Plan Review Details - Permit 22101075
Plan Review Stops For Permit 22101075
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-01-12 Cont ID  
Sent By pvalenti Date 2023-01-12 Time 08:44 Rev Time 0.00
Received By pvalenti Date 2023-01-12 Time 08:43 Sent To  
Notes
2023-01-12 08:47:20PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 BUILDING REVIEW APPROVED:
  
 NOTE: THE VALUE OF JOB HAS BEEN ADJUSTED/INCREASED PER
 THE MARSHALL/SWIFT VALUATION.
 THE FEES STILL NEED TO BE PAID.
  
 A NOTICE OF COMMENCEMENT IS REQUIRED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-12-02 Cont ID  
Sent By shill Date 2022-12-02 Time 09:35 Rev Time 0.00
Received By shill Date 2022-12-02 Time 09:35 Sent To  
Notes
2022-12-02 09:36:11[email protected]
  
 FBC 109, VALUE IS LOW. PROVIDE A DETAILED COST
 BREAKDOWN.
  
 A NOTICE OF COMMENCEMENT IS REQUIRED FS714. EVEN IF
 THIS ONE PERMIT HAD A TRUE VALUE UNDER $2500 IT APPEARS
 THAT THERE IS MORE THAN ONE PERMIT BEING INSTALLED AT
 THIS LOCATION, NOC IS BASED ON VALUE OF THE PROJECT.
  
 THIS IS A REPEAT COMMENT FOR THIS CONTRACTOR. PLEASE BE
 ADVISED THAT RESUBMITTALS FOR VALUE WILL NOT ALWAYS BE
 EXPEDITED AS APPLICANT HAS BEEN ADVISED THAT VALUE IS
 TO INCLUDE ALL LABOR, MATERIALS, OVERHEAD, PROFIT.
 FAILURE TO PROVIDE REASONABLE VALUATION UP FRONT MAY
 RESULT IN DELAY FOR THE CUSTOMER - THE RESUBMITTAL WITH
 THE DETAILED COST BREAKDOWN WILL BE TREATED LIKE ALL
 OTHER RESUBMITTALS, WILL WAIT ITS TURN IN THE QUEUE.
  
 CONTINUING TO SUBMIT PERMITS WITH UNREASONABLY LOW
 VALUE DELAYS NOT ONLY THIS CUSTOMER'S REVIEW, BUT DUE
 TO THE FACT IT NEEDS TO BE RESUBMITTED, IT AFFECTS ALL
 OTHERS IN THE QUEUE.
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2023-01-11 Cont ID  
Sent By jleahy Date 2023-01-11 Time 15:54 Rev Time 0.00
Received By jleahy Date 2023-01-11 Time 15:54 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2022-11-19 Cont ID  
Sent By jleahy Date 2022-11-19 Time 08:53 Rev Time 0.00
Received By jleahy Date 2022-11-19 Time 08:19 Sent To  
Notes
2022-11-19 08:19:21FLORIDA BUILDING CODE 2020 7TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 7TH ED
 NFPA 70 2017 EDITION
  
 JAKE LEAHY
 ELECTRICAL PLANS EXAMINER II
 561-805-6713
 [email protected]
  
 VALUE OF WORK SHOWN IS LOW PLEASE SUBMIT A COST
 BREAKDOWN SHOWING LABOR AND MATERIALS.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-01-12 Cont ID  
Sent By pvalenti Date 2023-01-12 Time 08:47 Rev Time 0.00
Received By pvalenti Date 2023-01-09 Time 07:34 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-12-02 Cont ID  
Sent By shill Date 2022-12-02 Time 09:41 Rev Time 0.00
Received By shill Date 2022-10-24 Time 07:42 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-12-02 Cont ID  
Sent By shill Date 2022-12-02 Time 09:41 Rev Time 0.00
Received By shill Date 2022-12-02 Time 09:41 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-10-27 Cont ID  
Sent By afowlkes Date 2022-10-27 Time 15:39 Rev Time 0.00
Received By afowlkes Date 2022-10-27 Time 15:39 Sent To  
Notes
***NONE***