Plan Review Details - Permit 22120725
Plan Review Stops For Permit 22120725
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2023-01-03 Cont ID  
Sent By cpuell Date 2023-01-03 Time 13:30 Rev Time 0.00
Received By cpuell Date 2023-01-03 Time 13:30 Sent To  
Notes
2023-01-03 13:31:19ADDRESS APPROPRIATE FOR PROJECT.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2022-12-28 Cont ID  
Sent By pvalenti Date 2022-12-28 Time 07:46 Rev Time 0.00
Received By pvalenti Date 2022-12-28 Time 07:46 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-01-05 Cont ID  
Sent By pvalenti Date 2023-01-05 Time 06:10 Rev Time 0.00
Received By pvalenti Date 2023-01-05 Time 05:58 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-12-28 Cont ID  
Sent By pvalenti Date 2022-12-28 Time 07:47 Rev Time 0.00
Received By pvalenti Date 2022-12-28 Time 07:47 Sent To  
Notes
2022-12-28 07:53:49PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW DENIED:
  
 THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION.
  
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY'S PUBLIC UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
  
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
  
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-12-22 Cont ID  
Sent By jleahy Date 2022-12-22 Time 13:49 Rev Time 0.00
Received By jleahy Date 2022-12-22 Time 13:49 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2022-12-29 Cont ID  
Sent By rrossano Date 2022-12-29 Time   Rev Time  
Received By rrossano Date 2022-12-29 Time   Sent To I
Notes
2022-12-29 14:30:06PASSED WITH PROVISOS:
  
 THERE ARE WATER AND SEWER LINES IN THE VICINITY OF THIS
 PROJECT. PER CHAPTER 556 OF THE FLORIDA STATE STATUTES,
 YOU MUST CALL 811 FOR UTILITY LOCATES AT LEAST TWO FULL
 BUSINESS DAYS IN ADVANCE OF ANY CONSTRUCTION OR
 DEMOLITION WORK. INFORMATION CAN BE FOUND HERE:
 HTTP://WWW.SUNSHINE811.COM/
  
 PROVIDE ALL REQUIRED ASSOCIATED DOCUMENTS AS REQUIRED
 BY BUILDING DEPT. -UTILITY SIGNOFFS - WATER/SEWER,FPU.
  
 THANKS,
 RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES
 DEPT., 561-494-1098, FAX: 561-494-1116 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-12-21 Cont ID  
Sent By amhamilt Date 2022-12-21 Time 10:41 Rev Time 0.00
Received By amhamilt Date 2022-12-21 Time 10:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-01-05 Cont ID  
Sent By pvalenti Date 2023-01-05 Time 06:10 Rev Time 0.00
Received By pvalenti Date 2023-01-03 Time 15:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-01-03 Cont ID  
Sent By cpuell Date 2023-01-03 Time 13:31 Rev Time 0.00
Received By cpuell Date 2022-12-20 Time 08:47 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-12-28 Cont ID  
Sent By pvalenti Date 2022-12-28 Time 07:55 Rev Time 0.00
Received By pvalenti Date 2022-12-28 Time 07:55 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-12-21 Cont ID  
Sent By amhamilt Date 2022-12-21 Time 10:41 Rev Time 0.00
Received By amhamilt Date 2022-12-21 Time 10:41 Sent To  
Notes
***NONE***