Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-03-27 Cont ID  
Sent By rrossano Date 2023-03-27 Time   Rev Time 0.00
Received By rrossano Date 2023-03-27 Time   Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2023-02-06 Cont ID  
Sent By rrossano Date 2023-02-06 Time   Rev Time 0.00
Received By rrossano Date 2023-02-06 Time   Sent To  
Notes
2023-02-06 12:06:301) THE PARK PLACE DRIVEWAY NEEDED SEVERAL
 VARIANCES/WAIVERS TO BE ESTABLISHED; IF THE ONE ON
 PARKER AVE IS MAINTAINED, THEN THE ONE ON PARK PL
 SHOULD NOT BE IMPLEMENTED, NOR ANY MODIFICATIONS TO THE
 EXISTING CURB AND SIDEWALK AREA ALLOWED
 A. LATEST DRAWING SHOWS SEVERAL CALL OUTS ON PARK PL
 (I.E. CONC. DRIVEWAY APRON, EXISTING SIGN TO BE
 RELOCATED, NEW 6??? CURB, EXISTING TREES AROUND UTILITY
 POLE TO BE REMOVED), WHICH NEEDS TO BE UPDATED/REVISED
 ACCORDINGLY
 2) THERE IS A CALLOUT ON PARKER ???NO CONCRETE ADD OR
 REMOVED???, BUT THERE ARE OTHERS SAYING EXPAND/CLOSE
 OFF OF EXISTING DRIVE. THEY SEEM MUTUALLY EXCLUSIVE,
 CLARIFICATIONS OR CORRECTIONS ARE NEEDED
  
 THANK YOU,
  
 VALERIO ORICCHIO, PE, PTOE
 CITY TRANSPORTATION ENGINEER
 [email protected]
  
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2023-02-17 Cont ID  
Sent By amhamilt Date 2023-02-17 Time 15:26 Rev Time 0.00
Received By vbroglia Date 2023-02-17 Time 15:26 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-04-04 Cont ID  
Sent By jgomez Date 2023-04-04 Time 15:58 Rev Time 0.00
Received By jgomez Date 2023-03-26 Time 07:44 Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-02-21 Cont ID  
Sent By jleahy Date 2023-02-21 Time 16:24 Rev Time 0.00
Received By jleahy Date 2023-02-02 Time 14:23 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-04-04 Cont ID  
Sent By jgomez Date 2023-04-04 Time 15:58 Rev Time 0.00
Received By jgomez Date 2023-04-04 Time 15:58 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-02-21 Cont ID  
Sent By jleahy Date 2023-02-21 Time 16:24 Rev Time 0.00
Received By jleahy Date 2023-02-21 Time 16:24 Sent To  
Notes
2023-02-21 16:25:18CODES IN EFFECT:
  
 FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
  
  
 PLAN IS REQUIRED TO BE SIGNED AND SEALED BY THE DESIGN
 PROFESSIONAL RESPONSIBLE FOR THE DESIGN. FBC 107.2.1,
 FS 471, 481

Review Stop Z ZONING
Rev No 2 Status P Date 2023-04-03 Cont ID  
Sent By vbroglia Date 2023-04-03 Time 12:59 Rev Time 0.00
Received By vbroglia Date 2023-04-03 Time 12:59 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2023-02-17 Cont ID  
Sent By vbroglia Date 2023-02-17 Time 15:24 Rev Time 0.00
Received By vbroglia Date 2023-02-17 Time 15:24 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved