Plan Review Details - Permit 22120608
Plan Review Stops For Permit 22120608
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2023-01-05 Cont ID  
Sent By cpuell Date 2023-01-05 Time 10:15 Rev Time 0.00
Received By cpuell Date 2023-01-05 Time 10:15 Sent To  
Notes
2023-01-05 10:22:51MULTIPLE UNITS ON THIS BUILDING 1, 2, 3 AND 4, UNITS
 WILL BE DEACTIVED ONCE THE BUILDING HAS BEEN DEMOLISHED
 AND INSPECTED.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status P Date 2022-12-28 Cont ID  
Sent By pvalenti Date 2022-12-28 Time 08:44 Rev Time 0.00
Received By pvalenti Date 2022-12-28 Time 08:44 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-04-12 Cont ID  
Sent By pvalenti Date 2023-04-05 Time 15:34 Rev Time 0.00
Received By pvalenti Date 2023-04-05 Time 15:34 Sent To  
Notes
2023-04-05 15:46:27PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW APPROVED

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-12-28 Cont ID  
Sent By pvalenti Date 2022-12-28 Time 08:45 Rev Time 0.00
Received By pvalenti Date 2022-12-28 Time 08:44 Sent To  
Notes
2022-12-28 08:47:07THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY???S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
 6. COMPLETE THE DEMO DEBRIS FORM: HTTP://WPB.ORG/DEPART
 MENTS/DEVELOPMENT-SERVICES/FORMS/BUILDING-PERMIT-FORMS
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-04-11 Cont ID  
Sent By lquinone Date 2023-04-11 Time 10:44 Rev Time 0.00
Received By lquinone Date 2023-04-11 Time 10:44 Sent To  
Notes
2023-04-11 10:45:55PASSED WITH PROVISO:
 ADDRESS BUILDING COMMENTS
  
 THANKS,
 LINDA M. QUINONES-CINTRON, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT (561) 494-1085
 [email protected]
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2023-01-03 Cont ID  
Sent By rrossano Date 2023-01-03 Time   Rev Time  
Received By rrossano Date 2023-01-03 Time   Sent To I
Notes
2023-01-03 08:31:51PLEASE ADDRESS BUILDING COMMENTS.

Review Stop HIST HISTORICAL
Rev No 2 Status P Date 2023-04-07 Cont ID  
Sent By fmittner Date 2023-04-07 Time 13:14 Rev Time 0.00
Received By fmittner Date 2023-04-07 Time 13:14 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status F Date 2022-12-30 Cont ID  
Sent By fmittner Date 2022-12-30 Time 16:07 Rev Time 0.00
Received By fmittner Date 2022-12-30 Time 16:07 Sent To  
Notes
2022-12-30 16:08:31PROPERTY IN HISTORIC DISTRICT, NEW CONSTRUCTION PERMIT
 TO BE SECURED PRIOR TO DEMO ISSUANCE.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-04-11 Cont ID  
Sent By pvalenti Date 2023-04-11 Time 12:57 Rev Time 0.00
Received By pvalenti Date 2023-04-03 Time 10:51 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2023-01-05 Cont ID  
Sent By cpuell Date 2023-01-05 Time 10:22 Rev Time 0.00
Received By cpuell Date 2022-12-22 Time 10:05 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status N Date 2022-12-28 Cont ID  
Sent By pvalenti Date 2022-12-28 Time 08:44 Rev Time 0.00
Received By pvalenti Date 2022-12-28 Time 08:44 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2023-04-07 Cont ID  
Sent By fmittner Date 2023-04-07 Time 13:14 Rev Time 0.00
Received By fmittner Date 2023-04-07 Time 13:14 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-12-30 Cont ID  
Sent By fmittner Date 2022-12-30 Time 16:07 Rev Time 0.00
Received By fmittner Date 2022-12-30 Time 16:07 Sent To  
Notes
***NONE***