTION? | | *REVISE DESIGN CRITERIA DATA ON TRUSS | | LAYOUT. IT DOESN'T MATCH DESIGN | | CRITERIA ON ENGINEERED TRUSSES. | | *WHY NOT ALL THE ENGINEERED TRUSSES | | SHOW THE DESIGN CRITERIA USED TO | | DETERMINE THE LOADS?. | | 3-CHECK/REVISE ALL HURRICANE ANCHORS | | SPECIFIED. WILL THEY RESIST THE | | HORIZONTAL LOADS CALCULATED BY THE | | ENGINEERED TRUSSES? | | 4-PROVIDE COMPLETE DETAILS AND SPECS FOR | | ALUMINUM CEILING AT PORCH. |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
P |
Date |
1999-04-05 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
1999-04-05 |
Time |
15:17 |
Rev Time |
0.00 |
Received By |
jgomez |
Date |
|
Time |
|
Sent To |
O |
|
Notes |
2001-01-08 00:00:00 | APPROVED WITH PROVISO |
|
|