Plan Review Details - Permit 22091026
Plan Review Stops For Permit 22091026
Review Stop AD ADDRESSING
Rev No 1 Status P Date 2022-09-27 Cont ID  
Sent By cpuell Date 2022-09-27 Time 15:47 Rev Time 0.00
Received By cpuell Date 2022-09-27 Time 15:47 Sent To  
Notes
2022-09-27 15:48:13ADDRESS APPROPRIATE FOR PROJECT.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2022-10-27 Cont ID  
Sent By cthroop Date 2022-10-27 Time 13:17 Rev Time 0.00
Received By cthroop Date 2022-10-27 Time 11:12 Sent To  
Notes
2022-10-27 14:05:17VALUE ADJUSTED TO $250,023 PER THE ICC BUILDING
 VALUATION DATA. CT

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2022-10-12 Cont ID  
Sent By mpeterso Date 2022-10-12 Time 16:35 Rev Time 0.00
Received By mpeterso Date 2022-10-12 Time 16:35 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2022-10-28 Cont ID  
Sent By aoliver Date 2022-10-28 Time 07:01 Rev Time 0.00
Received By aoliver Date 2022-09-27 Time 07:08 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status P Date 2022-12-01 Cont ID  
Sent By lmarchan Date 2022-12-01 Time 09:48 Rev Time 0.00
Received By lmarchan Date 2022-10-27 Time 11:12 Sent To  
Notes
2022-12-01 09:48:01RECEIPT MU-2022-052153 - $1484.05 PAID
2022-10-28 06:54:3410/28/22 EMAILED IMPACT FOR REVIEW-AO

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2022-09-30 Cont ID  
Sent By medwards Date 2022-09-30 Time 09:29 Rev Time 0.00
Received By medwards Date 2022-09-30 Time 09:28 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2022-09-28 Cont ID  
Sent By jesmith Date 2022-09-28 Time 15:17 Rev Time 0.00
Received By jesmith Date 2022-09-28 Time 15:03 Sent To  
Notes
2022-09-28 15:17:2122091026 1125 22ND ST
  
 PLUMBING COMMENTS: REVIEWED FOR COMPLIANCE IN
 ACCORDANCE WITH WPB FBC 107.3.5.3 (12) RESIDENTIAL (ONE
 AND TWO-FAMILY)
  
 ALL WORK PER STATE AND CITY CODES SUBJECT TO FIELD
 INSPECTOR'S APPROVAL
  
 BY REVIEWING THE PLANS / SPECIFICATIONS FOR CODE
 COMPLIANCE DOES NOT RELIEVE THE OWNER, DESIGN
 PROFESSIONAL, CONTRACTORS OR THEIR REPRESENTATIVES FROM
 THE RESPONSIBILITY TO COMPLY WITH ALL LOCAL, STATE AND
 NATIONAL CODES AND STANDARDS IN EFFECT AT THE TIME OF
 PERMIT ISSUANCE. OUR REVIEW IS NOT A CHECK OF EVERY
 ITEM AND DOES NOT PREVENT THIS DEPARTMENT FROM
 REQUIRING CORRECTIONS DURING CONSTRUCTION. ANY CHANGES
 / ALTERATIONS TO APPROVED PLANS SHALL BE APPROVED TO
 AVOID VOIDING OF THE PERMIT.
  
 PROVISO: A THERMAL EXPANSION CONTROL DEVICE SHALL BE
 CONNECTED TO THE STORAGE TYPE WATER HEATER COLD WATER
 PIPE DOWNSTREAM OF ALL CHECK VALVES, PRESSURE REDUCING
 VALVES AND BACKFLOW PREVENTERS. FBC RES P2903,
 P2903.4.2.
  
  
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2022-10-27 Cont ID  
Sent By cthroop Date 2022-10-27 Time 13:17 Rev Time 0.00
Received By cthroop Date 2022-10-27 Time 11:13 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2022-10-12 Cont ID  
Sent By mpeterso Date 2022-10-12 Time 16:39 Rev Time 0.00
Received By mpeterso Date 2022-10-12 Time 16:39 Sent To  
Notes
2022-10-12 16:40:14ALL PLANS PASSED SIGNATURE REVIEW.MP
2022-10-03 12:19:15ELECTRONIC SIGNATURES FOR PLUMBING PLANS ARE VALID. JS

Review Stop Z ZONING
Rev No 1 Status P Date 2022-10-13 Cont ID  
Sent By asangele Date 2022-10-13 Time 14:17 Rev Time 0.00
Received By asangele Date 2022-10-13 Time 14:17 Sent To  
Notes
***NONE***