Plan Review Details - Permit 22101271
Plan Review Stops For Permit 22101271
Review Stop G GAS REVIEW
Rev No 2 Status P Date 2022-11-23 Cont ID  
Sent By rwbrown Date 2022-11-23 Time 07:40 Rev Time 0.00
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2022-11-01 Cont ID  
Sent By rbrown Date 2022-11-01 Time 12:43 Rev Time 0.00
Received By rwbrown Date 2022-11-01 Time 12:43 Sent To  
Notes
2022-11-01 12:45:341ST GAS REVIEW
  
 THIS PLAN WAS REVIEWED FOR CODE COMPLIANCE AND FAILED
 BY RYAN BROWN WITH THE FOLLOWING COMMENTS.
  
 1. 2017 WPB AMEND 107.3.5.3 (13) - THE GAS DIAGRAM IS
 MISSING THE PIPE SIZES. ALSO INLCLUDE THE MATERIAL
 BEING USED AND THE PIPE PRESSURES USED FOR SIZING.
 INCLUDE THE BTU LOAD FOR ALL APPLIANCES ON THE SYSTEM,
 INCLUDING THE EXISING ONES AS WELL AS THE NEW TANKLESS
 WATER HEATER AND THE GENERATOR IN THE NEW LOCATION.
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM.
  
  
 RYAN W. BROWN
 CHIEF PLUMBING INSPECTOR
 OFFICE: 561-805-6692
 CELL: 561-517-4293
 EMAIL: [email protected]
  
  
 V7 FPC - 2020 FLORIDA PLUMBING CODE
 V7 FGC - 2020 FLORIDA FUEL GAS
 V7 FRC - 2020 FLORIDA RESIDENTIAL BUILDING CODE
 V7 FAC - 2020 FLORIDA ACCESSIBILITY CODE
 V7 FEX - 2020 FLORIDA EXISTING BUILDING CODE
 V7 FEC - 2020 FLORIDA ENERGY CONSERVATION
 2021 F.S. - 2021 FLORIDA STATUTES
 2021 F.A.C. - 2021 FLORIDA ADMINISTRATIVE CODE
 2017 WPB AMEND - 2017 WEST PALM BEACH AMENDMENTS TO THE
 FBC CHAPTER 1
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2022-11-23 Cont ID  
Sent By rwbrown Date 2022-11-23 Time 07:41 Rev Time 0.00
Received By rwbrown Date 2022-11-22 Time 07:16 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-11-18 Cont ID  
Sent By vbroglia Date 2022-11-18 Time 15:09 Rev Time 0.00
Received By vbroglia Date 2022-10-27 Time 09:16 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status N Date 2022-11-23 Cont ID  
Sent By rwbrown Date 2022-11-23 Time 07:40 Rev Time 0.00
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status N Date 2022-11-01 Cont ID  
Sent By rbrown Date 2022-11-01 Time 12:45 Rev Time  
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status P Date 2022-11-23 Cont ID  
Sent By rwbrown Date 2022-11-23 Time 07:41 Rev Time 0.00
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-11-01 Cont ID  
Sent By rwbrown Date 2022-11-01 Time 12:46 Rev Time  
Received By rwbrown Date   Time   Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status N Date 2022-11-18 Cont ID  
Sent By vbroglia Date 2022-11-18 Time 15:09 Rev Time 0.00
Received By vbroglia Date 2022-11-18 Time 15:09 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved