Plan Review Details - Permit 22120855
Plan Review Stops For Permit 22120855
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2023-01-05 Cont ID  
Sent By cpuell Date 2023-01-05 Time 14:26 Rev Time 0.00
Received By cpuell Date 2023-01-05 Time 14:26 Sent To  
Notes
2023-01-05 14:27:03ADDRESS APPROPRIATE FOR PROJECT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-03-22 Cont ID  
Sent By pvalenti Date 2023-03-22 Time 09:22 Rev Time 0.00
Received By pvalenti Date 2023-03-22 Time 09:22 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2023-01-30 Cont ID  
Sent By pvalenti Date 2023-01-30 Time 13:39 Rev Time 0.00
Received By pvalenti Date 2023-01-30 Time 13:39 Sent To  
Notes
2023-01-30 13:39:22PETER E VALENTI
 BUILDING PLANS EXAMINER II
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION.
 PLEASE PROVIDE ELECTRIC PERMIT INFORMATION FOR THE
 REMOVAL OF POWER POLES AND SAFE DISCONNECTING OF
 ELECTRIC.
  
 3. WATERDOWN METHOD:
 SINCE A BACKFLOW PREVENTER DEVICE HAS BEEN SELECTED AS
 THE METHOD OF WATERING DOWN SITE DURING DEMOLITION,
 PLEASE INFORM ME WHEN THE PLUMBING FINAL INSPECTION
 #703 HAS BEEN APPROVED. BEFORE SCHEDULING THE #703
 PLUMBING FINAL INSPECTION, THE BACKFLOW DEVICE NEEDS TO
 BE TESTED AND CERTIFIED BY THE CITY PUBLIC UTILITIES
 DEPARTMENT, 561 822 2244. FAX THE COMPLETED "DEMOLITION
 APPLICATION" FORM TO
 561-822-2183.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703 INSPECTION AND INFORM ME
 WHEN THE PLUMBING FINAL INSPECTION #703 HAS BEEN
 APPROVED.
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2023-03-14 Cont ID  
Sent By rrossano Date 2023-03-14 Time   Rev Time 0.00
Received By rrossano Date 2023-03-14 Time   Sent To  
Notes
2023-03-14 11:46:17PASSED WITH PROVISOS:
  
 OBTAIN PERMIT FOR WORK IN ROW.
 PROVIDE UTILITY CLEARANCE DOCS AND SWPPP PER BUILDING
 DEPT.
  
 THANKS,
  
 RICK ROSSANO, SENIOR PROJECT COORD.
 WPB ENG. SERVICES DEPT., 561-494-1098, FAX:
 561-494-1116 [email protected]

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2023-03-16 Cont ID  
Sent By amhamilt Date 2023-03-16 Time 16:19 Rev Time 0.00
Received By amhamilt Date 2023-03-16 Time 16:19 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-03-22 Cont ID  
Sent By pvalenti Date 2023-03-22 Time 09:22 Rev Time 0.00
Received By pvalenti Date 2023-03-17 Time 12:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-03-16 Cont ID  
Sent By aoliver Date 2023-03-16 Time 16:40 Rev Time 0.00
Received By aoliver Date 2023-01-12 Time 09:48 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2023-01-30 Cont ID  
Sent By pvalenti Date 2023-01-30 Time 13:39 Rev Time 0.00
Received By pvalenti Date 2023-01-30 Time 13:39 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2023-01-05 Cont ID  
Sent By eschneid Date 2023-01-05 Time 18:40 Rev Time 0.00
Received By eschneid Date 2023-01-05 Time 18:40 Sent To  
Notes
***NONE***