Plan Review Stops For Permit 22101116 |
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
P |
Date |
2023-01-23 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2023-01-23 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2023-01-23 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2022-12-19 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-12-19 |
Time |
|
Rev Time |
0.00 |
Received By |
rrossano |
Date |
2022-12-19 |
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2022-11-07 |
|
|
Cont ID |
|
Sent By |
rrossano |
Date |
2022-11-07 |
Time |
|
Rev Time |
|
Received By |
rrossano |
Date |
2022-11-07 |
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2023-01-19 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2023-01-19 |
Time |
|
Rev Time |
0.00 |
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2023-01-19 10:12:06 | FIRE PROVISO COMMENTS: | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | AT THE TIME OF INSPECTION BY A FIRE DEPARTMENT | | INSPECTOR. FAILURE TO FOLLOW THESE PROVISO COMMENTS | | WILL RESULT IN A FAILED FIRE INSPECTION. | | | | INSTALLATION, TESTING AND INSPECTION SHALL BE PER THE | | REQUIREMENTS OF NFPA 24, STANDARD FOR THE INSTALLATION | | OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES. | | THIS SHALL INCLUDE BUT NOT LIMITED TO WITNESSING THE | | TORQUE OF BOLTED JOINTS TO THE MANUFACTURER???S | | SPECIFICATIONS, PROPER COATING OF BOLTED JOINTS AND | | HYDROSTATIC TESTING. | | | | DO NOT COVER OVER ANY JOINTS PRIOR TO FIRE DEPARTMENT | | INSPECTION. | | | | C. WALKER | | | | 561-804-4762 | | | | [email protected] | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2022-12-16 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2022-12-16 |
Time |
|
Rev Time |
0.00 |
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2022-12-16 07:27:06 | FIRE PROVISO COMMENTS: | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | AT THE TIME OF INSPECTION BY A FIRE DEPARTMENT | | INSPECTOR. FAILURE TO FOLLOW THESE PROVISO COMMENTS | | WILL RESULT IN A FAILED FIRE INSPECTION. | | | | INSTALLATION, TESTING AND INSPECTION SHALL BE PER THE | | REQUIREMENTS OF NFPA 24, STANDARD FOR THE INSTALLATION | | OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES. | | THIS SHALL INCLUDE BUT NOT LIMITED TO WITNESSING THE | | TORQUE OF BOLTED JOINTS SO THE MANUFACTURER | | SPECIFICATIONS, PROPER COATING OF BOLTED JOINTS AND | | HYDROSTATIC TESTING. | | | | DO NOT COVER OVER ANY JOINTS PRIOR TO FIRE DEPARTMENT | | INSPECTION. | | | | C. WALKER | | | | 561-804-4762 | | | | [email protected] | | |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2022-10-26 |
|
|
Cont ID |
|
Sent By |
cwalker |
Date |
2022-10-26 |
Time |
|
Rev Time |
|
Received By |
cwalker |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2022-10-26 13:21:48 | FIRE PROVISO COMMENTS: | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | AT THE TIME OF INSPECTION BY A FIRE DEPARTMENT | | INSPECTOR. FAILURE TO FOLLOW THESE PROVISO COMMENTS | | WILL RESULT IN A FAILED FIRE INSPECTION. | | | | INSTALLATION, TESTING AND INSPECTION SHALL BE PER THE | | REQUIREMENTS OF NFPA 24, STANDARD FOR THE INSTALLATION | | OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES. | | THIS SHALL INCLUDE BUT NOT LIMITED TO WITNESSING THE | | TORQUE OF BOLTED JOINTS TO THE MANUFACTURER???S | | SPECIFICATIONS, PROPER COATING OF BOLTED JOINTS, AND | | HYDROSTATIC TESTING. | | | | DO NOT COVER OVER ANY JOINTS PRIOR TO FIRE DEPARTMENT | | INSPECTION. | | | | C. WALKER | | | | 561-804-4762 | | | | [email protected] | | |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2023-01-25 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-01-25 |
Time |
09:12 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-01-18 |
Time |
11:10 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2022-12-20 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-12-20 |
Time |
10:47 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-12-15 |
Time |
07:15 |
Sent To |
|
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
|
Date |
2022-11-15 |
Time |
|
Rev Time |
0.00 |
Received By |
lmarchan |
Date |
2022-10-25 |
Time |
16:49 |
Sent To |
|
|
Notes |
|
|
Review Stop |
PRIVATEPRV |
PRIVATE PROVIDER DOCUMENTS |
Rev No |
1 |
Status |
P |
Date |
2022-11-08 |
|
|
Cont ID |
|
Sent By |
aoliver |
Date |
2022-11-08 |
Time |
11:28 |
Rev Time |
0.00 |
Received By |
aoliver |
Date |
2022-11-08 |
Time |
11:28 |
Sent To |
|
|
Notes |
2022-11-08 11:29:24 | PP INSPECTIONS -AC- ABSOLUTE CIVIL |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
3 |
Status |
P |
Date |
2023-01-25 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2023-01-25 |
Time |
09:12 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2023-01-25 |
Time |
09:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
2 |
Status |
F |
Date |
2022-12-20 |
|
|
Cont ID |
|
Sent By |
rmcphers |
Date |
2022-12-20 |
Time |
10:46 |
Rev Time |
0.00 |
Received By |
rmcphers |
Date |
2022-12-20 |
Time |
10:46 |
Sent To |
|
|
Notes |
2022-12-20 10:47:38 | SIGNATURE REVIEW | | | | CORRECTIONS NEEDED - | | | | 1) SIGNED AND SEALED DRAWINGS DO NOT SHOW AS DIGITALLY | | SIGNED IN ADOBE READER - | | | | SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED TO BE | | DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN | | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL | | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A | | SPECIFIC TYPE OF E-SIGNATURE). | | |
|
|
Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
Rev No |
1 |
Status |
F |
Date |
2022-11-15 |
|
|
Cont ID |
|
Sent By |
ccole |
Date |
2022-11-15 |
Time |
09:12 |
Rev Time |
0.00 |
Received By |
ccole |
Date |
2022-11-15 |
Time |
09:08 |
Sent To |
|
|
Notes |
2022-11-15 09:14:13 | SIGNATURE REVIEW FBC- 2020 | | PERMIT- 22101116 | | 11/15/22 | | CODES IN EFFECT: | | FBC B- FLORIDA BUILDING CODE 7TH EDITION 2020 | | FS- FLORIDA STATUTES | | FAC- FLORIDA ADMINISTRATIVE CODE | | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC | | | | PLAN REVIEW RESULTS: DENIED. | | | | 1) THE PLANS ARE NOT DIGITALLY SIGNED AND SREAELD BY | | THE ENGINEER. PLANS PREPARED BY FL. LICENSED ENGINEERS | | THAT ARE TRANSMITTED ELECTRONICALLY SHALL BEAR THE | | DIGITAL SEAL AND SIGNATURE OF THE ENGINEER- FL. STATUTE | | 471.025, AND SECTION 61G15-23.005 FAC. | | | | FLORIDA BOARD OF PROFESSIONAL ENGINEERS GUIDELINES FOR | | ELECTRONIC OR DIGITALLY SIGNED AND SEALED PLANS AND | | DOCUMENTS. | | A DIGITAL SIGNATURE MUST BE UNIQUE TO THE PROFESSIONAL | | ENGINEER USING IT, OBTAINED FROM A THIRD-PARTY | | CERTIFICATION AUTHORITY, AND CAPABLE OF VERIFICATION. | | THE CERTIFICATION AUTHORITY WILL VET THE PE AND PROVIDE | | A PASSWORD-PROTECTED DIGITAL SIGNATURE FILE. (FBPE DOES | | NOT APPROVE OR PROVIDE A LIST OF AUTHORITIES.) | | YOU MAY NOT USE THE DIGITAL OPTION PROVIDED IN ADOBE | | ACROBAT, SINCE IT IS SELF-AUTHENTICATED AND DOES NOT | | USE A THIRD PARTY. | | YOUR DIGITAL SIGNATURE MUST BE LINKED TO THE DOCUMENT | | IN SUCH A WAY THAT ANY CHANGE INVALIDATES THE SIGNATURE | | AND DOCUMENT. | | | | CHRISTOPHER L. COLE | | MECHANICAL/PLUMBING PLANS EXAMINER | | 401 CLEMATIS STREET | | WEST PALM BEACH FL 33401 | | 561-805-6719 | | |
|
|