|
 |
 |
 |
 |
 |
Plan Review Details - Permit 22121329
Plan Review Stops For Permit 22121329 |
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2023-02-21 |
|
|
Cont ID |
|
Sent By |
samisial |
Date |
2023-02-21 |
Time |
09:55 |
Rev Time |
0.00 |
Received By |
samisial |
Date |
2023-02-09 |
Time |
16:58 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2023-01-25 |
|
|
Cont ID |
|
Sent By |
samisial |
Date |
2023-01-25 |
Time |
16:15 |
Rev Time |
0.00 |
Received By |
samisial |
Date |
2023-01-18 |
Time |
08:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
L |
LANDSCAPING |
Rev No |
2 |
Status |
F |
Date |
2023-02-21 |
|
|
Cont ID |
|
Sent By |
samisial |
Date |
2023-02-21 |
Time |
09:45 |
Rev Time |
0.00 |
Received By |
samisial |
Date |
2023-02-21 |
Time |
09:45 |
Sent To |
|
|
Notes |
2023-02-21 09:55:04 | OPEN SPACE IS THE TOTAL SQUARE FOOTAGE MINUS THE | | BUILDING. IT DOES NOT INCLUDE DRIVEWAY AND CONCRETE | | PAD. ACCORDING TO THE INFORMATION PROVIDED, YOUR OPEN | | SPACE IS 6,182 SQ FT. 7 TREES ARE REQUIRED FOR THIS | | LOT. PLANS PROPOSE 4. PLEASE CORRECT DISCREPCANY. | | | | SMITH AMISIAL | | [email protected] |
|
|
Review Stop |
L |
LANDSCAPING |
Rev No |
1 |
Status |
F |
Date |
2023-01-25 |
|
|
Cont ID |
|
Sent By |
samisial |
Date |
2023-01-25 |
Time |
16:15 |
Rev Time |
0.00 |
Received By |
samisial |
Date |
2023-01-25 |
Time |
16:15 |
Sent To |
|
|
Notes |
2023-01-25 16:19:04 | 1) PER SEC 94-442 (C)2.A. ONE SHADE OR FLOWERING TREE | | IS REQUIRED FOR EACH 1,000 SQ FT OF OPEN SPACE OR | | PORTION THEREOF AND ONE SHRUB IS REQUIRED FOR EACH 500 | | SQ FT OF OPEN SPACE OR PORTION THEREOF. | | OPEN SPACE IS DETERMINED BY SUBTRACTING THE BUILDING | | FOOTPRINT FROM THE GROSS LOT SQ FOOTAGE (ALL | | NON-BUILDING AREA). PLEASE PROVIDE OPEN SPACE | | CALCULATIONS TO DETERMINE REQUIRED NUMBER OF TREES AND | | SHRUBS FOR THIS LOT | | | | 2) PER SEC 94-442(G) LANDSCAPE PLAN MUST SATISFY A | | MINIMUM TOTAL OF 25 POINTS FROM THE DESIGN OPTIONS | | CHART. PLEASE SHOW WHAT ITEMS FROM THE PROPOSED | | LANDSCAPE PLAN ARE MET ON THE CHART. | | | | SMITH AMISIAL | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
N |
Date |
2023-02-21 |
|
|
Cont ID |
|
Sent By |
samisial |
Date |
2023-02-21 |
Time |
09:55 |
Rev Time |
0.00 |
Received By |
samisial |
Date |
2023-02-21 |
Time |
09:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
N |
Date |
2023-01-25 |
|
|
Cont ID |
|
Sent By |
SAmisial |
Date |
2023-01-25 |
Time |
16:15 |
Rev Time |
0.00 |
Received By |
samisial |
Date |
2023-01-25 |
Time |
16:15 |
Sent To |
|
|
Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |