Plan Review Details - Permit 23040846
Plan Review Stops For Permit 23040846
Review Stop ENG ENGINEERING CSD
Rev No 4 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status P Date 2023-06-27 Cont ID  
Sent By cseifer Date 2023-06-27 Time 08:26 Rev Time 0.00
Received By cseifer Date 2023-06-27 Time 08:26 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 2 Status F Date 2023-05-05 Cont ID  
Sent By lquinone Date 2023-05-05 Time 13:58 Rev Time 0.00
Received By lquinone Date 2023-05-05 Time 13:58 Sent To  
Notes
2023-05-05 14:06:18PLEASE INDICATE DIMENSIONS OF EXISTING AND PROPOSED
 APRON. MAXIMUM APRON WIDTH SHALL NOT EXCEED 20 FT
 (EXISTING + PROPOSED = 20FT MAX.).
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 CONSTRUCTION.
  
 UPDATE SURVEY WITH REQUESTED INFORMATION AND RESUBMIT
 WITH A COPY OF THE APPLICABLE STANDARD DETAIL FOR
 DRIVEWAYS.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON???T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE WHERE CAN I FIND MY PLAN REVIEW
 COMMENTS ONLINE? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 LINDA M. QUINONES-CINTRON, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT (561) 494-1085
 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2023-04-27 Cont ID  
Sent By lquinone Date 2023-04-27 Time 14:14 Rev Time 0.00
Received By lquinone Date 2023-04-27 Time 14:14 Sent To  
Notes
2023-04-27 14:20:11DIMENSION DRIVEWAYS, LOCATED HORIZONTALLY AND
 VERTICALLY. SHOW ANY WATER METERS, SANITARY CLEANOUTS,
 STORM INLETS ETC. IN VICINITY OF PROPOSED DRIVEWAY. DO
 NOT CONSTRUCT DRIVEWAY ON TOP OF WATER METERS, SANITARY
 CLEANOUTS, STORMWATER INLETS ETC. MAXIMUM DRIVEWAY
 WIDTHS AT RIGHT OF WAY (APRON) SHALL NOT EXCEED 20 FT.
  
 CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB
 CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE
 BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER),
 OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR
 EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD
 DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG
 /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS
  
 CALL 811 FOR UTILITY LOCATES 48 HRS. IN ADVANCE OF
 CONSTRUCTION.
  
 UPDATE SURVEY WITH REQUESTED INFORMATION AND RESUBMIT
 WITH A COPY OF THE APPLICABLE STANDARD DETAIL FOR
 DRIVEWAYS.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON???T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE WHERE CAN I FIND MY PLAN REVIEW
 COMMENTS ONLINE? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 LINDA M. QUINONES-CINTRON, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT (561) 494-1085
 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By amcgrego Date 2023-07-19 Time 11:44 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-06-29 Cont ID  
Sent By asangele Date 2023-06-29 Time 15:17 Rev Time 0.00
Received By asangele Date 2023-06-29 Time 15:17 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-05-08 Cont ID  
Sent By asangele Date 2023-05-08 Time 11:56 Rev Time 0.00
Received By asangele Date 2023-05-08 Time 11:56 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-04-28 Cont ID  
Sent By aoliver Date 2023-04-28 Time 08:03 Rev Time 0.00
Received By aoliver Date 2023-04-17 Time 17:55 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 4 Status P Date 2023-07-19 Cont ID  
Sent By asangele Date 2023-07-19 Time 15:17 Rev Time 0.00
Received By asangele Date 2023-07-19 Time 15:17 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status F Date 2023-06-29 Cont ID  
Sent By asangele Date 2023-06-29 Time 15:17 Rev Time 0.00
Received By asangele Date 2023-06-29 Time 15:17 Sent To  
Notes
2023-06-29 15:18:15FAILED
 6/29/2023
  
 REPEAT COMMENT
  
 IF YOU ARE PROPOSING TWO SEPARATE DRIVEWAYS THE WIDTH
 CANNOT EXCEED 10FT EACH PLEASE INDICATE THE WIDTH
 MEASUREMNET OF EACH DRIVEWAY ON THE SURVEY.
  
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]

Review Stop Z ZONING
Rev No 2 Status F Date 2023-05-08 Cont ID  
Sent By asangele Date 2023-05-08 Time 11:54 Rev Time 0.00
Received By asangele Date 2023-05-08 Time 11:54 Sent To  
Notes
2023-05-08 11:56:13FAILED
 5/8/2023
  
 REPEAT COMMENT
  
 IF YOU ARE PROPOSING TWO SEPARATE DRIVEWAYS THE WIDTH
 CANNOT EXCEED 10FT EACH PLEASE INDICATE THE WIDTH
 MEASUREMNET OF THE DRIVEWAYS ON THE SURVEY.
  
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]

Review Stop Z ZONING
Rev No 1 Status F Date 2023-04-24 Cont ID  
Sent By asangele Date 2023-04-24 Time 16:58 Rev Time 0.00
Received By asangele Date 2023-04-24 Time 16:58 Sent To  
Notes
2023-04-24 17:00:36FAILED
 4/24/2023
  
  
 IF YOU ARE PROPOSING TWO SEPARATE DRIVEWAYS THE WIDTH
 CANNOT EXCEED 10FT EACH PLEASE INDICATE THE WIDTH
 MEASUREMNET OF THE DRIVEWAYS ON THE SURVEY.
  
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved