Plan Review Details - Permit 22120934
Plan Review Stops For Permit 22120934
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-03-02 Cont ID  
Sent By rmcphers Date 2023-03-02 Time 09:36 Rev Time 0.00
Received By rmcphers Date 2023-03-02 Time 09:36 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-01-31 Cont ID  
Sent By rmcphers Date 2023-01-31 Time 15:12 Rev Time 0.00
Received By rmcphers Date 2023-01-31 Time 15:06 Sent To  
Notes
2023-01-31 15:10:09ACCESSIBLE PARKING SPACE
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) DRAWINGS PROVIDED NEED TO BE SIGNED AND SEALED BY
 THE DESIGNER FBC 107.1
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2023-01-03 Cont ID  
Sent By rrossano Date 2023-01-03 Time   Rev Time  
Received By rrossano Date 2023-01-03 Time   Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-03-02 Cont ID  
Sent By rmcphers Date 2023-03-02 Time 09:44 Rev Time 0.00
Received By rmcphers Date 2023-02-28 Time 16:28 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-02-28 Cont ID  
Sent By lmarchan Date 2023-02-28 Time 15:09 Rev Time 0.00
Received By lmarchan Date 2022-12-20 Time 09:16 Sent To  
Notes
***NONE***

Review Stop PW PUBLIC WORKS
Rev No 1 Status P Date 2023-02-28 Cont ID  
Sent By jbjoseph Date 2023-02-28 Time 14:46 Rev Time 0.00
Received By jbjoseph Date   Time   Sent To  
Notes
2023-02-28 14:47:36ALL THE PAVEMENT MARKING SHALL COMPLY WITH THE LATEST
 REVISION OF CITY OF WEST PALM BEACH STANDARD DETAILS
 AND MEET THE MUTCD LATEST EDITION
  
 BRUCELY A. JOSEPH
 PUBLIC WORKS PROGRAM MANAGER
 [email protected]

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-03-02 Cont ID  
Sent By rmcphers Date 2023-03-02 Time 09:44 Rev Time 0.00
Received By rmcphers Date 2023-03-02 Time 09:44 Sent To  
Notes
2023-02-28 16:28:11DIGITALLY SIGNED FILES IN SIGNATURES FOLDER

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2023-01-31 Cont ID  
Sent By rmcphers Date 2023-01-31 Time 15:12 Rev Time 0.00
Received By rmcphers Date 2023-01-31 Time 15:10 Sent To  
Notes
2023-01-31 15:12:41SIGNATURE REVIEW
  
 CORRECTIONS NEEDED -
  
 1) SIGNED AND SEALED DRAWINGS NEED TO BE DIGITALLY
 SIGNED.
  
 SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE
 DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN
 ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL
 SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A
 SPECIFIC TYPE OF E-SIGNATURE).
  

Review Stop Z ZONING
Rev No 1 Status P Date 2023-02-21 Cont ID  
Sent By jroach Date 2023-02-21 Time 14:05 Rev Time 0.00
Received By jroach Date 2023-02-21 Time 13:58 Sent To  
Notes
***NONE***