Plan Review Details - Permit 22120894
Plan Review Stops For Permit 22120894
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-04-28 Cont ID  
Sent By rmcphers Date 2023-04-28 Time 11:55 Rev Time 0.00
Received By rmcphers Date 2023-04-28 Time 11:55 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-03-13 Cont ID  
Sent By rmcphers Date 2023-03-13 Time 09:23 Rev Time 0.00
Received By rmcphers Date 2023-03-13 Time 09:23 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-01-30 Cont ID  
Sent By rmcphers Date 2023-01-30 Time 11:26 Rev Time 0.00
Received By rmcphers Date 2023-01-30 Time 11:23 Sent To  
Notes
2023-01-30 11:26:20CHILLER - ELEC ROOM
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE PROVIDE THE TIE BEAM DETAILS - FBC WPB 701
  
 2) PLEASE PROVIDE THE ROOFING SYSTEM PRODUCT APPROVALS.
 NEED TO CHOOSE A ROOFING SYSTEM IN THE PRODUCT APPROVAL
 THAT SHOWS THE REQUIRED WIND DESIGN PRESSURE - PLEASE
 CIRCLE THE ROOFING SYSTEM TO BE USED IN THE PRODUCT
 APPROVAL - IF NEEDED PLEASE PROVIDE ADDITIONAL
 ATTACHMENT DETAILS FROM AN ARCHITECT OR ENGINEER FOR
 THE ROOF ZONES 2 AND 3 WHICH MAY REQUIRE A HIGHER WIND
 PRESSURE THEN THE CHOSEN ROOFING SYSTEM - SEE NOTES ON
 THE PRODUCT APPROVAL.
  
 3) PLEASE PROVIDE A SITE PLAN WITH THE FOLLOWING
 INFORMATION - FBC WPB 107.2.5 SITE PLAN. THE
 CONSTRUCTION DOCUMENTS SUBMITTED WITH THE APPLICATION
 FOR PERMIT SHALL BE ACCOMPANIED BY A SITE PLAN SHOWING
 TO SCALE THE SIZE AND LOCATION OF NEW CONSTRUCTION AND
 EXISTING STRUCTURES ON THE SITE, DISTANCES FROM LOT
 LINES, THE ESTABLISHED STREET GRADES AND THE PROPOSED
 FINISHED GRADES, DEPICTING THE PROPOSED LOT DRAINAGE
 AND, AS APPLICABLE, FLOOD HAZARD AREAS, FLOODWAYS, AND
 DESIGN FLOOD ELEVATIONS; AND IT SHALL BE DRAWN IN
 ACCORDANCE WITH AN ACCURATE AND INCLUDED ON A BOUNDARY
 LINE SURVEY. (PLEASE PROVIDE CUT SECTIONS FOR ANY
 PROPOSED WATER RETAINING SWALES)
  
 4) PLEASE PROVIDE A SURVEY.

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-05-17 Cont ID  
Sent By aoliver Date 2023-05-17 Time 12:11 Rev Time 0.00
Received By aoliver Date 2023-04-26 Time 15:46 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-04-19 Cont ID  
Sent By aoliver Date 2023-04-19 Time 07:16 Rev Time 0.00
Received By aoliver Date 2023-03-08 Time 07:28 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-02-21 Cont ID  
Sent By rmcphers Date 2023-02-21 Time 12:03 Rev Time 0.00
Received By aoliver Date 2022-12-21 Time 05:51 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2023-05-02 Cont ID  
Sent By medwards Date 2023-05-02 Time 11:39 Rev Time 0.00
Received By medwards Date 2023-05-02 Time 11:39 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2022-12-27 Cont ID  
Sent By medwards Date 2022-12-27 Time 07:47 Rev Time 0.00
Received By medwards Date 2022-12-27 Time 07:47 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2022-12-28 Cont ID  
Sent By rwbrown Date 2022-12-28 Time 11:53 Rev Time 0.00
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status N Date 2023-03-13 Cont ID  
Sent By rmcphers Date 2023-03-13 Time 09:23 Rev Time 0.00
Received By rmcphers Date 2023-03-13 Time 09:23 Sent To  
Notes
2023-03-13 09:24:12ROOFING SYSTEM TO BE DEFERRED

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2023-01-30 Cont ID  
Sent By rmcphers Date 2023-01-30 Time 11:27 Rev Time 0.00
Received By rmcphers Date 2023-01-30 Time 11:27 Sent To  
Notes
2023-01-30 11:29:01SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-04-28 Cont ID  
Sent By rmcphers Date 2023-04-28 Time 11:56 Rev Time 0.00
Received By rmcphers Date 2023-04-28 Time 11:56 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-03-13 Cont ID  
Sent By rmcphers Date 2023-03-13 Time 09:25 Rev Time 0.00
Received By rmcphers Date 2023-03-13 Time 09:25 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-12-27 Cont ID  
Sent By medwards Date 2022-12-27 Time 07:47 Rev Time 0.00
Received By medwards Date 2022-12-27 Time 07:47 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 3 Status P Date 2023-05-17 Cont ID  
Sent By eschneid Date 2023-05-17 Time 11:56 Rev Time 0.50
Received By eschneid Date 2023-05-17 Time 11:27 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status F Date 2023-04-18 Cont ID  
Sent By eschneid Date 2023-04-18 Time 13:57 Rev Time 0.25
Received By eschneid Date 2023-04-18 Time 13:09 Sent To  
Notes
2023-04-18 13:56:44FAILED
  
 1) THE COLD WATER PIPING IS SHOWN BEING INSTALLED
 DIRECTLY UNDER THE REQUIRED TERMINAL ISLAND OAK TREE
 NORTH OF THE CHILLER ENCLOSURE. WHILE THE PIPE IS
 CALLED OUT AS AT LEAST 36 INCHES BELOW GROUND, THERE
 WOULD BE NO WAY TO MAINTAIN THE SECTION OF PIPE UNDER
 THE TREE WITHOUT REMOVING THE TREE. THE PIPE MUST BE
 INSTALLED AT AN ALTERNATIVE ROUTE AT THIS LOCATION.
  
 CONTACT ERIC SCHNEIDER @ 561-822-1446
 [email protected]

Review Stop Z ZONING
Rev No 1 Status F Date 2023-02-21 Cont ID  
Sent By eschneid Date 2023-02-21 Time 09:42 Rev Time 0.00
Received By eschneid Date 2023-02-21 Time 09:42 Sent To  
Notes
2023-02-21 09:44:12FAILED
  
 1) THE CHILLER WAS NOT SHOWN ON THE APPROVED SITE PLAN,
 BUT IS SHOWN ON THE MINOR SITE PLAN AMENDMENT THAT IS
 CURRENTLY UNDER REVIEW.
  
 2) THE MINOR SITE PLAN AMENDMENT HAS NOT PASSED REVIEW.
 THE PLANS WITH THIS PERMIT MUST MATCH THE PLANS
 ULTIMATELY APPROVED AS PART OF THE MINOR SITE PLAN
 AMENDMENT.
  
 CONTACT ERIC SCHNEIDER @ 561-822-1446
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved