Review Stop AD ADDRESSING
Rev No 1 Status P Date 2023-02-14 Cont ID  
Sent By cpuell Date 2023-02-14 Time 11:55 Rev Time 0.00
Received By cpuell Date 2023-02-14 Time 11:55 Sent To  
Notes
2023-02-14 11:56:25ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 3 Status P Date 2023-07-12 Cont ID  
Sent By pvalenti Date 2023-07-12 Time 07:50 Rev Time 0.00
Received By pvalenti Date 2023-07-12 Time 07:50 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status F Date 2023-04-05 Cont ID  
Sent By pvalenti Date 2023-04-05 Time 10:15 Rev Time 0.00
Received By pvalenti Date 2023-04-05 Time 09:58 Sent To  
Notes
2023-04-05 10:18:24PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 ASBESTOS REVIEW:
  
 FAILED PLAN REVIEW:
  
 AN ASBESTOS ACKNOWLEDGEMENT LETTER IS REQUIRED. A
 MITIGATION REPORT IS NOT REQUIRED
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC
 ES/ENVIRONMENTAL-HEALTH/AIR-
 QUALITY/ASBESTOS-DEMOLITION-RENOVATION.HTML

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2023-02-24 Cont ID  
Sent By pvalenti Date 2023-02-24 Time 13:33 Rev Time 0.00
Received By pvalenti Date 2023-02-24 Time 13:31 Sent To  
Notes
2023-02-24 13:34:27PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 ASBESTOS REVIEW:
  
 FAILED PLAN REVIEW:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
  
 HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC
 ES/ENVIRONMENTAL-HEALTH/AIR-
 QUALITY/ASBESTOS-DEMOLITION-RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2023-07-28 Cont ID  
Sent By pvalenti Date 2023-07-28 Time 11:06 Rev Time 0.00
Received By pvalenti Date 2023-07-27 Time 09:24 Sent To  
Notes
2023-07-28 11:06:36PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 A SEWER LATERAL CAPPING PERMIT NEEDS TO BE CLOSED OUT
 PRIOR TO APPROVAL OF DEMO PERMIT.
 PLEASE INFORM ME WHEN THE PLUMBING FINAL FIELD
 INSPECTION (#703) FOR THE SEWER LATERAL CAPPING HAS
 BEEN APPROVED AND I WILL ADJUST THE DEMO PERMIT
 BUILDING REVIEW STATUS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2023-07-12 Cont ID  
Sent By pvalenti Date 2023-07-12 Time 07:50 Rev Time 0.00
Received By pvalenti Date 2023-07-12 Time 07:50 Sent To  
Notes
2023-07-12 07:51:08PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
 A SEPARATE PLUMBING PERMIT (TURN AROUND PERMIT) AND A
 FINAL FIELD INSPECTION OF THE CAPPING ARE REQUIRED FOR
 THE SEWER LATERAL CAPPING. THIS NEEDS TO BE COMPLETED
 PRIOR TO DEMO PERMIT ISSUANCE.
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-04-05 Cont ID  
Sent By pvalenti Date 2023-04-05 Time 10:18 Rev Time 0.00
Received By pvalenti Date 2023-04-05 Time 09:58 Sent To  
Notes
2023-04-05 10:18:49PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC).
 SEE ELECTRIC REVIEW.
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY???S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
 6. COMPLETE THE DEMO DEBRIS FORM: HTTP://WPB.ORG/DEPART
 MENTS/DEVELOPMENT-SERVICES/FORMS/BUILDING-PERMIT-FORMS
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING
 ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-02-24 Cont ID  
Sent By pvalenti Date 2023-02-24 Time 13:35 Rev Time 0.00
Received By pvalenti Date 2023-02-24 Time 13:31 Sent To  
Notes
2023-02-24 13:37:12PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC).
 SEE ELECTRIC REVIEW.
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY???S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT
 DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED
 FOR RODENTS.
 6. COMPLETE THE DEMO DEBRIS FORM: HTTP://WPB.ORG/DEPART
 MENTS/DEVELOPMENT-SERVICES/FORMS/BUILDING-PERMIT-FORMS
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING
 ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  
  

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2023-07-25 Cont ID  
Sent By jleahy Date 2023-07-25 Time 08:59 Rev Time 0.00
Received By jleahy Date 2023-07-25 Time 08:59 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2023-07-10 Cont ID  
Sent By mpeterso Date 2023-07-10 Time 08:11 Rev Time 0.00
Received By mpeterso Date 2023-07-10 Time 08:11 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2023-04-05 Cont ID  
Sent By mpeterso Date 2023-04-05 Time 11:19 Rev Time 0.00
Received By mpeterso Date 2023-04-05 Time 11:19 Sent To  
Notes
2023-04-05 11:20:13SEE PREVIOUS COMMENT

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2023-02-24 Cont ID  
Sent By mpeterso Date 2023-02-24 Time 15:51 Rev Time 0.00
Received By mpeterso Date 2023-02-24 Time 15:51 Sent To  
Notes
2023-02-24 15:52:162/24/23 SENT EMAIL REQUESTING ELECTRICAL APPLICATION.
 MP
  
 WEST PALM BEACH PLAN REVIEW NEEDS AN ELECTRICAL PERMIT
 APPLICATION FOR APPROVAL. THIS IS A BUILDING DEPARTMENT
 POLICY TO ENSURE ELECTRICAL SAFETY DURING DEMOLITION.
 PLEASE EMAIL THE ELECTRICAL PERMIT APPLICATION FROM A
 LICENSED ELECTRICAL CONTRACTOR TO [email protected],
 [email protected], AND [email protected] . WHEN WE
 RECEIVE THE APPLICATION THE ELECTRICAL REVIEWERS WILL
 APPROVE THE PLAN REVIEW.
  
 MICHAEL PETERSON
 ELECTRICAL PLANS EXAMINER
 [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 4 Status P Date 2023-07-24 Cont ID  
Sent By sberglun Date 2023-07-24 Time 10:57 Rev Time 0.00
Received By sberglun Date 2023-07-24 Time 10:57 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 3 Status F Date 2023-07-21 Cont ID  
Sent By sberglun Date 2023-07-21 Time 07:19 Rev Time 0.00
Received By sberglun Date 2023-07-21 Time 07:19 Sent To  
Notes
2023-07-21 07:19:47SEE COMMENTS UNDER 23020206

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-04-07 Cont ID  
Sent By lquinone Date 2023-04-07 Time 14:47 Rev Time 0.00
Received By lquinone Date 2023-04-07 Time 14:47 Sent To  
Notes
2023-04-07 14:48:18REPEATED COMMENT:
  
 PASSED WITH PROVISO:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DONT
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE WHERE CAN I FIND MY PLAN REVIEW
 COMMENTS ONLINE? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 LINDA M. QUINONES-CINTRON, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT (561) 494-1085
 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2023-02-13 Cont ID  
Sent By rrossano Date 2023-02-13 Time   Rev Time  
Received By rrossano Date 2023-02-13 Time   Sent To  
Notes
2023-02-13 11:13:00PASSED WITH PROVISOS:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. - STORMWATER POLLUTION PREVENTION
 PLAN, AND UTILITY SIGNOFFS - WATER/SEWER, PEST, FPL,
 FPU, ASBESTOS ETC.
  
 TO RESUBMIT, YOU MUST FIRST WAIT TILL ALL THE PLAN
 REVIEWS ARE COMPLETE. EVEN IF YOU FAILED ONE TRADE AND
 WANT TO ADDRESS THE COMMENTS IMMEDIATELY, YOU MUST WAIT
 FOR ALL OTHER TRADES TO REVIEW YOUR PLAN. RESUBMITTING
 BEFORE PLAN REVIEW IS COMPLETE WILL DELAY YOUR PLAN
 REVIEW TIME.
  
 ONCE ALL PLAN REVIEWS ARE COMPLETE, IF YOU DON???T
 UNDERSTAND THE FAILED PLAN REVIEW COMMENTS, AS A BEST
 PRACTICE YOU SHOULD CALL OR EMAIL YOUR PLAN REVIEWER TO
 DISCUSS. EVERY PLAN REVIEWER INCLUDES THEIR NAME, PHONE
 AND EMAIL ADDRESS IN THE COMMENTS. TO VIEW YOUR PLAN
 REVIEW COMMENTS ONLINE, GO TO THE DEVELOPMENT SERVICES
 WEBSITE AT HTTPS://WWW.WPB.ORG/GOVERNMENT/DEVELOPMENT-S
 ERVICES/PERMITS AND SEE ???WHERE CAN I FIND MY PLAN
 REVIEW COMMENTS ONLINE???? FOR INSTRUCTIONS.
  
 FOR QUESTIONS ABOUT HOW TO RESUBMIT, SEE INFO ON
 WEBSITE OR EMAIL [email protected] AND A BUILDING DIVISION
 TEAM MEMBER WILL HELP YOU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES
 DEPT., 561-494-1098, FAX: 561-494-1116 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2023-04-12 Cont ID  
Sent By fmittner Date 2023-04-12 Time 15:23 Rev Time 0.00
Received By fmittner Date 2023-04-12 Time 15:23 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2023-02-23 Cont ID  
Sent By amhamilt Date 2023-02-23 Time 10:17 Rev Time 0.00
Received By amhamilt Date 2023-02-23 Time 10:17 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2023-07-28 Cont ID  
Sent By pvalenti Date 2023-07-28 Time 11:26 Rev Time 0.00
Received By pvalenti Date 2023-07-21 Time 16:09 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-07-21 Cont ID  
Sent By aoliver Date 2023-07-21 Time 09:59 Rev Time 0.00
Received By aoliver Date 2023-07-07 Time 08:26 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-05-03 Cont ID  
Sent By aoliver Date 2023-05-03 Time 09:56 Rev Time 0.00
Received By aoliver Date 2023-03-29 Time 14:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-02-28 Cont ID  
Sent By lmarchan Date 2023-02-28 Time 07:58 Rev Time 0.00
Received By lmarchan Date 2023-02-09 Time 11:57 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2023-07-28 Cont ID  
Sent By pvalenti Date 2023-07-28 Time 11:12 Rev Time 0.00
Received By pvalenti Date 2023-07-28 Time 11:12 Sent To  
Notes
2023-07-28 11:26:34SIGNATURE REVIEW DENIED:
  
 THE SUBMITTED SITE PLAN (SHEET C-100) 3RD VERSION DOES
 NOT HAVE 3RD PARTY VERIFIABLE DESIGN PROFESSIONAL
 SIGNATURE.
  
  
 FS 471/FS 481 DOCUMENTS PREPARED BY AN
 ENGINEER/ARCHITECT AND SUBMITTED FOR PUBLIC RECORD ARE
 TO BE SIGNED, SEALED & DATED ORIGINALS. A SCAN OF A
 SIGNED/SEALED PLAN IS NOT CONSIDERED AN ORIGINAL.
 UPLOAD OR EMAIL A DIGITALLY SIGNED (THIRD PARTY
 VERIFIED) PLAN:
  
 PETER E VALENTI
 BUILDING PLANS EXAMINER II
 BUILDING DIVISION
 CITY OF WEST PALM BEACH
 401 CLEMATIS STREET, 1ST FLOOR
 WEST PALM BEACH, FL 33401
 FEEL FREE TO CONTACT ME AT 561 805 6673.

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-04-05 Cont ID  
Sent By pvalenti Date 2023-04-05 Time 09:58 Rev Time 0.00
Received By pvalenti Date 2023-04-05 Time 09:58 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2023-02-24 Cont ID  
Sent By pvalenti Date 2023-02-24 Time 13:31 Rev Time 0.00
Received By pvalenti Date 2023-02-24 Time 13:31 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 4 Status P Date 2023-07-25 Cont ID  
Sent By eschneid Date 2023-07-25 Time 08:57 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
2023-07-25 08:58:10SEE PROVISOS UNDER PERMIT NUMBER 23020205.
  
  

Review Stop Z ZONING
Rev No 3 Status P Date 2023-07-18 Cont ID  
Sent By eschneid Date 2023-07-18 Time 16:57 Rev Time 0.00
Received By eschneid Date   Time   Sent To  
Notes
2023-07-18 16:57:18SEE PROVISOS UNDER PERMIT NUMBER 23020205.

Review Stop Z ZONING
Rev No 2 Status F Date 2023-05-02 Cont ID  
Sent By eschneid Date 2023-05-02 Time 17:26 Rev Time 0.00
Received By eschneid Date 2023-05-02 Time 17:26 Sent To  
Notes
2023-05-02 17:26:43FAILED
  
 1) REVISED COMMENT: PRIOR TO THE APPROVAL OF THIS
 DEMOLITION PERMIT, THE TREE ALTERATION PERMIT THAT HAS
 BEEN SUBMITTED TO THE CITY'S PLANNING DIVISION MUST BE
 APPROVED. NOTE: THE TREE DISPOSITION IS NOT REVIEWED AS
 PART OF THE DEMOLITION PERMIT.
  
 2) THIS DEMOLITION PERMIT DOES NOT PERMIT THE
 DEMOLITION OF ANYTHING OUTSIDE OF THE PROPERTY LINE
 EXCEPT FOR THE REMOVAL OF THE AERIAL WALKWAY OVER
 HIBISCUS STREET.
  
 3) ANY FEATURES OUTSIDE OF THE PROPERTY LINE SHOWN ON
 THE SURVEY/DEMOLITION PLAN, TO INCLUDE FOOTERS, LIGHT
 POLES, CURBS, ETC., WILL REQUIRE AN APPROVED
 RIGHT-OF-WAY PERMIT PRIOR TO REMOVAL. PROVIDE A COPY OF
 THE APPROVED RIGHT-OF-WAY PERMIT.
  
 4) PROVIDE A COPY OF THE PAID INVOICE FOR THE REMOVAL
 OF THE PARKING METERS ON SOUTH ROSEMARY AVENUE AND THE
 BAGGING OF THE PARKING METERS ON GARDENIA STREET.
  
 5) PRIOR TO THE APPROVAL OF THIS DEMOLITION PERMIT, THE
 DEMOLITION MINOR PLANNED DEVELOPMENT AMENDMENT THAT HAS
 BEEN SUBMITTED TO THE CITY'S PLANNING DIVISION MUST BE
 APPROVED.
  
 CONTACT ERIC SCHNEIDER @ 561-822-1446
 [email protected]
  

Review Stop Z ZONING
Rev No 1 Status F Date 2023-02-27 Cont ID  
Sent By ESchneid Date 2023-02-27 Time 16:22 Rev Time 0.00
Received By eschneid Date 2023-02-27 Time 16:22 Sent To  
Notes
2023-02-27 16:22:47FAILED
  
 1) CURRENTLY, THE BUILDING MAY NOT BE DEMOLISHED UNLESS
 THE SITE PLAN FOR THE NEW BUILDING HAS BEEN APPROVED BY
 THE CITY COMMISSION. AN AMENDMENT TO ALLOW DEMOLITION
 WITHOUT AN APPROVED SITE PLAN HAS BEEN SUBMITTED TO THE
 PLANNING DIVISION. UNTIL EITHER A SITE PLAN FOR THE
 PROPERTY IS APPROVED OR THE AMENDMENT TO PERMIT
 DEMOLITION WITHOUT A SITE PLAN ARE APPROVED, ZONING
 APPROVAL OF THIS PERMIT WILL NOT BE GRANTED.
  
 2) PROVIDE A SURVEY THAT SHOWING THE PROPERTY LINE. THE
 PROPERTY LINE ON THE SITE PLAN MUST MATCH THE SURVEY.
  
 3) ANY FEATURES OUTSIDE OF THE PROPERTY LINE SHOWN ON
 THE SURVEY, TO INCLUDE FOOTERS, LIGHT POLES, ETC., WILL
 REQUIRE AN APPROVED RIGHT-OF-WAY PERMIT PRIOR TO
 REMOVAL. PROVIDE A COPY OF THE APPROVED RIGHT-OF-WAY
 PERMIT.
  
 4) THE PLANS SHOW THE RELOCATION OF THE EXISTING
 BRIGHTBIKE STATION LOCATION. YOU MUST PROVIDE THE
 AGREEMENT FROM BRIGHTBIKE THAT THEY ARE PERMITTING THE
 REMOVAL OF THE BICYCLE STATION FROM THIS LOCATION.
 ADDITIONALLY, YOU MUST PROVIDE A LOCATION APPROVED BY
 THE CITY'S PLANNING DIVISION FOR THE STATION'S
 RELOCATION.
  
 5) PRIOR TO THE APPROVAL OF THIS DEMOLITION PERMIT, A
 TREE ALTERATION PERMIT SHOWING THE DISPOSITION OF ALL
 TREES CURRENTLY ON AND ADJACENT TO THE SITE MUST BE
 SUBMITTED TO AND APPROVED BY THE CITY'S PLANNING
 DIVISION. THE TREE DISPOSITION IS NOT REVIEWED AS PART
 OF THE DEMOLITION PERMIT.
  
 6) PROVIDE A COPY OF THE PAID INVOICE FOR THE REMOVAL
 OF THE PARKING METERS ON SOUTH ROSEMARY AVENUE AND THE
 BAGGING OF THE PARKING METERS ON HIBISCUS STREET.
  
 7) THE TEMPORARY CONSTRUCTION FENCE REQUIRES A SEPARATE
 PERMIT WITH PLANS.
  
 CONTACT ERIC SCHNEIDER @ 561-822-1446
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved