Plan Review Stops For Permit 22120762 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2023-02-06 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-02-06 |
Time |
08:53 |
Rev Time |
0.00 |
Received By |
jbjoseph |
Date |
2023-02-28 |
Time |
14:36 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2023-01-13 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-01-13 |
Time |
12:41 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-01-13 |
Time |
12:41 |
Sent To |
|
|
Notes |
2023-01-13 12:42:24 | DUMPSTER ENCLOSURE | | REVIEWED BY ROGER MCPHERSON | | 561-805-6716 | | [email protected] | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | AMENDMENT | | | | CORRECTIONS NEEDED - | | | | 1) PLEASE PROVIDE A SITE PLAN SHOWING THE DUMPSTER | | ENCLOSURE LOCATION. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
P |
Date |
2023-05-04 |
|
|
Cont ID |
|
Sent By |
lquinone |
Date |
2023-05-04 |
Time |
10:21 |
Rev Time |
0.00 |
Received By |
lquinone |
Date |
2023-05-04 |
Time |
10:21 |
Sent To |
|
|
Notes |
2023-05-04 10:23:22 | PASSED SITE PLAN APPROVAL, | | PROJECT UNDER FORMAL ENGINEERING REVIEW. | | | | THANKS, | | LINDA M. QUINONES-CINTRON, PROJECT COORDINATOR, | | ENGINEERING SERVICES DEPARTMENT (561) 494-1085 | | [email protected] | | FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | | | | |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
F |
Date |
2023-02-06 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2023-02-06 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2023-02-06 |
Time |
|
Sent To |
|
|
Notes |
2023-02-06 10:12:26 | UNDER REVIEW FOR SITE PLAN REVISION. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2022-12-27 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-12-27 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2022-12-27 |
Time |
|
Sent To |
|
|
Notes |
2022-12-27 08:35:13 | 1. UNDER FORMAL ENGINEERING SUBMITTAL WHICH IS ON HOLD | | DUE TO PROPOSED SITE PLAN REVISIONS. | | 2. ONCE SITE PLAN REVISIONS ARE DETERMINED, SUBMITTED | | DOCUMENTS FOR DUMPSTER ENCLOSURE SHALL INDICATE | | COPLIANCE WITH CITY OF WPB STANDARD DETAIL GC-8 FOR | | DUMPSTER ENCLOSURES. | | | | THANKS, | | RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES | | DEPT., 561-494-1098, FAX: 561-494-1116 [email protected] | | FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC | | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 | | | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2023-02-06 |
|
|
Cont ID |
|
Sent By |
|
Date |
2023-02-06 |
Time |
|
Rev Time |
0.00 |
Received By |
jcclark |
Date |
2023-02-06 |
Time |
11:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2022-12-21 |
|
|
Cont ID |
|
Sent By |
|
Date |
2022-12-21 |
Time |
|
Rev Time |
0.00 |
Received By |
jcclark |
Date |
2022-12-21 |
Time |
09:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2023-05-18 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2023-05-18 |
Time |
16:01 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
2023-04-26 |
Time |
15:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2023-02-28 |
|
|
Cont ID |
|
Sent By |
lmarchan |
Date |
2023-02-28 |
Time |
15:16 |
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2023-02-03 |
Time |
10:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2023-02-02 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2023-02-02 |
Time |
13:20 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-12-21 |
Time |
05:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
PW |
PUBLIC WORKS |
Rev No |
2 |
Status |
P |
Date |
2023-02-28 |
|
|
Cont ID |
|
Sent By |
jbjoseph |
Date |
2023-02-28 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
jbjoseph |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2023-02-28 14:40:34 | PLEASE PROVIDE LEVEL OF SERVICE (LOS) ANALYSIS FOR THE | | SOLID WASTE GENERATION. | | | | PLEASE PROVIDE AN AUTOTURN PLAN. TRAVEL PATHS SHOULD | | BEGIN OUTSIDE THE SITE ILLUSTRATING THE TURN ONTO THE | | PRIMARY ENTRY ROAD/DRIVE, MANEUVERING AROUND THE SITE, | | AND COMPLETED WITH AN ILLUSTRATION DEMONSTRATING | | EXITING THE SITE.PATHS MUST ILLUSTRATE THE FULL VEHICLE | | SWEPT PATH (INCLUDING WHEEL TRACKS AND OUT-TO-OUT | | VEHICLE OVERHANG SWEEP) AND MUST INDICATE A CLEAR, | | UNOBSTRUCTED TRAVEL AROUND THE SITE WITHOUT | | IMPACT/COLLISIONS TO BUILDINGS, CURBS, LANDSCAPING, | | PARKING SPACES, VEHICLES, ETC??? | | | | SHOW APPARATUS SPECIFICATIONS. | | | | BRUCELY A. JOSEPH | | PUBLIC WORKS PROGRAM MANAGER | | [email protected] |
|
|
Review Stop |
PW |
PUBLIC WORKS |
Rev No |
1 |
Status |
F |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2023-02-02 |
Time |
|
Rev Time |
0.00 |
Received By |
|
Date |
2023-02-02 |
Time |
|
Sent To |
|
|
Notes |
2023-02-02 10:35:41 | REVIEW COMMENTS FOR THE SITE PLAN (PROJECT # Z21070025) | | RESUBMITTAL BACK IN MARCH 2022 HAS NOT BEEN ADRESSED | | YET. PLEASE SUBMIT DOCUMENTS FOR THE DUMPSTER ENCLOSURE | | (I.E. SITE PLAN, ENCLOSURE DETAIL) ONCE THE SITE PLAN | | REVISION ARE DETERMINED. | | | | MATT HEJAZI | | DEPT. OF PUBLIC WORKS | | [email protected] | | 561-822-2045 |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2023-05-18 |
|
|
Cont ID |
|
Sent By |
jleahy |
Date |
2023-05-18 |
Time |
16:01 |
Rev Time |
0.00 |
Received By |
jleahy |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
P |
Date |
2023-02-06 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-02-06 |
Time |
08:53 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-02-06 |
Time |
08:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
P |
Date |
2023-01-13 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-01-13 |
Time |
12:43 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-01-13 |
Time |
12:42 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2023-05-17 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2023-05-17 |
Time |
12:19 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2023-05-17 |
Time |
12:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2023-04-18 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2023-04-18 |
Time |
12:45 |
Rev Time |
0.25 |
Received By |
eschneid |
Date |
2023-04-18 |
Time |
12:45 |
Sent To |
|
|
Notes |
2023-04-18 12:54:32 | FAILED | | | | 1) THE CITY REQUIRES DUMPSTER ENCLOSURES TO HAVE A | | CLEAR OPENING WIDTH OF AT LEAST 13 FEET. THE DUMPSTER | | ENCLOSURE FLOOR PLAN ON SHEET A-111 LISTS THE DIMENSION | | BETWEEN TO WALLS AT 12 FEET 10 INCHES AND SHOWS POSTS | | INSIDE THE WALLS THAT REDUCE THIS EVEN MORE. PROVIDE AN | | ENCLOSURE THAT MEETS THE MINIMUM 13 FEET CLEAR WIDTH. | | | | 2) THERE ARE TWO STEEL BOLLARDS SHOWN ON THE DUMPSTER | | ENCLOSURE FLOOR PLAN THAT ARE OUTSIDE OF THE ENCLOSURE | | AND WITHIN THE DRIVE AISLE. BOLLARDS ARE NOT PERMITTED | | TO ENCROACH THE DRIVE AISLE. NOTE: THE BOLLARDS MUST BE | | CLEARLY SHOWN ON THE SITE PLAN. | | | | 3) THE EXTERIOR DIMENSONS OF THE DUMPSTER ENCLOSURE | | MUST BE SHOWN ON THE SITE PLAN. | | | | CONTACT ERIC SCHNEIDER @ 561-822-1446. | | [email protected] |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2023-02-21 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2023-02-21 |
Time |
09:37 |
Rev Time |
0.00 |
Received By |
eschneid |
Date |
2023-02-21 |
Time |
09:36 |
Sent To |
|
|
Notes |
2023-02-21 09:37:15 | FAILED | | | | THE MINOR SITE PLAN AMENDMENT HAS NOT PASSED REVIEW. | | THE PLANS WITH THIS PERMIT MUST MATCH THE PLANS | | ULTIMATELY APPROVED AS PART OF THE MINOR SITE PLAN | | AMENDMENT. | | | | CONTACT ERIC SCHNEIDER @ 561-822-1446 | | [email protected] | | |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2023-01-31 |
|
|
Cont ID |
|
Sent By |
eschneid |
Date |
2023-01-31 |
Time |
17:26 |
Rev Time |
|
Received By |
eschneid |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2022-12-28 14:22:41 | ZONING REVIEW ON HOLD UNTIL THE SUBMITTED SITE PLAN IS | | REVIEWED/APPROVED BY CITY STAFF. |
|
|