Plan Review Details - Permit 23030237
Plan Review Stops For Permit 23030237
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-04-04 Cont ID  
Sent By lbond Date 2023-04-04 Time 10:04 Rev Time 0.00
Received By lbond Date 2023-04-04 Time 10:03 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-03-27 Cont ID  
Sent By lbond Date 2023-03-27 Time 11:42 Rev Time 0.00
Received By lbond Date 2023-03-27 Time 11:42 Sent To  
Notes
2023-03-27 11:43:01PLEASE COMPLY TO ELECTRICAL COMMENTS FIRST AND
 RESUBMIT.
 THANK YOU
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-04-12 Cont ID  
Sent By jleahy Date 2023-04-12 Time 14:31 Rev Time 0.00
Received By jleahy Date 2023-04-10 Time 13:24 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2023-03-22 Cont ID  
Sent By jleahy Date 2023-03-22 Time 10:09 Rev Time 0.00
Received By jleahy Date 2023-03-22 Time 09:57 Sent To  
Notes
2023-03-22 11:37:06FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 RISER DIAGRAM SEEMS INCOMPLETE PLEASE SUBMIT AN
 EXISTING RISER DIAGRAM AND A NEW RISER DIAGRAM.
  
 TESLA BACKUP GATEWAY DOES IT HAVE BREAKERS INSIDE TO
 REDUCE OVERCURRENT PROTECTION TO THE 200A PANEL, AND
 150 TO SOLAR DISCONNECT WITH 1/0S?
  
 GATEWAY IS RATED FOR 200A YOU NEED 200A WIRE. 3/0
  
 PANEL A DOES NOT SEEM TO BE THE ONLY PANEL SO 2/0
 CONDUCTORS WILL NEED TO BE REPLACED WITH 3/0S.
  
 200A BREAKER OFF THE BUSS PLEASE SUBMIT THE BUSS
 CALCULATION.
  
 PLEASE SUBMIT A COST BREAKDOWN TFOR THE ENTIRE SYSTEM
 WITH ALL MATERIALS AND LABOR.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-04-12 Cont ID  
Sent By jleahy Date 2023-04-12 Time 14:32 Rev Time 0.00
Received By jleahy Date 2023-04-03 Time 09:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-03-27 Cont ID  
Sent By lbond Date 2023-03-27 Time 11:43 Rev Time 0.00
Received By lbond Date 2023-03-13 Time 10:46 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-04-04 Cont ID  
Sent By lbond Date 2023-04-04 Time 10:32 Rev Time 0.00
Received By lbond Date 2023-04-04 Time 10:32 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2023-03-22 Cont ID  
Sent By jleahy Date 2023-03-22 Time 12:07 Rev Time 0.00
Received By jleahy Date 2023-03-22 Time 12:07 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2023-03-21 Cont ID  
Sent By VBroglia Date 2023-03-21 Time 14:20 Rev Time 0.00
Received By vbroglia Date 2023-03-21 Time 14:20 Sent To  
Notes
***NONE***