Plan Review Details - Permit 23051355
Plan Review Stops For Permit 23051355
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-07-24 Cont ID  
Sent By jleahy Date 2023-07-24 Time 14:14 Rev Time 0.00
Received By jleahy Date 2023-07-24 Time 14:11 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2023-06-23 Cont ID  
Sent By jleahy Date 2023-06-23 Time 15:07 Rev Time 0.00
Received By jleahy Date 2023-06-23 Time 14:57 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2023-07-13 Cont ID  
Sent By pleduc Date 2023-07-13 Time   Rev Time 0.00
Received By pleduc Date 2023-07-13 Time 15:20 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2023-06-13 Cont ID  
Sent By pleduc Date 2023-06-13 Time   Rev Time 0.00
Received By pleduc Date 2023-06-13 Time 11:44 Sent To  
Notes
2023-06-13 12:00:36THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) THERE IS AN INDICATION OF A GENERATOR, HOWEVER,
 THERE ARE NO MANUFACTURES SPEC SHEETS NOR
 CLASSIFICATION, TYPE & LEVEL PER NFPA 110.
  
 CHAPTER 4 CLASSIFICATION OF EMERGENCY POWER SUPPLY
 SYSTEMS (EPSSS)
  
 4.1* GENERAL. THE EPSS SHALL PROVIDE A SOURCE OF
 ELECTRICAL
 POWER OF REQUIRED CAPACITY, RELIABILITY, AND QUALITY TO
 LOADS FOR
 A LENGTH OF TIME AS SPECIFIED IN TABLE 4.1(A) AND
 WITHIN A SPECIFIED
 TIME FOLLOWING LOSS OR FAILURE OF THE NORMAL POWER
 SUPPLY
 AS SPECIFIED IN TABLE 4.1(B).
  
 4.2* CLASS. THE CLASS DEFINES THE MINIMUM TIME, IN
 HOURS, FOR
 WHICH THE EPSS IS DESIGNED TO OPERATE AT ITS RATED LOAD
 WITHOUT
 BEING REFUELED OR RECHARGED. [SEE TABLE 4.1(A).]
 4.3 TYPE. THE TYPE DEFINES THE MAXIMUM TIME, IN
 SECONDS,
 THAT THE EPSS WILL PERMIT THE LOAD TERMINALS OF THE
 TRANSFER
 SWITCH TO BE WITHOUT ACCEPTABLE ELECTRICAL POWER. TABLE
 4.1(B)
 PROVIDES THE TYPES DEFINED BY THIS STANDARD.
 4.4* LEVEL. THIS STANDARD RECOGNIZES TWO LEVELS OF
 EQUIPMENT
 INSTALLATION, PERFORMANCE, AND MAINTENANCE.
 4.4.1* LEVEL 1 SYSTEMS SHALL BE INSTALLED WHERE FAILURE
 OF THE
 EQUIPMENT TO PERFORM COULD RESULT IN LOSS OF HUMAN LIFE
 OR
 SERIOUS INJURIES.
 4.4.2* LEVEL 2 SYSTEMS SHALL BE INSTALLED WHERE FAILURE
 OF THE
 EPSS TO PERFORM IS LESS CRITICAL TO HUMAN LIFE AND
 SAFETY.
 4.4.3 ALL EQUIPMENT SHALL BE PERMANENTLY INSTALLED.
 4.4.4* LEVEL 1 AND LEVEL 2 SYSTEMS SHALL ENSURE THAT
 ALL LOADS
 SERVED BY THE EPSS ARE SUPPLIED WITH ALTERNATE POWER
 THAT
 MEETS ALL THE FOLLOWING CRITERIA:
 (1) OF A QUALITY WITHIN THE OPERATING LIMITS OF THE
 LOAD
 (2) FOR A DURATION SPECIFIED FOR THE CLASS AS DEFINED
 IN TABLE
 4.1(A)
 (3) WITHIN THE TIME SPECIFIED FOR THE TYPE AS DEFINED
 IN TABLE
 4.1(B)
  
 PLEASE REVIEW AND PROVIDE.
  
  
  
 2) THERE IS NO INDICATION OF A FUEL SOURCE.
  
 7.9 FUEL SYSTEM.
 7.9.1 FUEL TANKS SHALL BE SIZED TO ACCOMMODATE THE
 SPECIFIC
 EPS CLASS.
 7.9.1.1 ALL FUEL TANKS AND SYSTEMS SHALL BE INSTALLED
 AND MAINTAINED
 IN ACCORDANCE WITH NFPA 30, FLAMMABLE AND COMBUSTIBLE
 LIQUIDS CODE; NFPA 37, STANDARD FOR THE INSTALLATION
 AND USE OF
 STATIONARY COMBUSTION ENGINES AND GAS TURBINES; NFPA
 54, NATIONAL
 FUEL GAS CODE; AND NFPA 58, LIQUEFIED PETROLEUM GAS
 CODE
  
 PLEASE REVIEW AND PROVIDE.
  
  
 2A) THERE APPEARS TO BE AN INDICATION OF NG, HOWEVER,
 THERE ARE NO NG SUPPLY DETAILS, INCLUDING PIPING TIE-IN
 LOCATION, SIZE, LENGTH, DEPTH DIMENSION, ETC.
  
 1.7.12 PLANS AND SPECIFICATIONS.
  
 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE
 PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH
 APPLICABLE CODES AND STANDARDS
  
 PER NFPA 54
  
 CHAPTER 1 ADMINISTRATION
 1.1 SCOPE.
 1.1.1 APPLICABILITY.
 1.1.1.1 THIS CODE IS A SAFETY CODE THAT SHALL APPLY TO
 THE INSTALLATION
 OF FUEL GAS PIPING SYSTEMS, APPLIANCES, EQUIPMENT, AND
 RELATED ACCESSORIES AS SHOWN IN 1.1.1.1(A) THROUGH
 1.1.1.1(D).
 (A)* COVERAGE OF PIPING SYSTEMS SHALL EXTEND FROM THE
 POINT OF
 DELIVERY TO THE APPLIANCE CONNECTIONS. FOR OTHER THAN
 UNDILUTED
 LIQUEFIED PETROLEUM GAS (LP-GAS) SYSTEMS, THE POINT OF
 DELIVERY SHALL BE THE OUTLET OF THE SERVICE METER
 ASSEMBLY OR THE
 OUTLET OF THE SERVICE REGULATOR OR SERVICE SHUTOFF
 VALVE WHERE NO
 METER IS PROVIDED. FOR UNDILUTED LP-GAS SYSTEMS, THE
 POINT OF
 DELIVERY SHALL BE CONSIDERED TO BE THE OUTLET OF THE
 FINAL PRESSURE
 REGULATOR, EXCLUSIVE OF LINE GAS REGULATORS WHERE NO
 METER
 IS INSTALLED. WHERE A METER IS INSTALLED, THE POINT OF
 DELIVERY
 SHALL BE THE OUTLET OF THE METER.
  
 IF NG IS THE FUEL SOURCE, PLEASE PROVIDE FUEL INE
 DETAILS PER NFPA 54.
  
  
 3) THERE IS A SITE PLAN SUBMITTED, HOWEVER, THERE IS NO
 SPECIFIC DETAIL OF THE LOCATION INCLUDING ALL
 DIMENSIONS TO THE NEAREST BUILDINGS, WINDOW, DOORS,
 A/C, ETC.
  
 1.7.12 PLANS AND SPECIFICATIONS.
  
 1.7.12.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE
 PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH
 APPLICABLE CODES AND STANDARDS
  
 PLEASE PROVIDE A DETAILED SITE PLAN.
  
  
  
 4) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET
 REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE
 ABOVE.
  
  
  
 5) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE
 RE-SUBMITTAL OF THE ABOVE.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-07-24 Cont ID  
Sent By jleahy Date 2023-07-24 Time 14:14 Rev Time 0.00
Received By jleahy Date 2023-07-12 Time 09:06 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-06-30 Cont ID  
Sent By cmontell Date 2023-06-30 Time 12:54 Rev Time 0.00
Received By cmontell Date 2023-06-30 Time 12:54 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2023-06-30 Cont ID  
Sent By cmontell Date 2023-06-30 Time 12:54 Rev Time 0.00
Received By cmontell Date 2023-06-30 Time 12:54 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-07-24 Cont ID  
Sent By jleahy Date 2023-07-24 Time 14:14 Rev Time 0.00
Received By jleahy Date 2023-07-24 Time 14:11 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-06-23 Cont ID  
Sent By jleahy Date 2023-06-23 Time 15:08 Rev Time 0.00
Received By jleahy Date 2023-06-23 Time 14:57 Sent To  
Notes
2023-06-23 15:09:44FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 PLANS NEED TO BE SIGNED AND SEALED BY ENGINEER.
  
 FS 470.103(H)

Review Stop Z ZONING
Rev No 2 Status P Date 2023-07-14 Cont ID  
Sent By asangele Date 2023-07-14 Time 09:30 Rev Time 0.00
Received By asangele Date 2023-07-14 Time 09:30 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2023-06-22 Cont ID  
Sent By asangele Date 2023-06-22 Time 13:53 Rev Time 0.00
Received By asangele Date 2023-06-22 Time 13:53 Sent To  
Notes
2023-06-22 13:59:066/22/2023
 FAILED
  
 PLEASE PROVIDE PROPERTY SURVEY WITH LABELED SETBACKS OF
 THE GENERATOR
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved