Plan Review Details - Permit 23031989
Plan Review Stops For Permit 23031989
Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-04-07 Cont ID  
Sent By aoliver Date 2023-04-07 Time 11:12 Rev Time 0.00
Received By aoliver Date 2023-04-05 Time 16:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-04-05 Cont ID  
Sent By lmarchan Date 2023-04-05 Time 13:36 Rev Time 0.00
Received By lmarchan Date 2023-04-03 Time 14:22 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2023-04-06 Cont ID  
Sent By rwbrown Date 2023-04-06 Time 08:28 Rev Time 0.00
Received By rwbrown Date 2023-04-06 Time 08:28 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2023-04-04 Cont ID  
Sent By rwbrown Date 2023-04-04 Time 07:50 Rev Time 0.00
Received By rwbrown Date 2023-04-04 Time 07:27 Sent To  
Notes
2023-04-04 07:50:351ST PLUMBING REVIEW
  
 THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED
 BY RYAN BROWN WITH THE FOLLOWING COMMENTS.
  
 1. 2017 WPB AMEND - 107.3.5 - PLEASE PROVIDE SPEC SHEET
 FOR THE BACKFLOW DEVICE TO BE INSTALLED. IT NEEDS TO
 INDICATE IT IS LEAD FREE AND USC APPROVED. BE SURE TO
 HIGHLIGHT THE MAKE, MODEL, AND SIZE OF THE DEVICE.
  
 2. 2017 WPB AMEND - 107.3.5 -THE SITE PLAN IS
 UNREADABLE.
  
 3. 2017 WPB AMEND 105.1 - THE TEST REPORT TO CERTIFY A
 BACKFLOW IS NOT REQUIRED FOR PLAN REVIEW. THE BACKFLOW
 CANNOT BE TESTED BEFORE THE PERMIT IS ISSUED. A PERMIT
 IS REQUIRED TO INSTALL THE BACKFLOW. IF AN EMERGENCY
 REPAIR IS NEEDED, PER 105.2.1 YOU CAN CONTACT THE
 BUILDING DEPARTMENT AT [email protected] AND COPY ME AT
 [email protected] AND NOTIFY US OF THE EMERGENCY REPAIR
 BEFORE THE WORK BEGINS. THEN, WITHIN 24 HOURS OR ONE
 BUSINESS DAY, YOU NEED TO SUBMIT THE APPLICATION FOR
 THE WORK PERFORMED.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
  
 RYAN W. BROWN
 CHIEF PLUMBING INSPECTOR
 OFFICE: 561-805-6692
 CELL: 561-517-4293
 EMAIL: [email protected]
  
  
 V7 FPC - 2020 FLORIDA PLUMBING CODE
 V7 FGC - 2020 FLORIDA FUEL GAS
 V7 FRC - 2020 FLORIDA RESIDENTIAL BUILDING CODE
 V7 FAC - 2020 FLORIDA ACCESSIBILITY CODE
 V7 FEX - 2020 FLORIDA EXISTING BUILDING CODE
 V7 FEC - 2020 FLORIDA ENERGY CONSERVATION
 2021 F.S. - 2021 FLORIDA STATUTES
 2021 F.A.C. - 2021 FLORIDA ADMINISTRATIVE CODE
 2017 WPB AMEND - 2017 WEST PALM BEACH AMENDMENTS TO THE
 FBC CHAPTER 1
  
  

Review Stop PU PUBLIC UTILITIES
Rev No 2 Status P Date 2023-04-07 Cont ID  
Sent By aoliver Date 2023-04-07 Time 11:12 Rev Time 0.00
Received By aoliver Date 2023-04-07 Time 11:12 Sent To  
Notes
2023-04-07 11:12:31APPROVED BY RONALD JENKINS

Review Stop PU PUBLIC UTILITIES
Rev No 1 Status F Date 2023-04-05 Cont ID  
Sent By lmarchan Date 2023-04-05 Time 13:36 Rev Time 0.00
Received By lmarchan Date 2023-04-05 Time 13:36 Sent To  
Notes
2023-04-05 13:36:23PER DGRIFFITHS - BACKFLOW SPEC SHEET IS NEEDED FOR
 APPROVAL