Plan Review Details - Permit 23050727
Plan Review Stops For Permit 23050727
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-06-21 Cont ID  
Sent By rmcdouga Date 2023-06-21 Time 14:21 Rev Time 0.00
Received By rmcdouga Date 2023-06-21 Time 14:03 Sent To  
Notes
2023-06-21 14:12:37PLAN
 REVIEW COMMENTS
  
 1ST REVIEW: FBC SEVENTH EDITION (2020)
 ROBERT MCDOUGAL, CBO
 COMMERCIAL COMBINATION PLANS EXAMINER
 (561) 805-6714
 [email protected]
  
 DENIED BY BUILDING
 PLEASE ADDRESS THE ITEMS NOTED BELOW:
  
 1) 1) SUBMIT GENERATOR PAD DRAWINGS WITH GENERATOR TO
 PAD ANCHORING DETAILS. IF A PREFABRICATED GENERATOR PAD
 WILL BE USED, SUBMIT SIGNED AND SEALED SITE SPECIFIC
 ENGINEERING FOR IT. FBC AMENDMENTS 107.2.1
  
 2) THE GENERATOR EXHAUST IS REQUIRED TO BE AT LEAST 10
 FEET FROM ANY OPENINGS INTO A BUILDING. SPECIFY THIS ON
 THE SURVEY. FBC-R303.5.1 INTAKE OPENINGS. MECHANICAL
 AND GRAVITY OUTDOOR AIR INTAKE OPENINGS SHALL BE
 LOCATED NOT LESS THAN 10 FEET (3048 MM) FROM ANY
 HAZARDOUS OR NOXIOUS CONTAMINANT, SUCH AS VENTS,
 CHIMNEYS, PLUMBING VENTS, STREETS, ALLEYS, PARKING LOTS
 AND LOADING DOCKS.
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2023-05-17 Cont ID  
Sent By jcooley Date 2023-05-17 Time 19:18 Rev Time 0.00
Received By jcooley Date 2023-05-17 Time 18:50 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2023-05-18 Cont ID  
Sent By rwbrown Date 2023-05-18 Time 10:05 Rev Time 0.00
Received By rwbrown Date 2023-05-18 Time 10:05 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-06-21 Cont ID  
Sent By rmcdouga Date 2023-06-21 Time 14:21 Rev Time 0.00
Received By rmcdouga Date 2023-05-15 Time 11:00 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2023-05-18 Cont ID  
Sent By rwbrown Date 2023-05-18 Time 10:05 Rev Time 0.00
Received By rwbrown Date 2023-05-18 Time 10:05 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-06-21 Cont ID  
Sent By rmcdouga Date 2023-06-21 Time 14:12 Rev Time 0.00
Received By rmcdouga Date 2023-06-21 Time 14:03 Sent To  
Notes
2023-06-21 14:20:56THE SIGNATURE WILL BE REVIEWED WHEN THE PAD AND
 ANCHORING DRAWINGS ARE SUBMITTED.
2023-05-18 10:06:16GAS PAGE SIGNED BY CONTRACTOR

Review Stop Z ZONING
Rev No 1 Status P Date 2023-06-07 Cont ID  
Sent By gvolcy Date 2023-06-07 Time 17:21 Rev Time 0.00
Received By avolcy Date 2023-06-07 Time 17:21 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved