Plan Review Details - Permit 22110627
Plan Review Stops For Permit 22110627
Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2023-01-25 Cont ID  
Sent By rmcdouga Date 2023-01-25 Time 07:49 Rev Time 0.00
Received By rmcdouga Date 2023-01-25 Time 07:49 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2022-12-22 Cont ID  
Sent By rmcdouga Date 2022-12-22 Time 15:44 Rev Time 0.00
Received By rmcdouga Date 2022-12-22 Time 15:44 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-12-21 Cont ID  
Sent By rmcdouga Date 2022-12-21 Time 08:00 Rev Time 0.00
Received By rmcdouga Date 2022-12-21 Time 08:00 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-12-02 Cont ID  
Sent By jleahy Date 2022-12-02 Time 17:54 Rev Time 0.00
Received By jleahy Date 2022-12-02 Time 17:49 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2023-01-25 Cont ID  
Sent By rmcdouga Date 2023-01-25 Time 07:55 Rev Time 0.00
Received By rmcdouga Date 2022-12-28 Time 07:20 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-12-22 Cont ID  
Sent By rmcdouga Date 2022-12-22 Time 15:50 Rev Time 0.00
Received By rmcdouga Date 2022-12-21 Time 16:50 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-12-21 Cont ID  
Sent By rmcdouga Date 2022-12-21 Time 08:22 Rev Time 0.00
Received By rmcdouga Date 2022-11-17 Time 08:07 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2023-01-25 Cont ID  
Sent By rmcdouga Date 2023-01-25 Time 07:54 Rev Time 0.00
Received By rmcdouga Date 2023-01-25 Time 07:54 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2022-12-22 Cont ID  
Sent By rmcdouga Date 2022-12-22 Time 15:44 Rev Time 0.00
Received By rmcdouga Date 2022-12-22 Time 15:44 Sent To  
Notes
2022-12-22 15:50:48THE ENGINEER'S DIGITAL SIGNATURE CAN NOT BE VERIFIED.
 IT APPEARS THAT THE DOCUMENT WAS SCANNED AND THEN
 UPLOADED. ELECTRONIC PLANS THAT ARE DIGITALLY SIGNED
 HAVE TO REMAIN IN THE ELECTRONIC FORMAT TO RETAIN A
 VALID SIGNATURE. ELECTRONICALLY SUBMITTED DRAWINGS ARE
 REQUIRED TO HAVE THE ARCHITECT OR ENGINEER'S DIGITAL
 SIGNATURE ON THEM. FS 481 & FAC 61G1 OR FS 471 & FAC
 61G15

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2022-12-21 Cont ID  
Sent By rmcdouga Date 2022-12-21 Time 08:00 Rev Time 0.00
Received By rmcdouga Date 2022-11-17 Time 09:11 Sent To  
Notes
2022-12-21 08:22:52I AM NOT ABLE TO VERIFY THE ENGINEER'S DIGITAL
 SIGNATURE ON THE GENERATOR PAD DRAWINGS. IT MAY NEED TO
 BE UPLOADED SEPARATELY. ELECTRONICALLY SUBMITTED
 DRAWINGS ARE REQUIRED TO HAVE THE ARCHITECT OR
 ENGINEER'S DIGITAL SIGNATURE ON THEM. FS 481 & FAC 61G1
 OR FS 471 & FAC 61G15
2022-12-02 17:54:49ELECTRICAL PAGE SIGNATURE APPROVED JLEAHY

Review Stop Z ZONING
Rev No 1 Status P Date 2022-12-07 Cont ID  
Sent By asangele Date 2022-12-07 Time 15:22 Rev Time 0.00
Received By asangele Date 2022-12-07 Time 15:22 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved