Plan Review Details - Permit 22120118
Plan Review Stops For Permit 22120118
Review Stop AD ADDRESSING
Rev No 2 Status P Date 2022-12-14 Cont ID  
Sent By cpuell Date 2022-12-14 Time 10:46 Rev Time 0.00
Received By cpuell Date 2022-12-14 Time 10:46 Sent To  
Notes
2022-12-14 10:47:022315 AND 2317 PARKER AVE RETIRED THE NEW ADDRESS WILL
 BE 901 UPLAND RD, UPDATED PERMIT.

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2022-12-13 Cont ID  
Sent By cpuell Date 2022-12-13 Time 12:47 Rev Time 0.00
Received By cpuell Date 2022-12-13 Time 12:47 Sent To  
Notes
2022-12-13 12:50:05AN UPLAND DR NEEDS TO BE ASSIGNED TO THIS PARCEL DUE TO
 THE CONFIGURATIONS OF THE NEW SINGLE FAMILY HOME.
 PLEASE CONTACT [email protected] OR CALL
 561-805-6659

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2023-02-13 Cont ID  
Sent By rmcphers Date 2023-02-13 Time 08:54 Rev Time 0.00
Received By rmcphers Date 2023-02-13 Time 08:54 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2023-02-10 Cont ID  
Sent By rmcphers Date 2023-02-10 Time 10:33 Rev Time 0.00
Received By rmcphers Date 2023-02-10 Time 10:33 Sent To  
Notes
2023-02-10 10:35:47NEW SFR
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) THE SITE DRAINAGE PLAN NEEDS THE DESIGNERS NAME AND
 SIGNATURE - FBC WPB 107.2.1

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2023-02-07 Cont ID  
Sent By rmcphers Date 2023-02-07 Time 15:03 Rev Time 0.00
Received By rmcphers Date 2023-02-07 Time 14:51 Sent To  
Notes
2023-02-07 14:53:20NEW SFR
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) THE PRODUCT APPROVAL LETTER PROVIDED NEEDS TO BE
 DIGITALLY SIGNED BY THE DESIGNER.
  
 2) PLEASE PROVIDE A SITE PLAN THAT SHOWS THE STORM
 WATER DRAINAGE FLOW AWAY FROM THE BUILDING AND AWAY
 FROM THE NEIGHBORING PROPERTY - FBC WPB 107.2.5 SITE
 PLAN. THE CONSTRUCTION DOCUMENTS SUBMITTED WITH THE
 APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY A SITE
 PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF NEW
 CONSTRUCTION AND EXISTING STRUCTURES ON THE SITE,
 DISTANCES FROM LOT LINES, THE ESTABLISHED STREET GRADES
 AND THE PROPOSED FINISHED GRADES, DEPICTING THE
 PROPOSED LOT DRAINAGE AND, AS APPLICABLE, FLOOD HAZARD
 AREAS, FLOODWAYS, AND DESIGN FLOOD ELEVATIONS; AND IT
 SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND
 INCLUDED ON A BOUNDARY LINE SURVEY. (PLEASE PROVIDE CUT
 SECTIONS FOR ANY PROPOSED WATER RETAINING SWALES)

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-12-20 Cont ID  
Sent By rmcphers Date 2022-12-20 Time 16:09 Rev Time 0.00
Received By rmcphers Date 2022-12-20 Time 15:59 Sent To  
Notes
2022-12-20 16:09:52NEW SFR
 REVIEWED BY ROGER MCPHERSON
 561-805-6716
 [email protected]
 CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1
 AMENDMENT
  
 CORRECTIONS NEEDED -
  
 1) PLEASE PROVIDE COMPLETE (FRONT PAGES AND THE
 INSTALLATION INSTRUCTIONS) MIAMI DADE OR FLORIDA STATE
 PRODUCT APPROVALS FOR THE EXTERIOR WINDOWS,DOORS AND
 ROOFING SYSTEMS - ALL PRODUCT APPROVALS NEED TO BE
 REVIEWED AND MARKED APPROVED BY THE BUILDING DESIGNER
 OF RECORD FBC WPB 107.3.4
  
 2) PLEASE SHOW THE ATTIC ACCESS LOCATION AND SIZE PER
 FBC R807.1
  
 3) DRAWING 01 - FLOOR PLAN - BEDROOM NUMBER 2 SHOWS THE
 EGRESS WINDOW DESIGNATION AS A AND B - WHICH DOES NOT
 MEET THE EMERGENCY EGRESS REQUIREMENT - FBC R310.2
  
 4) PLEASE PROVIDE A SITE PLAN THAT SHOWS THE STORM
 WATER DRAINAGE FLOW AWAY FROM THE BUILDING AND AWAY
 FROM THE NEIGHBORING PROPERTY - FBC WPB 107.2.5 SITE
 PLAN. THE CONSTRUCTION DOCUMENTS SUBMITTED WITH THE
 APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY A SITE
 PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF NEW
 CONSTRUCTION AND EXISTING STRUCTURES ON THE SITE,
 DISTANCES FROM LOT LINES, THE ESTABLISHED STREET GRADES
 AND THE PROPOSED FINISHED GRADES, DEPICTING THE
 PROPOSED LOT DRAINAGE AND, AS APPLICABLE, FLOOD HAZARD
 AREAS, FLOODWAYS, AND DESIGN FLOOD ELEVATIONS; AND IT
 SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND
 INCLUDED ON A BOUNDARY LINE SURVEY. (PLEASE PROVIDE CUT
 SECTIONS FOR ANY PROPOSED WATER RETAINING SWALES)

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-12-16 Cont ID  
Sent By rperdomo Date 2022-12-16 Time 13:24 Rev Time 0.00
Received By rperdomo Date 2022-12-16 Time 12:48 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2023-02-07 Cont ID  
Sent By rwbrown Date 2023-02-07 Time 16:12 Rev Time 0.00
Received By rwbrown Date 2023-02-07 Time 16:12 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2023-02-13 Cont ID  
Sent By rmcphers Date 2023-02-13 Time 08:55 Rev Time 0.00
Received By rmcphers Date 2023-02-10 Time 15:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-02-10 Cont ID  
Sent By rmcphers Date 2023-02-10 Time 10:36 Rev Time 0.00
Received By rmcphers Date 2023-02-09 Time 07:13 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-02-07 Cont ID  
Sent By rwbrown Date 2023-02-07 Time 16:12 Rev Time 0.00
Received By rwbrown Date 2023-02-06 Time 10:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-12-29 Cont ID  
Sent By asangele Date 2022-12-29 Time 15:36 Rev Time 0.00
Received By asangele Date 2022-12-29 Time 15:36 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2023-02-17 Cont ID  
Sent By aoliver Date 2023-02-17 Time 16:33 Rev Time 0.00
Received By aoliver Date 2023-02-17 Time 16:33 Sent To  
Notes
2023-02-17 16:24:34RECEIPT MU-2023-007023 - $546.52 PAID
2023-02-10 15:49:062/10/23 EMAILED IMPACT OFFICE FOR REVIEW. LEM

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2022-12-20 Cont ID  
Sent By rmcphers Date 2022-12-20 Time 16:10 Rev Time 0.00
Received By rmcphers Date 2022-12-20 Time 16:10 Sent To  
Notes
2022-12-20 16:11:34PLANS WILL BE REVIEWED BY THE PBC IMPACT FEE OFFICE
 DIGITALLY VIA PROJECTDOX UPON NOTIFICATION BY THIS
 OFFICE. NOTIFICATION MAY OCCUR WHEN PLANS ARE NEAREST
 FINAL FORM. YOU MAY COORDINATE WITH THE IMPACT FEE
 OFFICE AT (561) 233-5025 OR SIMPLY UPLOAD THE MUNICIPAL
 IMPACT FEE QUESTIONNAIRE FORM TO YOUR PROJECT AND NAME
 THE FILE MUNICIPAL IMPACT FEE QUESTIONNAIRE. THE FORM
 CAN BE FOUND AT: HTTP://DISCOVER.PBCGOV.ORG/PZB/ADMINIS
 TRATION/PDF/IMPACTFEES/FORMS/QUESTIONNAIRE.PDF
  
 UPON APPROVAL AND FEE PAYMENT, PLEASE UPLOAD THE
 RECEIPT TO YOUR PROJECT OR EMAIL IT TO
 [email protected] .
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2022-12-21 Cont ID  
Sent By medwards Date 2022-12-21 Time 15:18 Rev Time 0.00
Received By medwards Date 2022-12-21 Time 15:18 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2023-02-07 Cont ID  
Sent By rwbrown Date 2023-02-07 Time 16:12 Rev Time 0.00
Received By rwbrown Date 2023-02-07 Time 16:12 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-12-16 Cont ID  
Sent By rwbrown Date 2022-12-16 Time 10:15 Rev Time 0.00
Received By rwbrown Date 2022-12-16 Time 10:15 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2023-02-07 Cont ID  
Sent By rmcphers Date 2023-02-07 Time 15:03 Rev Time 0.00
Received By rmcphers Date 2023-02-07 Time 15:03 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2022-12-20 Cont ID  
Sent By rmcphers Date 2022-12-20 Time 16:11 Rev Time 0.00
Received By rmcphers Date 2022-12-20 Time 16:11 Sent To  
Notes
2022-12-20 16:12:04SEE BUILDING PLAN REVIEW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2023-02-13 Cont ID  
Sent By rmcphers Date 2023-02-13 Time 08:54 Rev Time 0.00
Received By rmcphers Date 2023-02-13 Time 08:54 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-02-10 Cont ID  
Sent By rmcphers Date 2023-02-10 Time 10:36 Rev Time 0.00
Received By rmcphers Date 2023-02-10 Time 10:36 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2023-02-07 Cont ID  
Sent By rmcphers Date 2023-02-07 Time 15:03 Rev Time 0.00
Received By rmcphers Date 2023-02-07 Time 15:03 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-12-20 Cont ID  
Sent By rmcphers Date 2022-12-20 Time 16:13 Rev Time 0.00
Received By rmcphers Date 2022-12-20 Time 16:13 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2023-01-04 Cont ID  
Sent By asangele Date 2023-01-04 Time   Rev Time 0.00
Received By asangele Date 2023-01-04 Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2022-12-29 Cont ID  
Sent By asangele Date 2022-12-29 Time 15:31 Rev Time 0.00
Received By asangele Date 2022-12-29 Time 15:31 Sent To  
Notes
2022-12-29 15:36:0812/29/2022
 FAILED
  
 NEW CONSTRUCTION ARE REQUIRED TO HAVE A LANDSCAPE
 PERMIT.
 PLEASE REACH OUT TO RAY OR SMITH THE CITIES LANDSCAPE
 PLANNERS
 RAY: 561-822-1462
 SMITH: 561-822-1562
  
  
 SEPARATE PERMIT REQUIRED FOR
 DRIVEWAY
 POOL
 LANDSCAPE
  
  
  
 ALEXIS SANGELEER
 PLANNER
 [email protected]


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved