Plan Review Details - Permit 23040317
Plan Review Stops For Permit 23040317
Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 3 Status F Date 2023-07-20 Cont ID  
Sent By lbond Date 2023-07-20 Time 15:31 Rev Time 0.00
Received By lbond Date 2023-07-20 Time 15:31 Sent To  
Notes
2023-07-20 15:32:13REFER TO PREVIOUS COMMENT

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status F Date 2023-06-28 Cont ID  
Sent By lbond Date 2023-06-28 Time 08:35 Rev Time 0.00
Received By lbond Date 2023-06-28 Time 08:35 Sent To  
Notes
2023-06-28 08:36:15REFER TO PREVIOUS COMMENT

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2023-06-12 Cont ID  
Sent By lbond Date 2023-06-12 Time 10:39 Rev Time 0.00
Received By lbond Date 2023-06-12 Time 10:39 Sent To  
Notes
2023-06-12 10:41:21BUILDING REVIEW COMMENTS:
  
 W.P.B. PERMIT: 23040317
  
 REVIEWED: 6.12.2023
  
 FLORIDA BUILDING CODE,7TH EDITION (2020)
 FBC[AMENDED] = 2017 CHAPTER 1 WPB AMENDMENTS (SEE LINK
 BELOW)
 HTTPS://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/
 BUILDING-PERMIT-FORMS
 FBC BUILDING
 FBC EXISTING BUILDING
  
 COMMENTS:
  
 ASBESTOS REVIEW: FAILED
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED, AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC
 ES/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION
 -RENOVATION.HTML
  
 IF YOU HAVE ANY QUESTIONS OR CONCERNS, PLEASE DO NOT
 HESITATE TO CONTACT ME
  
 LOUIS BOND, AIA
 BUILDING PLANS EXAMINER II
 DEVELOPMENT SERVICES DEPT.
 BUILDING DIVISION
 401 CLEMATIS STREET
 WEST PALM BEACH, FLORIDA 33401
 PH: 561-805-6729
 FX: 561-805-6676
 EMAIL: [email protected]
  
  
 NOTES:
 PLEASE PROVIDE COMMENT RESPONSE SHEET TO EXPLAIN HOW
 EACH COMMENT IS BEING ADDRESSED.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-07-20 Cont ID  
Sent By lbond Date 2023-07-20 Time 15:30 Rev Time 0.00
Received By lbond Date 2023-07-20 Time 15:30 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-06-28 Cont ID  
Sent By lbond Date 2023-06-28 Time 08:34 Rev Time 0.00
Received By lbond Date 2023-06-28 Time 08:34 Sent To  
Notes
2023-06-28 08:35:52THE BUILIDNG IS SPRINKLERED SO YOUR PREVIOUS
 CALCUALTION WAS CORRECT.
 PLEASE RESUBMIT PREVIOUS SHEET DIGITALLY SIGNED AND
 SEALED SO WE CAN PASS BUILDING.
  
 MAKE SURE TO INCLUDE THE ASBESTOS LETTER AS WELL.
 THANK YOU
  
 LOUIS BOND, AIA
 BUILDING PLANS EXAMINER II
 DEVELOPMENT SERVICES DEPT.
 BUILDING DIVISION
 401 CLEMATIS STREET
 WEST PALM BEACH, FLORIDA 33401
 PH: 561-805-6729
 FX: 561-805-6676
 EMAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-06-12 Cont ID  
Sent By lbond Date 2023-06-12 Time 11:23 Rev Time 0.00
Received By lbond Date 2023-06-12 Time 11:23 Sent To  
Notes
2023-06-12 11:31:23FBC CHAPTER 10 EGRESS
 SHEET LS101
 UPDATE EGRESS AND STAIRWAY DOOR CALCULATION AS PER
 CODE- YOU HAVE IT REVERSED FOR THE COEFFICIENT.
 RESUBMIT DIGITALLY SIGNED AND SEALED SHEET.
  
 IF YOU HAVE ANY QUESTIONS OR CONCERNED
 YOU MAY CONTACT ME
  
 LOUIS BOND, AIA
 BUILDING PLANS EXAMINER II
 DEVELOPMENT SERVICES DEPT.
 BUILDING DIVISION
 401 CLEMATIS STREET
 WEST PALM BEACH, FLORIDA 33401
 PH: 561-805-6729
 FX: 561-805-6676
 EMAIL: [email protected]
  
 :

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2023-06-02 Cont ID  
Sent By rperdomo Date 2023-06-02 Time 14:34 Rev Time 0.00
Received By rperdomo Date 2023-06-02 Time 14:22 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2023-07-18 Cont ID  
Sent By pleduc Date 2023-07-18 Time   Rev Time 0.00
Received By pleduc Date 2023-07-18 Time 09:43 Sent To  
Notes
2023-07-18 09:44:28FIRE PROVISO:
  
 ANY REMOVAL OR CONSTRUCTION OF WALLS/CEILINGS REQUIRES
 AND EVALUATION OF THE FIRE SPRINKLER AND FIRE ALARM
 SYSTEMS FOR CODE COMPLIANT COVERAGE
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING
 DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP
 DRAWINGS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2023-06-28 Cont ID  
Sent By pleduc Date 2023-06-28 Time   Rev Time 0.00
Received By pleduc Date 2023-06-28 Time 13:24 Sent To  
Notes
2023-06-28 13:25:12FIRE PROVISO:
  
 ANY REMOVAL OR CONSTRUCTION OF WALLS/CEILINGS REQUIRES
 AND EVALUATION OF THE FIRE SPRINKLER AND FIRE ALARM
 SYSTEMS FOR CODE COMPLIANT COVERAGE
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING
 DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP
 DRAWINGS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2023-05-22 Cont ID  
Sent By pleduc Date 2023-05-22 Time   Rev Time 0.00
Received By pleduc Date 2023-05-22 Time 11:07 Sent To  
Notes
2023-05-22 14:38:39FIRE PROVISO:
  
 ANY REMOVAL OR CONSTRUCTION OF WALLS/CEILINGS REQUIRES
 AND EVALUATION OF THE FIRE SPRINKLER AND FIRE ALARM
 SYSTEMS FOR CODE COMPLIANT COVERAGE
  
 THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE
 MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS
  
 ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING
 DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP
 DRAWINGS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-07-21 Cont ID  
Sent By aoliver Date 2023-07-21 Time 09:15 Rev Time 0.00
Received By aoliver Date 2023-07-17 Time 12:31 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-07-15 Cont ID  
Sent By hmoser Date 2023-07-15 Time 09:14 Rev Time 0.00
Received By hmoser Date 2023-06-26 Time 08:30 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status F Date 2023-06-12 Cont ID  
Sent By cmontell Date 2023-06-12 Time 14:23 Rev Time 0.00
Received By cmontell Date 2023-06-12 Time 14:23 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2023-07-15 Cont ID  
Sent By hmoser Date 2023-07-15 Time 09:14 Rev Time 0.00
Received By hmoser Date 2023-07-15 Time 09:09 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2023-06-12 Cont ID  
Sent By cmontell Date 2023-06-12 Time 14:22 Rev Time 0.00
Received By cmontell Date 2023-06-12 Time 14:21 Sent To  
Notes
2023-06-12 14:23:18PER FBC MECHANICAL SEC. 601.6BALANCED RETURN AIR.
 OFFICE 1507 & 1509 RETURN AIR TO SMALL
  
 CHRIS MONTELLO
 561-805-6733

Review Stop P PLUMBING
Rev No 1 Status P Date 2023-05-26 Cont ID  
Sent By ccole Date 2023-05-25 Time 11:45 Rev Time 0.00
Received By ccole Date 2023-05-24 Time 17:28 Sent To  
Notes
2023-05-26 10:07:27 
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-07-21 Cont ID  
Sent By lbond Date 2023-07-21 Time 08:07 Rev Time 0.00
Received By lbond Date 2023-07-21 Time 08:06 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-06-28 Cont ID  
Sent By lbond Date 2023-06-28 Time 08:36 Rev Time 0.00
Received By lbond Date 2023-06-28 Time 08:36 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2023-06-12 Cont ID  
Sent By lbond Date 2023-06-12 Time 11:31 Rev Time 0.00
Received By lbond Date 2023-06-12 Time 11:31 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved