Plan Review Stops For Permit 23021372 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2023-05-04 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-05-04 |
Time |
08:11 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-05-04 |
Time |
08:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2023-04-17 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-04-17 |
Time |
13:59 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-04-17 |
Time |
13:59 |
Sent To |
|
|
Notes |
2023-04-17 14:12:11 | CONCRETE RESTORATION | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | AMENDMENT | | | | CORRECTIONS NEEDED - | | | | 1) NONE OF THE SIGNED AND SEALED DRAWINGS SHOW AS | | DIGITALLY SIGNED IN ADOBE READER - SIGNED AND SEALED | | DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | SPECIFIC TYPE OF E-SIGNATURE). | | | | 2) PLEASE PROVIDE THE FOLLOWING STATEMENT ON THE | | DRAWINGS - ANY REPAIRS TO THRESHOLD BUILDINGS ARE | | REQUIRED TO COMPLY WITH FS 553.79. THRESHOLD BLDG. | | REQUIRED STATEMENT: W.P.B. AMENDMENT 110.8.4.4 ALL | | PLANS FOR THE BUILDING WHICH ARE REQUIRED TO BE SIGNED | | AND SEALED BY THE ARCHITECT OR ENGINEER OF RECORD | | CONTAIN A STATEMENT THAT, TO THE BEST OF THE | | ARCHITECT'S OR ENGINEER'S KNOWLEDGE, THE PLANS AND | | SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM | | BUILDING CODES AND THE APPLICABLE FIRE-SAFETY STANDARDS | | AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH | | THIS SECTION AND CHAPTER 633 FLORIDA STATUTES. | | | | 3) PLEASE PROVIDE A THRESHOLD INSPECTION PLAN - FBC | | (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION PLAN. THE | | ENFORCING AGENCY SHALL REQUIRE A SPECIAL INSPECTOR TO | | PERFORM STRUCTURAL INSPECTIONS ON A THRESHOLD BUILDING | | PURSUANT TO A STRUCTURAL INSPECTION PLAN PREPARED BY | | THE ENGINEER OF RECORD. THE STRUCTURAL INSPECTION PLAN | | MUST BE SUBMITTED TO THE ENFORCING AGENCY PRIOR TO THE | | ISSUANCE OF A BUILDING PERMIT FOR THE CONSTRUCTION OF A | | THRESHOLD BUILDING. THE PURPOSE OF THE STRUCTURAL | | INSPECTION PLAN IS TO PROVIDE SPECIFIC INSPECTION | | PROCEDURES AND SCHEDULES SO THAT THE BUILDING CAN BE | | ADEQUATELY INSPECTED FOR COMPLIANCE WITH THE PERMITTED | | DOCUMENTS. | | | | | | | | |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2023-03-24 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-03-24 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-03-24 |
Time |
13:32 |
Sent To |
|
|
Notes |
2023-03-24 13:41:08 | CONCRETE RESTORATION | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | AMENDMENT | | | | CORRECTIONS NEEDED - | | | | 1) DRAWINGS NEED TO BE SIGNED AND SEALED BY THE | | DESIGNER FBC WPB 107.1 - SIGNED AND SEALED DRAWINGS IN | | PROJECTDOX NEED TO BE DIGITALLY/ELECTRONICALLY SIGNED | | TO BE USED IN ELECTRONIC PLAN REVIEW. (A | | CERTIFICATE-BASED DIGITAL SIGNATURE (OFTEN JUST CALLED | | A DIGITAL SIGNATURE) IS A SPECIFIC TYPE OF | | E-SIGNATURE). | | | | 2) ANY REPAIRS TO THRESHOLD BUILDINGS ARE REQUIRED TO | | COMPLY WITH FS 553.79. THRESHOLD BLDG. REQUIRED | | STATEMENT: W.P.B. AMENDMENT 110.8.4.4 ALL PLANS FOR THE | | BUILDING WHICH ARE REQUIRED TO BE SIGNED AND SEALED BY | | THE ARCHITECT OR ENGINEER OF RECORD CONTAIN A STATEMENT | | THAT, TO THE BEST OF THE ARCHITECT'S OR ENGINEER'S | | KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE | | APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE | | FIRE-SAFETY STANDARDS AS DETERMINED BY THE LOCAL | | AUTHORITY IN ACCORDANCE WITH THIS SECTION AND CHAPTER | | 633 FLORIDA STATUTES. | | | | 3) FBC (CITY AMENDMENTS)110.8.1 THRESHOLD INSPECTION | | PLAN. THE ENFORCING AGENCY SHALL REQUIRE A SPECIAL | | INSPECTOR TO PERFORM STRUCTURAL INSPECTIONS ON A | | THRESHOLD BUILDING PURSUANT TO A STRUCTURAL INSPECTION | | PLAN PREPARED BY THE ENGINEER OF RECORD. THE STRUCTURAL | | INSPECTION PLAN MUST BE SUBMITTED TO THE ENFORCING | | AGENCY PRIOR TO THE ISSUANCE OF A BUILDING PERMIT FOR | | THE CONSTRUCTION OF A THRESHOLD BUILDING. THE PURPOSE | | OF THE STRUCTURAL INSPECTION PLAN IS TO PROVIDE | | SPECIFIC INSPECTION PROCEDURES AND SCHEDULES SO THAT | | THE BUILDING CAN BE ADEQUATELY INSPECTED FOR COMPLIANCE | | WITH THE PERMITTED DOCUMENTS. | | | | 4) THRESHOLD INSPECTOR: WPB AMENDMENT 110.8.1 W.P.B. | | CONSTRUCTION SERVICES DEPARTMENT REQUEST FOR THRESHOLD | | BUILDINGS A SPECIAL INSPECTOR AS REQUIRED BY 553.79(5) | | FLORIDA STATUTES TO THE MINIMUM INSPECTIONS REQUIRED BY | | THIS CODE. THE THRESHOLD INSPECTION FORMS ARE REQUIRED | | TO BE FILED OUT BY ALL PARTIES WITH INTEREST, NOTARIZED | | AND RETURNED TO THIS OFFICE, AND REVIEWED AND APPROVED | | BEFORE PERMIT ISSUANCE WILL TAKE PLACE. | | | | 5) PLEASE READ AND FILL OUT THE REQUIRED DOCUMENTS PER | | THE "GUIDELINES AND POLICIES FOR PROJECTS CONCERNING | | THRESHOLD/SPECIAL INSPECTORS AND RESIDENT INSPECTORS". | | YOU CAN E MAIL ME AND ASK FOR A COPY. |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2023-05-03 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2023-05-03 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2023-05-03 |
Time |
11:46 |
Sent To |
|
|
Notes |
2023-05-03 11:46:51 | FIRE COMMENT: | | | | ENSURE FIRE & LIFE SAFETY IS MAINTAINED IN ACCORDANCE | | WITH NFPA 241 | | AND OCCUPANTS/TENANTS, STAFF, VISITORS EXITS, EXIT | | PATHS, & EXIT DISCHARGES | | ARE PROTECTED FROM DEBRIS & CONSTRUCTION | | MATERIALS/HAZARDS. | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2023-04-13 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2023-04-13 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2023-04-13 |
Time |
11:06 |
Sent To |
|
|
Notes |
2023-04-13 11:06:57 | FIRE COMMENT: | | | | ENSURE FIRE & LIFE SAFETY IS MAINTAINED IN ACCORDANCE | | WITH NFPA 241 | | AND OCCUPANTS/TENANTS, STAFF, VISITORS EXITS, EXIT | | PATHS, & EXIT DISCHARGES | | ARE PROTECTED FROM DEBRIS & CONSTRUCTION | | MATERIALS/HAZARDS. | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2023-02-28 |
|
|
Cont ID |
|
Sent By |
pleduc |
Date |
2023-02-28 |
Time |
|
Rev Time |
0.00 |
Received By |
pleduc |
Date |
2023-02-28 |
Time |
12:14 |
Sent To |
|
|
Notes |
2023-02-28 12:24:06 | FIRE COMMENT: | | | | ENSURE FIRE & LIFE SAFETY IS MAINTAINED IN ACCORDANCE | | WITH NFPA 241 | | AND OCCUPANTS/TENANTS, STAFF, VISITORS EXITS, EXIT | | PATHS, & EXIT DISCHARGES | | ARE PROTECTED FROM DEBRIS & CONSTRUCTION | | MATERIALS/HAZARDS. | | | | PETER LEDUC | | FIRE MARSHAL | | 561-804-4709 | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2023-05-04 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-05-04 |
Time |
08:12 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-05-02 |
Time |
18:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2023-04-17 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-04-17 |
Time |
14:15 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-04-12 |
Time |
11:04 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2023-03-24 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-03-24 |
Time |
13:43 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-02-27 |
Time |
09:19 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2023-05-04 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-05-04 |
Time |
08:11 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-05-04 |
Time |
08:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2023-04-17 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-04-17 |
Time |
14:13 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-04-17 |
Time |
14:13 |
Sent To |
|
|
Notes |
2023-04-17 14:14:07 | SIGNATURE REVIEW | | | | CORRECTIONS NEEDED - | | | | 1) NONE OF THE SIGNED AND SEALED DRAWINGS SHOW AS | | DIGITALLY SIGNED IN ADOBE READER - SIGNED AND SEALED | | DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | SPECIFIC TYPE OF E-SIGNATURE). |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2023-03-24 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-03-24 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-03-24 |
Time |
13:41 |
Sent To |
|
|
Notes |
2023-03-24 13:43:35 | SIGNATURE REVIEW | | | | CORRECTIONS NEEDED - | | | | 1) SIGNED AND SEALED DRAWINGS NEED TO BE DIGITALLY | | SIGNED - | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | SPECIFIC TYPE OF E-SIGNATURE). | | |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
2 |
Status |
P |
Date |
2023-05-04 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-05-04 |
Time |
08:12 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-05-04 |
Time |
08:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
THRESHOLD |
THRESHOLD INSPECTOR DOCUMENTS |
Rev No |
1 |
Status |
F |
Date |
2023-04-17 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-04-17 |
Time |
14:14 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-04-17 |
Time |
14:14 |
Sent To |
|
|
Notes |
2023-04-17 14:15:09 | SEE BUILDING PLAN REVIEW |
|
|