Review Stop AD ADDRESSING
Rev No 3 Status P Date 2023-07-18 Cont ID  
Sent By cpuell Date 2023-07-18 Time 08:06 Rev Time 0.00
Received By cpuell Date 2023-07-18 Time 08:06 Sent To  
Notes
2023-07-18 08:06:50AREA IS WORK IS FOR 4735 S DIXIE HWY

Review Stop AD ADDRESSING
Rev No 2 Status F Date 2023-07-14 Cont ID  
Sent By cpuell Date 2023-07-14 Time 14:46 Rev Time 0.00
Received By cpuell Date 2023-07-14 Time 14:46 Sent To  
Notes
2023-07-14 14:47:48NEW APPLICATION FORM UPLOADED WITH THE ADDRESS OF 4301
 S DIXIE HWY WHICH IS THE PRIMARY FOR THE PARCEL BUT
 DOES NOT INDICATE WHICH AREA THE WORK IS FOR. PLEASE
 PROVIDE A SITE PLAN OR AERIAL MAP SHOWING THE EXACT
 BUILDING TO BE WORKED ON. PLEASE EMAIL RESPONSE TO
 [email protected] OR CALL 561-805-6659.

Review Stop AD ADDRESSING
Rev No 1 Status F Date 2022-11-01 Cont ID  
Sent By cpuell Date 2022-11-01 Time 17:14 Rev Time 0.00
Received By cpuell Date 2022-11-01 Time 17:14 Sent To  
Notes
2022-11-01 17:23:55PLANS INDICATE THAT THE BUILDING TO BE DEMOLISHED IS
 THE CONCESSION BUILDING WHICH HAS THE ADDRESS OF 4735 S
 DIXIE HWY, PLEASE CONTACT [email protected] OR CALL
 561-805-6659 TO DISCUSS ADDRESS ISSUES.

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 2 Status P Date 2023-07-12 Cont ID  
Sent By pvalenti Date 2023-07-12 Time 08:19 Rev Time 0.00
Received By pvalenti Date 2023-07-12 Time 08:11 Sent To  
Notes
***NONE***

Review Stop ASBESTOS CONFIRM RPT SENT TO PBC HEALTH
Rev No 1 Status F Date 2022-11-15 Cont ID  
Sent By pvalenti Date 2022-11-15 Time 06:34 Rev Time 0.00
Received By pvalenti Date 2022-11-15 Time 06:34 Sent To  
Notes
2022-11-15 06:36:13PETER E VALENTI
 BUILDING PLANS EXAMINER II/INSPECTOR
 [email protected]
 561 805 6673
  
 FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020)
 FBC B = FBC BUILDING
 FBC R = FBC RESIDENTIAL
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
 FBC M = FBC MECHANICAL
 FBC FG = FBC FUEL GAS
  
 FAILED PLAN REVIEW, COMMERCIAL:
  
 PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING ASBESTOS
 REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTPS://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVIC
 ES/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION
 -RENOVATION.HTML
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2023-07-17 Cont ID  
Sent By pvalenti Date 2023-07-12 Time 08:44 Rev Time 0.00
Received By pvalenti Date 2023-07-12 Time 08:11 Sent To  
Notes
2023-07-12 09:06:25BUILDING-APPROVED

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2022-11-14 Cont ID  
Sent By pvalenti Date 2022-11-14 Time 16:38 Rev Time 0.00
Received By pvalenti Date 2022-11-14 Time 16:38 Sent To  
Notes
2022-11-14 16:59:56THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A
 DEMO PERMIT PER FLORIDA BUILDING
 CODE, BUILDING 3303:
  
 1. UTILITY RELEASE - FLORIDA POWER & LIGHT (ELECTRIC)
 RELEASE OF SERVICE CONFIRMATION. IF THE CONCESSION
 BUILDING (4735 S. DIXIE HWY) DOES NOT HAVE ITS OWN
 METER/SUPPLY AND FPL CANNOT REMOVE THE SUPPLY ALONE,
 THEN PROVIDE AN ELECTRICAL PERMIT FROM AN ELECTRICAL
 CONTRACTOR TO DISCONNECT POWER TO THE CONCESSION
 BUILDING SAFELY. ALSO WE NEED THE PERMIT TO HAVE THE
 CORRECT ADDRESS FOR THE CONCESSION BUILDING.
 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS)
 RELEASE OF SERVICE CONFIRMATION. PROVIDE THE CORRECT
 ADDRESS (4735 S. DIXIE HWY) ON THE RELEASE LETTER.
 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER
 DEPARTMENT, REQUEST FOR METER PULL, ON
 THEIR FORM "DEMOLITION APPLICATION"
 HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B
 UILDING-PERMIT-FORMS
 THIS FORM MUST BE SUBMITTED TO AND COMPLETED BY THE
 CITY OF WPB UTILITIES DEPARTMENT. AFTER THE UTILITIES
 DEPARTMENT HAS RETURNED THE APPLICATION, PLEASE
 SUBMIT/UPLOAD TO THIS (PROJECT DOX) DIGITAL PORTAL FOR
 OUR REVIEW.
 WATERDOWN METHOD:
 IF A WATER TRUCK IS DESIRED, PROVIDE DETAILED
 INFPRMATION OF THE WATER TRUCK SUCH AS: THE
 GALLON CAPACITY OF THE WATER TANK AND A LETTER
 INCLUDING A STATEMENT THAT THE WATER
 USED WILL BE POTABLE AND FROM AN OFF-SITE LOCATION ONLY
 AND WILL BE ON-SITE AT ALL TIMES
 DURING DEMOLITION.
 IF A HYDRANT METER OR BACKFLOW PREVENTER IS DESIRED,
 THEN A PARTIAL RELEASE WILL BE NOTED
 ON THEIR FORM. IF THE BACKFLOW PREVENTER DEVICE IS
 SELECTED, A PLUMBING PERMIT IS REQUIRED. BEFORE
 SCHEDULING THE 703(PLUMBING FINAL INSPECTION), THE
 BACKFLOW DEVICE NEEDS TO BE TESTED AND CERTIFIED BY
 THE CITY???S UTILITIES DEPT, 561-822-2244. FAX THE
 COMPLETED "DEMOLITION APPLICATION" FORM TO
 561-822-2183.
 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED (SUBMIT
 APPLICATION TO BUILDING DIVISION);
 SCHEDULE A FINAL PLUMBING #703.
 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST
 CONTROL COMPANY STATING THAT
 DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED
 FOR RODENTS.
 6. COMPLETE THE DEMO DEBRIS FORM: HTTP://WPB.ORG/DEPART
 MENTS/DEVELOPMENT-SERVICES/FORMS/BUILDING-PERMIT-FORMS
 IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR
 THE FORM TO [email protected].
 9. PLEASE PROVIDE A SIGNED ACKNOWLEDGEMENT FROM THE
 CONTRACTOR, ON LETTERHEAD, STATING THAT THE
 INSTRUCTIONS ON THE WEBSITE OF ASBESTOS PROGRAM
 COORDINATOR, FLORIDA DEPARTMENT OF HEALTH PALM BEACH
 COUNTY WILL BE FOLLOWED AND THAT NOTIFICATION WILL BE
 GIVEN TIMELY. ADDITIONAL INFORMATION REGARDING
 ASBESTOS REQUIREMENTS CAN BE FOUND ON THEIR WEBSITE:
 HTTP://PALMBEACH.FLORIDAHEALTH.GOV/PROGRAMS-AND-SERVICE
 S/ENVIRONMENTAL-HEALTH/AIR-QUALITY/ASBESTOS-DEMOLITION-
 RENOVATION.HTML
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2023-07-12 Cont ID  
Sent By cseifer Date 2023-07-12 Time 12:15 Rev Time 0.00
Received By cseifer Date 2023-07-12 Time 12:14 Sent To  
Notes
2023-07-12 12:15:05PASSED WITH PROVISO: ADDRESS OUTSTANDING BUILDING
 DEPARTMENT COMMENTS.
  
 THANKS,
 CHLOE SEIFER, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT, [email protected], 561-494-1098
 FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2022-11-07 Cont ID  
Sent By rrossano Date 2022-11-07 Time   Rev Time  
Received By rrossano Date 2022-11-07 Time   Sent To  
Notes
2022-11-07 11:07:08PLEASE UPLOAD EXECUTED WATER & SEWER FORM AFTER PUBLIC
 UTILITIES SITE VISIT AND SIGN OFF. CONTACT PUBLIC
 UTILITIES AT 561-822-1300.

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2022-11-21 Cont ID  
Sent By amhamilt Date 2022-11-21 Time 10:04 Rev Time 0.00
Received By amhamilt Date 2022-11-21 Time 10:04 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2023-07-14 Cont ID  
Sent By cpuell Date 2023-07-14 Time 14:47 Rev Time 0.00
Received By cpuell Date 2023-07-07 Time 08:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-11-22 Cont ID  
Sent By lmarchan Date 2022-11-22 Time 13:30 Rev Time 0.00
Received By lmarchan Date 2022-11-01 Time 08:49 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-11-15 Cont ID  
Sent By pvalenti Date 2022-11-15 Time 06:37 Rev Time 0.00
Received By pvalenti Date 2022-11-15 Time 06:37 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2022-11-21 Cont ID  
Sent By amhamilt Date 2022-11-21 Time 10:04 Rev Time 0.00
Received By amhamilt Date 2022-11-21 Time 10:04 Sent To  
Notes
***NONE***